Showing below up to 250 results in range #1 to #250.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
- Special water or other sensitive receiving watershed design restrictions for stormwater wetlands (14:15, 22 January 2013)
- Recommended maintenance activities for bioretention areas (14:14, 13 February 2013)
- Stormwater infiltration and constraints on infiltration (14:33, 22 November 2013)
- Summary of properties of deicing agents (21:07, 9 March 2016)
- External resources for infiltration (15:50, 26 August 2016)
- Load reductions reported, by TMDL (19:50, 1 August 2017)
- Load reductions reported as a percent from baseline, by TMDL (20:31, 1 August 2017)
- Using the MPCA Simple Estimator to generate load reduction and WLA reporting terms (21:18, 19 August 2019)
- TMDL reporting links: South Metro Mississippi River TSS TMDL (19:29, 23 August 2019)
- MS4 TMDL compliance monitoring strategy summary (15:36, 26 August 2019)
- Priority Actions for Shingle Creek Subwatershed (Table 66) (15:21, 28 August 2019)
- MS4s with applicable temperature WLAs (20:01, 28 August 2019)
- Excerpt from Table 10. Strategies and actions proposed for the Coon Creek subwatershed (14:33, 16 September 2019)
- MS4 Summary for Bennett Lake (15:33, 18 October 2019)
- Massachusetts TSS removal credit for street sweeping in new/redevelopment (MassDEP 2008b) (20:50, 22 September 2020)
- MS4s with applicable dissolved oxygen/oxygen demand WLAs (16:13, 1 April 2021)
- MS4s with no TMDL applications (21:23, 27 September 2021)
- Example construction access agreement (18:32, 11 July 2022)
- Acknowledgements for bioretention (11:27, 15 July 2022)
- Acknowledgments for infiltration (11:28, 15 July 2022)
- Acknowledgements for trees (11:28, 15 July 2022)
- Acknowledgements for street sweeping (11:28, 15 July 2022)
- Acknowledgements for Stormwater and rainwater harvest and use/reuse (11:29, 15 July 2022)
- Acknowledgements for pretreatment (11:29, 15 July 2022)
- Acknowledgements for permeable pavement (11:29, 15 July 2022)
- Acknowledgements for green roofs (11:30, 15 July 2022)
- Acknowledgements for dry swale (11:30, 15 July 2022)
- Acknowledgements for construction stormwater (11:30, 15 July 2022)
- Acknowledgements for iron enhanced sand filters (19:02, 15 July 2022)
- Acknowledgements for manufactured treatment devices (22:33, 15 July 2022)
- Determining the appropriate storage size for a stormwater and rainwater harvest and use/reuse system (18:52, 18 July 2022)
- Water quality considerations for stormwater and rainwater harvest and use/reuse (18:54, 18 July 2022)
- Technical support for stormwater and rainwater harvest and use/reuse (18:57, 18 July 2022)
- Lessons learned and advice from street sweeping programs (19:14, 18 July 2022)
- Street Sweeping Phosphorus Credit Calculator: User Guide (19:15, 18 July 2022)
- Methods for sampling street sweeping material - Standard Operating Procedures (19:15, 18 July 2022)
- TSS credits for street sweeping (19:16, 18 July 2022)
- CADD images for individual best management practices (15:42, 19 July 2022)
- Minnesota specific issues (16:48, 19 July 2022)
- Construction stormwater photo gallery (14:02, 20 July 2022)
- Construction stormwater photo gallery - Berms (14:13, 20 July 2022)
- Construction stormwater photo gallery - Outlet energy dissipation (14:15, 20 July 2022)
- Construction stormwater photo gallery - Vehicle tracking BMPs (14:15, 20 July 2022)
- Construction stormwater photo gallery - Storm drain inlet protection (14:15, 20 July 2022)
- Construction stormwater photo gallery - Check dams (ditch checks, ditch dikes) (14:16, 20 July 2022)
- Construction stormwater photo gallery - Buffer zones (14:26, 20 July 2022)
- Construction stormwater photo gallery - Dewatering (chemical treatment, sediment filtration) (14:44, 20 July 2022)
- Construction stormwater photo gallery - Perimeter control (14:45, 20 July 2022)
- Construction stormwater photo gallery - Sediment basins and traps (14:46, 20 July 2022)
- Construction stormwater photo gallery - Stabilization (14:48, 20 July 2022)
