Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Special water or other sensitive receiving watershed design restrictions for stormwater wetlands‏‎ (14:15, 22 January 2013)
  2. Recommended maintenance activities for bioretention areas‏‎ (14:14, 13 February 2013)
  3. Stormwater infiltration and constraints on infiltration‏‎ (14:33, 22 November 2013)
  4. Summary of properties of deicing agents‏‎ (21:07, 9 March 2016)
  5. External resources for infiltration‏‎ (15:50, 26 August 2016)
  6. Load reductions reported, by TMDL‏‎ (19:50, 1 August 2017)
  7. Load reductions reported as a percent from baseline, by TMDL‏‎ (20:31, 1 August 2017)
  8. Using the MPCA Simple Estimator to generate load reduction and WLA reporting terms‏‎ (21:18, 19 August 2019)
  9. TMDL reporting links: South Metro Mississippi River TSS TMDL‏‎ (19:29, 23 August 2019)
  10. MS4 TMDL compliance monitoring strategy summary‏‎ (15:36, 26 August 2019)
  11. Priority Actions for Shingle Creek Subwatershed (Table 66)‏‎ (15:21, 28 August 2019)
  12. MS4s with applicable temperature WLAs‏‎ (20:01, 28 August 2019)
  13. Excerpt from Table 10. Strategies and actions proposed for the Coon Creek subwatershed‏‎ (14:33, 16 September 2019)
  14. MS4 Summary for Bennett Lake‏‎ (15:33, 18 October 2019)
  15. Massachusetts TSS removal credit for street sweeping in new/redevelopment (MassDEP 2008b)‏‎ (20:50, 22 September 2020)
  16. MS4s with applicable dissolved oxygen/oxygen demand WLAs‏‎ (16:13, 1 April 2021)
  17. MS4s with no TMDL applications‏‎ (21:23, 27 September 2021)
  18. Example construction access agreement‏‎ (18:32, 11 July 2022)
  19. Acknowledgements for bioretention‏‎ (11:27, 15 July 2022)
  20. Acknowledgments for infiltration‏‎ (11:28, 15 July 2022)
  21. Acknowledgements for trees‏‎ (11:28, 15 July 2022)
  22. Acknowledgements for street sweeping‏‎ (11:28, 15 July 2022)
  23. Acknowledgements for Stormwater and rainwater harvest and use/reuse‏‎ (11:29, 15 July 2022)
  24. Acknowledgements for pretreatment‏‎ (11:29, 15 July 2022)
  25. Acknowledgements for permeable pavement‏‎ (11:29, 15 July 2022)
  26. Acknowledgements for green roofs‏‎ (11:30, 15 July 2022)
  27. Acknowledgements for dry swale‏‎ (11:30, 15 July 2022)
  28. Acknowledgements for construction stormwater‏‎ (11:30, 15 July 2022)
  29. Acknowledgements for iron enhanced sand filters‏‎ (19:02, 15 July 2022)
  30. Acknowledgements for manufactured treatment devices‏‎ (22:33, 15 July 2022)
  31. Determining the appropriate storage size for a stormwater and rainwater harvest and use/reuse system‏‎ (18:52, 18 July 2022)
  32. Water quality considerations for stormwater and rainwater harvest and use/reuse‏‎ (18:54, 18 July 2022)
  33. Technical support for stormwater and rainwater harvest and use/reuse‏‎ (18:57, 18 July 2022)
  34. Lessons learned and advice from street sweeping programs‏‎ (19:14, 18 July 2022)
  35. Street Sweeping Phosphorus Credit Calculator: User Guide‏‎ (19:15, 18 July 2022)
  36. Methods for sampling street sweeping material - Standard Operating Procedures‏‎ (19:15, 18 July 2022)
  37. TSS credits for street sweeping‏‎ (19:16, 18 July 2022)
  38. CADD images for individual best management practices‏‎ (15:42, 19 July 2022)
  39. Minnesota specific issues‏‎ (16:48, 19 July 2022)
  40. Construction stormwater photo gallery‏‎ (14:02, 20 July 2022)