- Construction stormwater technical support documents for manual updates (15:14, 20 July 2022)
- Stormwater blogs (15:53, 20 July 2022)
- Acronyms (17:14, 20 July 2022)
- Symbols (17:14, 20 July 2022)
- Conversion units (17:15, 20 July 2022)
- Protecting Water Quality in Urban Areas: Best Management Practices for Dealing with Storm Water Runoff from Urban, Suburban, and Developing Areas of Minnesota (17:16, 20 July 2022)
- Issue papers (17:19, 20 July 2022)
- Stormwater Steering Committee (17:21, 20 July 2022)
- Stormwater focus group (17:25, 20 July 2022)
- Links (17:57, 20 July 2022)
- About the Minnesota Stormwater Manual (17:59, 20 July 2022)
- What is stormwater and why does it need to be managed? (19:42, 20 July 2022)
- Burnsville rain gardens - retrofitting for water quality (20:03, 20 July 2022)
- Heritage Park - an urban retrofit (20:04, 20 July 2022)
- University of Minnesota Arboretum - runoff model and rain gardens (20:04, 20 July 2022)
- Silver Creek Cliff Trail - meeting stormwater discharge requirements using compost (20:04, 20 July 2022)
- Brown's Creek trout habitat preservation project - thermal protection of a trout stream resource and infiltration within land-locked basins (20:05, 20 July 2022)
- City of Wykoff - stormwater remediation in a karst area (20:05, 20 July 2022)
- Lake Phalen shoreland restoration - shore restoration of a high-use urban lake (20:05, 20 July 2022)
- Sediment Dewatering and Disposal Case Study: City of Eden Prairie Timber Creek Townhomes Stormwater Pond Sediment Removal and Disposal (23:45, 22 July 2022)
- Average Bid trafficker Prices for Spec Year 2014 (14:53, 24 July 2022)
- Average erosion Control blanket bid prices for Spec Year 2014 (14:54, 24 July 2022)
- Average mulch bid prices for spec year 2014 (14:54, 24 July 2022)
- Average seeding bid prices (14:54, 24 July 2022)
- Average turf reinforcement mats bid prices for Spec Year 2014 (14:54, 24 July 2022)
- Bare soil cover types and percent reduction of soil loss (14:54, 24 July 2022)
- Example properties of soil binders for erosion prevention (14:55, 24 July 2022)
- Excerpt from Table 2575-4 - Required Corrective Action (14:55, 24 July 2022)
- Excerpt from Table 2575-4 Required Corrective Action (14:56, 24 July 2022)
- Excerpt from Table 2575-4, Required Corrective Action (14:56, 24 July 2022)
- Expected performance benefits for diversion and working in the dry (14:56, 24 July 2022)
- Expected performance benefits for riprap (14:57, 24 July 2022)
- Expected performance benefits for temporary stream crossings (14:57, 24 July 2022)
- Expected performance for erosion control blankets (14:57, 24 July 2022)
- Expected performance for natural and synthetic mulches (14:57, 24 July 2022)
- Expected performance for tackifiers and soil stabilizers (14:57, 24 July 2022)
- Expected performance for temporary seeding and stabilization practices (14:58, 24 July 2022)
- Expected performance for turf reinforcement mats (14:58, 24 July 2022)
- MnDOT approved - qualified hydraulic mulch products (14:58, 24 July 2022)
- MnDOT approved/qualified hydraulic erosion prevention/control products (14:58, 24 July 2022)
- MnDOT specifications for geotextile under riprap (14:58, 24 July 2022)
- MnDOT specifications for granular filter material under all other riprap (14:59, 24 July 2022)
- MnDOT specifications for granular filter material under Class I random riprap (14:59, 24 July 2022)
- MnDOT standard riprap gradations (14:59, 24 July 2022)
- Mulch types application rates benefits, and limitations (14:59, 24 July 2022)
- Recommendations for temporary stream diversion channel lining (15:00, 24 July 2022)
- Seed mixture selection and other information for various construction site stabilization periods (15:00, 24 July 2022)
- Summary of seeding methods and related information for temporary stabilization (15:00, 24 July 2022)
- Table 2575-4 Required Corrective Action (15:01, 24 July 2022)
- Types of mulch products typically used on construction sites (15:01, 24 July 2022)
- Typical diversion methods for working in the dry and their applicability (15:01, 24 July 2022)
- Typical temporary stream crossing methods and their applicability (15:01, 24 July 2022)
- Unit costs related to diversion and working in the dry (15:01, 24 July 2022)
- Unit costs related to riprap (15:02, 24 July 2022)
- Average Bid Prices for Spec Year 2014 (13:18, 26 July 2022)
- Average Bid Prices Storm drain for spec year 2014 (13:19, 26 July 2022)
- Example check dam types spacing slope applications and longevity (13:19, 26 July 2022)
- Example sizing information for riprap energy dissipators at culvert outlets (13:19, 26 July 2022)
- Expected performance benefits for various dewatering practices (13:20, 26 July 2022)
- Expected performance for check dams (13:20, 26 July 2022)
- Expected performance for outlet energy dissipators (13:20, 26 July 2022)
- Expected performance for perimeter control (13:20, 26 July 2022)
- Expected performance for stabilized earth/soil berms (13:20, 26 July 2022)
- Expected performance for storm drain inlet protection (13:20, 26 July 2022)
- Expected performance for temporary diversion barrier controls (13:23, 26 July 2022)
- Expected performance for temporary vehicle tracking BMPs (13:23, 26 July 2022)
- Expected performance for temporary/permanent sediment traps and basins (13:23, 26 July 2022)
- List of chemicals typically used for treating turbidity (Source: adapted from FHWA, 2008) (13:23, 26 July 2022)
- Maximum runoff velocity (feet per second) for a berm based on soil type (13:23, 26 July 2022)
- Recommended dimensions for stabilized berms (13:24, 26 July 2022)
- Recommended embankment widths for sediment traps (13:24, 26 July 2022)
- Sediment trap sizing table (13:24, 26 July 2022)
- Summary of inspection and maintenance activities for check dams (13:24, 26 July 2022)
- Summary of temporary construction sediment control techniques (13:25, 26 July 2022)
- Temporary Sediment Control - Corrective Actions (13:25, 26 July 2022)
- Temporary Sediment Control: Corrective Actions (13:25, 26 July 2022)
- Temporary Sediment Control: Corrective Actions - check damns (13:25, 26 July 2022)
- Unit costs related to stabilized earth/soil berms (13:25, 26 July 2022)
- Checklist for bacteria source inventory (13:54, 26 July 2022)
- Stormwater filtration practice (grass filters/swales) outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater filtration practice (media filters; includes sand filters, peat mixed with sand, and other) outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater pond outflow concentrations and pollutant removals (14:08, 26 July 2022)
- Stormwater wetland outflow concentrations and pollutant removals (14:09, 26 July 2022)
- Calculating credits for green roofs (14:22, 26 July 2022)
- Calculating credits for infiltration (14:22, 26 July 2022)
- Calculating credits for stormwater wetlands (14:23, 26 July 2022)
- Biofiltration - Raingardens data table (20:21, 26 July 2022)
- Differences between infiltration basins and bioretention basins (20:22, 26 July 2022)
- Minimum bioretention soil media depths recommended to target specific stormwater pollutants (20:23, 26 July 2022)
- Minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more) (20:23, 26 July 2022)
- Summary of bioretention water quality cleansing mechanisms for common stormwater pollutants (20:24, 26 July 2022)
- Typical maintenance problems and activities for infiltration practices (20:25, 26 July 2022)
- Summary of specifications for permeable pavement (20:36, 26 July 2022)
- Calculating credits for stormwater and rainwater harvest and use/reuse (21:16, 28 July 2022)
- Updates to credits and pollutant removal values (14:05, 1 August 2022)
- Calculating credits for stormwater ponds (18:13, 1 August 2022)
- BMP pollutant removal for phosphorus (19:48, 1 August 2022)
- BMP pollutant removal for bacteria (19:48, 1 August 2022)
- BMP pollutant removal for hydrocarbons (19:49, 1 August 2022)
- BMP pollutant removal for metals (19:49, 1 August 2022)
- BMP pollutant removal for total nitrogen (19:49, 1 August 2022)