  41. Construction stormwater photo gallery - Berms‏‎ (14:13, 20 July 2022)
  42. Construction stormwater photo gallery - Outlet energy dissipation‏‎ (14:15, 20 July 2022)
  43. Construction stormwater photo gallery - Vehicle tracking BMPs‏‎ (14:15, 20 July 2022)
  44. Construction stormwater photo gallery - Storm drain inlet protection‏‎ (14:15, 20 July 2022)
  45. Construction stormwater photo gallery - Check dams (ditch checks, ditch dikes)‏‎ (14:16, 20 July 2022)
  46. Construction stormwater photo gallery - Buffer zones‏‎ (14:26, 20 July 2022)
  47. Construction stormwater photo gallery - Dewatering (chemical treatment, sediment filtration)‏‎ (14:44, 20 July 2022)
  48. Construction stormwater photo gallery - Perimeter control‏‎ (14:45, 20 July 2022)
  49. Construction stormwater photo gallery - Sediment basins and traps‏‎ (14:46, 20 July 2022)
  50. Construction stormwater photo gallery - Stabilization‏‎ (14:48, 20 July 2022)
  51. Construction stormwater technical support documents for manual updates‏‎ (15:14, 20 July 2022)
  52. Stormwater blogs‏‎ (15:53, 20 July 2022)
  53. Acronyms‏‎ (17:14, 20 July 2022)
  54. Symbols‏‎ (17:14, 20 July 2022)
  55. Conversion units‏‎ (17:15, 20 July 2022)
  56. Protecting Water Quality in Urban Areas: Best Management Practices for Dealing with Storm Water Runoff from Urban, Suburban, and Developing Areas of Minnesota‏‎ (17:16, 20 July 2022)
  57. Issue papers‏‎ (17:19, 20 July 2022)
  58. Stormwater Steering Committee‏‎ (17:21, 20 July 2022)
  59. Stormwater focus group‏‎ (17:25, 20 July 2022)
  60. Links‏‎ (17:57, 20 July 2022)
  61. About the Minnesota Stormwater Manual‏‎ (17:59, 20 July 2022)
  62. What is stormwater and why does it need to be managed?‏‎ (19:42, 20 July 2022)
  63. Burnsville rain gardens - retrofitting for water quality‏‎ (20:03, 20 July 2022)
  64. Heritage Park - an urban retrofit‏‎ (20:04, 20 July 2022)
  65. University of Minnesota Arboretum - runoff model and rain gardens‏‎ (20:04, 20 July 2022)
  66. Silver Creek Cliff Trail - meeting stormwater discharge requirements using compost‏‎ (20:04, 20 July 2022)
  67. Brown's Creek trout habitat preservation project - thermal protection of a trout stream resource and infiltration within land-locked basins‏‎ (20:05, 20 July 2022)
  68. City of Wykoff - stormwater remediation in a karst area‏‎ (20:05, 20 July 2022)
  69. Lake Phalen shoreland restoration - shore restoration of a high-use urban lake‏‎ (20:05, 20 July 2022)
  70. Sediment Dewatering and Disposal Case Study: City of Eden Prairie Timber Creek Townhomes Stormwater Pond Sediment Removal and Disposal‏‎ (23:45, 22 July 2022)
  71. Average Bid trafficker Prices for Spec Year 2014‏‎ (14:53, 24 July 2022)
  72. Average erosion Control blanket bid prices for Spec Year 2014‏‎ (14:54, 24 July 2022)
  73. Average mulch bid prices for spec year 2014‏‎ (14:54, 24 July 2022)
  74. Average seeding bid prices‏‎ (14:54, 24 July 2022)
  75. Average turf reinforcement mats bid prices for Spec Year 2014‏‎ (14:54, 24 July 2022)
  76. Bare soil cover types and percent reduction of soil loss‏‎ (14:54, 24 July 2022)
  77. Example properties of soil binders for erosion prevention‏‎ (14:55, 24 July 2022)
  78. Excerpt from Table 2575-4 - Required Corrective Action‏‎ (14:55, 24 July 2022)
  79. Excerpt from Table 2575-4 Required Corrective Action‏‎ (14:56, 24 July 2022)