- BMP pollutant removal for total suspended solids (19:49, 1 August 2022)
- Summary of pollutant removal efficiencies in wet stormwater ponds/stormwater wetlands (19:50, 1 August 2022)
- Relative pollutant reduction for permeable pavement (19:52, 1 August 2022)
- Above ground and below grade storage and settling tables combined (21:28, 1 August 2022)
- Hydrodynamic separator tables combined (21:34, 1 August 2022)
- Other water quality devices tables combined (21:34, 1 August 2022)
- Screening and straining devices tables combined (21:34, 1 August 2022)
- Application guidelines (14:17, 2 August 2022)
- Compost Specifications (14:17, 2 August 2022)
- Product parameters for compost filter berm application (14:18, 2 August 2022)
- Product parameters for compost used for soil amendment and turf establishment (14:18, 2 August 2022)
- Product parameters: Compost blanket (14:18, 2 August 2022)
- Suggested compost filter sock flow rates (14:19, 2 August 2022)
- Water extractable phosphate in composts and land-applied organic materials (14:19, 2 August 2022)
- When purchasing compost to be used for turf establishment (14:19, 2 August 2022)
- Stormwater filtration BMPs - overview (15:07, 2 August 2022)
- Stormwater filtration BMPs - treatment properties (15:07, 2 August 2022)
- Stormwater filtration BMPs – selection considerations (15:08, 2 August 2022)
- Filtration tables combined (15:49, 2 August 2022)
- Chemical and physical properties of biochar (16:43, 2 August 2022)
- Potential biochar stormwater applications (16:44, 2 August 2022)
- Heavy metal concentrations in wood chips (16:52, 2 August 2022)
- Chemical and physical properties of wood chips (16:53, 2 August 2022)
- Chemical and physical properties of coir (16:53, 2 August 2022)
- Particle size distribution of aluminum and iron water treatment residuals (16:59, 2 August 2022)
- Physical properties of aluminum and iron water treatment residuals (17:00, 2 August 2022)
- Chemical properties of water treatment residuals (17:09, 2 August 2022)
- Characteristics of quicklime and hydrated lime (17:10, 2 August 2022)
- Physical properties of spent lime (17:11, 2 August 2022)
- Removal of metals by lime sludge (spent lime) used for water softening (17:13, 2 August 2022)
- Recommended number of soil boring, pits, and permeameter tests for bioretention design (17:57, 2 August 2022)
- Summary of Information to Include on a Boring Log (18:11, 2 August 2022)
- General relationship of soil bulk density to root growth based on soil texture (20:23, 2 August 2022)
- Qualitative comparison of various methods of infiltration rate measurement (20:49, 2 August 2022)
- Saturated hydraulic conductivity values used in long-term continuous simulation modeling analysis (21:11, 2 August 2022)
- Runoff coefficients by land use and soil type (21:12, 2 August 2022)
- Aquifer hydraulic properties (21:14, 2 August 2022)
- Apical shoot scoring system (12:42, 3 August 2022)
- Assessing tree canopy and above ground structures (12:42, 3 August 2022)
- Comparison of different tree techniques (12:42, 3 August 2022)
- Crown distance scoring system (12:42, 3 August 2022)
- Examples of stormwater credits for urban trees (12:43, 3 August 2022)
- Fructification scoring system (12:43, 3 August 2022)
- Indicators of tree condition (12:43, 3 August 2022)
- Qualitative and quantitative evaluation and assessment of trees (12:44, 3 August 2022)
- Relative pollutant reduction for biofiltration (12:44, 3 August 2022)
- Examples of jurisdictions with minimum tree soil volume requirements (13:03, 3 August 2022)
- Signs and symptoms scoring table (13:04, 3 August 2022)
- Summary of recommended bioretention filter media mixes from worldwide sources (13:04, 3 August 2022)
- Summary of recommended hydraulic conductivities of bioretention filter media (13:04, 3 August 2022)
- Summary of recommended installation methods (13:05, 3 August 2022)
- Symptoms and specification table (13:05, 3 August 2022)
- Phosphorus credits for bioretention systems with an underdrain (13:17, 3 August 2022)
- Example spreadsheet - Cumulative volume above normal surface elevation (13:33, 3 August 2022)
- HWL (ft) (13:34, 3 August 2022)
- Pollutant removal percentages for stormwater pond BMPs (13:34, 3 August 2022)
- Pond design sizing criteria (13:35, 3 August 2022)
- Pond stage / storage (13:35, 3 August 2022)
- Recommended hydroperiod standards for wetlands (13:35, 3 August 2022)
- Stormwater wetland design criteria (13:35, 3 August 2022)
- Stormwater Wetland Sizing Parameters (13:37, 3 August 2022)
- Wet detention pond - Channel protection / water quality outlet configuration (13:37, 3 August 2022)
- Wet detention pond - Extreme flood (10-yr 24-hr) outlet configuration (13:37, 3 August 2022)
- Wet detention pond - Over bank protection (10-yr 24-hr) outlet configuration (13:38, 3 August 2022)
- Wet Ponds data table (13:39, 3 August 2022)
- Stormwater Wetland Performance Summary (13:42, 3 August 2022)
- Median pollutant removal percentages for BMPs (14:12, 3 August 2022)
- Table showing typical BMP best attainable effluent concentrations (14:29, 3 August 2022)
- Considerations for construction scheduling (14:44, 3 August 2022)
- Construction site BMPs and their function and control mechanisms (14:45, 3 August 2022)
- Examples of RUSLE cover management factors for construction sites (14:45, 3 August 2022)
- Examples of RUSLE practice management factors for construction sites (14:46, 3 August 2022)
- Relative cost and effectiveness for common construction BMPs (14:46, 3 August 2022)
- Typical recommendations for BMP removal for common construction stormwater BMPs (14:46, 3 August 2022)
- Examples of BMP selection options for various construction site risk conditions (14:46, 3 August 2022)
- Typical inspection/maintenance frequencies for stormwater wetlands (15:08, 3 August 2022)
- Typical maintenance activities for infiltration trenches (15:08, 3 August 2022)
- Typical maintenance problems for infiltration trenches and basins (15:08, 3 August 2022)
- Maintenance costs for stormwater and rainwater harvest and use/reuse practices (15:16, 3 August 2022)
- Example O&M plans, checklists, reports, and maintenance agreements for swales (15:35, 3 August 2022)
- Common problems and how to troubleshoot them for swales (15:36, 3 August 2022)
- Overview and schedule of general maintenance activities for swales (15:36, 3 August 2022)
- Common problems and how to troubleshoot them for vegetated filter strips (15:38, 3 August 2022)
- Overview and schedule of general maintenance activities for vegetated filter strips (15:39, 3 August 2022)
- Typical winter decommission and maintenance tasks for rainwater harvesting (15:46, 3 August 2022)
- Overview and schedule of general maintenance activities for Stormwater and Rainwater Harvest and Use/Reuse Practices (15:48, 3 August 2022)
- Common problems and how to troubleshoot them for Stormwater and Rainwater Harvest and Use/Reuse Practices (15:49, 3 August 2022)
- Overview and schedule of general maintenance activities for wetlands (15:49, 3 August 2022)
- Common problems and how to troubleshoot them for wetlands (15:50, 3 August 2022)
- Common problems and how to troubleshoot them for permeable pavement practices (15:55, 3 August 2022)
- Overview and schedule of general maintenance activities for permeable pavement practices (15:55, 3 August 2022)
- Example O&M plans, checklists, reports, and maintenance agreements for stormwater and rainwater harvest and use/reuse practices (16:09, 3 August 2022)
- Green infrastructure operation and maintenance catalog wiki table (16:11, 3 August 2022)
- Industrial & Commercial Pollution Prevention Methods (16:29, 3 August 2022)
- Industrial & Commercial practices pollutant controls (16:29, 3 August 2022)
- Industrial prevention practices for TP (16:29, 3 August 2022)
- Industrial prevention practices for TSS (16:29, 3 August 2022)
- Municipal pollution prevention methods (16:29, 3 August 2022)
- Municipal practices pollutant controls (16:30, 3 August 2022)
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)