  80. Excerpt from Table 2575-4, Required Corrective Action‏‎ (14:56, 24 July 2022)
  81. Expected performance benefits for diversion and working in the dry‏‎ (14:56, 24 July 2022)
  82. Expected performance benefits for riprap‏‎ (14:57, 24 July 2022)
  83. Expected performance benefits for temporary stream crossings‏‎ (14:57, 24 July 2022)
  84. Expected performance for erosion control blankets‏‎ (14:57, 24 July 2022)
  85. Expected performance for natural and synthetic mulches‏‎ (14:57, 24 July 2022)
  86. Expected performance for tackifiers and soil stabilizers‏‎ (14:57, 24 July 2022)
  87. Expected performance for temporary seeding and stabilization practices‏‎ (14:58, 24 July 2022)
  88. Expected performance for turf reinforcement mats‏‎ (14:58, 24 July 2022)
  89. MnDOT approved - qualified hydraulic mulch products‏‎ (14:58, 24 July 2022)
  90. MnDOT approved/qualified hydraulic erosion prevention/control products‏‎ (14:58, 24 July 2022)
  91. MnDOT specifications for geotextile under riprap‏‎ (14:58, 24 July 2022)
  92. MnDOT specifications for granular filter material under all other riprap‏‎ (14:59, 24 July 2022)
  93. MnDOT specifications for granular filter material under Class I random riprap‏‎ (14:59, 24 July 2022)
  94. MnDOT standard riprap gradations‏‎ (14:59, 24 July 2022)
  95. Mulch types application rates benefits, and limitations‏‎ (14:59, 24 July 2022)
  96. Recommendations for temporary stream diversion channel lining‏‎ (15:00, 24 July 2022)
  97. Seed mixture selection and other information for various construction site stabilization periods‏‎ (15:00, 24 July 2022)
  98. Summary of seeding methods and related information for temporary stabilization‏‎ (15:00, 24 July 2022)
  99. Table 2575-4 Required Corrective Action‏‎ (15:01, 24 July 2022)
  100. Types of mulch products typically used on construction sites‏‎ (15:01, 24 July 2022)
  101. Typical diversion methods for working in the dry and their applicability‏‎ (15:01, 24 July 2022)
  102. Typical temporary stream crossing methods and their applicability‏‎ (15:01, 24 July 2022)
  103. Unit costs related to diversion and working in the dry‏‎ (15:01, 24 July 2022)
  104. Unit costs related to riprap‏‎ (15:02, 24 July 2022)
  105. Average Bid Prices for Spec Year 2014‏‎ (13:18, 26 July 2022)
  106. Average Bid Prices Storm drain for spec year 2014‏‎ (13:19, 26 July 2022)
  107. Example check dam types spacing slope applications and longevity‏‎ (13:19, 26 July 2022)
  108. Example sizing information for riprap energy dissipators at culvert outlets‏‎ (13:19, 26 July 2022)
  109. Expected performance benefits for various dewatering practices‏‎ (13:20, 26 July 2022)
  110. Expected performance for check dams‏‎ (13:20, 26 July 2022)
  111. Expected performance for outlet energy dissipators‏‎ (13:20, 26 July 2022)
  112. Expected performance for perimeter control‏‎ (13:20, 26 July 2022)
  113. Expected performance for stabilized earth/soil berms‏‎ (13:20, 26 July 2022)
  114. Expected performance for storm drain inlet protection‏‎ (13:20, 26 July 2022)
  115. Expected performance for temporary diversion barrier controls‏‎ (13:23, 26 July 2022)
  116. Expected performance for temporary vehicle tracking BMPs‏‎ (13:23, 26 July 2022)
  117. Expected performance for temporary/permanent sediment traps and basins‏‎ (13:23, 26 July 2022)
  118. List of chemicals typically used for treating turbidity (Source: adapted from FHWA, 2008)‏‎ (13:23, 26 July 2022)
  119. Maximum runoff velocity (feet per second) for a berm based on soil type‏‎ (13:23, 26 July 2022)
  120. Recommended dimensions for stabilized berms‏‎ (13:24, 26 July 2022)
  121. Recommended embankment widths for sediment traps‏‎ (13:24, 26 July 2022)
  122. Sediment trap sizing table‏‎ (13:24, 26 July 2022)
  123. Summary of inspection and maintenance activities for check dams‏‎ (13:24, 26 July 2022)
  124. Summary of temporary construction sediment control techniques‏‎ (13:25, 26 July 2022)
  125. Temporary Sediment Control - Corrective Actions‏‎ (13:25, 26 July 2022)
  126. Temporary Sediment Control: Corrective Actions‏‎ (13:25, 26 July 2022)
  127. Temporary Sediment Control: Corrective Actions - check damns‏‎ (13:25, 26 July 2022)
  128. Unit costs related to stabilized earth/soil berms‏‎ (13:25, 26 July 2022)
  129. Checklist for bacteria source inventory‏‎ (13:54, 26 July 2022)
  130. Stormwater filtration practice (grass filters/swales) outflow concentrations and pollutant removals‏‎ (14:08, 26 July 2022)
  131. Stormwater filtration practice (media filters; includes sand filters, peat mixed with sand, and other) outflow concentrations and pollutant removals‏‎ (14:08, 26 July 2022)
  132. Stormwater pond outflow concentrations and pollutant removals‏‎ (14:08, 26 July 2022)
  133. Stormwater wetland outflow concentrations and pollutant removals‏‎ (14:09, 26 July 2022)
  134. Calculating credits for green roofs‏‎ (14:22, 26 July 2022)
  135. Calculating credits for infiltration‏‎ (14:22, 26 July 2022)
  136. Calculating credits for stormwater wetlands‏‎ (14:23, 26 July 2022)
  137. Biofiltration - Raingardens data table‏‎ (20:21, 26 July 2022)
  138. Differences between infiltration basins and bioretention basins‏‎ (20:22, 26 July 2022)
  139. Minimum bioretention soil media depths recommended to target specific stormwater pollutants‏‎ (20:23, 26 July 2022)
  140. Minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more)‏‎ (20:23, 26 July 2022)
  141. Summary of bioretention water quality cleansing mechanisms for common stormwater pollutants‏‎ (20:24, 26 July 2022)
  142. Typical maintenance problems and activities for infiltration practices‏‎ (20:25, 26 July 2022)
  143. Summary of specifications for permeable pavement‏‎ (20:36, 26 July 2022)
  144. Calculating credits for stormwater and rainwater harvest and use/reuse‏‎ (21:16, 28 July 2022)
  145. Updates to credits and pollutant removal values‏‎ (14:05, 1 August 2022)
  146. Calculating credits for stormwater ponds‏‎ (18:13, 1 August 2022)
  147. BMP pollutant removal for phosphorus‏‎ (19:48, 1 August 2022)
  148. BMP pollutant removal for bacteria‏‎ (19:48, 1 August 2022)
  149. BMP pollutant removal for hydrocarbons‏‎ (19:49, 1 August 2022)
  150. BMP pollutant removal for metals‏‎ (19:49, 1 August 2022)
  151. BMP pollutant removal for total nitrogen‏‎ (19:49, 1 August 2022)
  152. BMP pollutant removal for total suspended solids‏‎ (19:49, 1 August 2022)
  153. Summary of pollutant removal efficiencies in wet stormwater ponds/stormwater wetlands‏‎ (19:50, 1 August 2022)
  154. Relative pollutant reduction for permeable pavement‏‎ (19:52, 1 August 2022)
  155. Above ground and below grade storage and settling tables combined‏‎ (21:28, 1 August 2022)
  156. Hydrodynamic separator tables combined‏‎ (21:34, 1 August 2022)
  157. Other water quality devices tables combined‏‎ (21:34, 1 August 2022)
  158. Screening and straining devices tables combined‏‎ (21:34, 1 August 2022)
  159. Application guidelines‏‎ (14:17, 2 August 2022)
  160. Compost Specifications‏‎ (14:17, 2 August 2022)
  161. Product parameters for compost filter berm application‏‎ (14:18, 2 August 2022)
  162. Product parameters for compost used for soil amendment and turf establishment‏‎ (14:18, 2 August 2022)
  163. Product parameters: Compost blanket‏‎ (14:18, 2 August 2022)
  164. Suggested compost filter sock flow rates‏‎ (14:19, 2 August 2022)
  165. Water extractable phosphate in composts and land-applied organic materials‏‎ (14:19, 2 August 2022)
  166. When purchasing compost to be used for turf establishment‏‎ (14:19, 2 August 2022)
  167. Stormwater filtration BMPs - overview‏‎ (15:07, 2 August 2022)
  168. Stormwater filtration BMPs - treatment properties‏‎ (15:07, 2 August 2022)
  169. Stormwater filtration BMPs – selection considerations‏‎ (15:08, 2 August 2022)
  170. Filtration tables combined‏‎ (15:49, 2 August 2022)
  171. Chemical and physical properties of biochar‏‎ (16:43, 2 August 2022)
  172. Potential biochar stormwater applications‏‎ (16:44, 2 August 2022)
  173. Heavy metal concentrations in wood chips‏‎ (16:52, 2 August 2022)
  174. Chemical and physical properties of wood chips‏‎ (16:53, 2 August 2022)
  175. Chemical and physical properties of coir‏‎ (16:53, 2 August 2022)
  176. Particle size distribution of aluminum and iron water treatment residuals‏‎ (16:59, 2 August 2022)
  177. Physical properties of aluminum and iron water treatment residuals‏‎ (17:00, 2 August 2022)
  178. Chemical properties of water treatment residuals‏‎ (17:09, 2 August 2022)
  179. Characteristics of quicklime and hydrated lime‏‎ (17:10, 2 August 2022)
  180. Physical properties of spent lime‏‎ (17:11, 2 August 2022)
  181. Removal of metals by lime sludge (spent lime) used for water softening‏‎ (17:13, 2 August 2022)
  182. Recommended number of soil boring, pits, and permeameter tests for bioretention design‏‎ (17:57, 2 August 2022)
  183. Summary of Information to Include on a Boring Log‏‎ (18:11, 2 August 2022)
  184. General relationship of soil bulk density to root growth based on soil texture‏‎ (20:23, 2 August 2022)
  185. Qualitative comparison of various methods of infiltration rate measurement‏‎ (20:49, 2 August 2022)
  186. Saturated hydraulic conductivity values used in long-term continuous simulation modeling analysis‏‎ (21:11, 2 August 2022)
  187. Runoff coefficients by land use and soil type‏‎ (21:12, 2 August 2022)
  188. Aquifer hydraulic properties‏‎ (21:14, 2 August 2022)
  189. Apical shoot scoring system‏‎ (12:42, 3 August 2022)
  190. Assessing tree canopy and above ground structures‏‎ (12:42, 3 August 2022)
  191. Comparison of different tree techniques‏‎ (12:42, 3 August 2022)
  192. Crown distance scoring system‏‎ (12:42, 3 August 2022)
  193. Examples of stormwater credits for urban trees‏‎ (12:43, 3 August 2022)
  194. Fructification scoring system‏‎ (12:43, 3 August 2022)
  195. Indicators of tree condition‏‎ (12:43, 3 August 2022)
  196. Qualitative and quantitative evaluation and assessment of trees‏‎ (12:44, 3 August 2022)
  197. Relative pollutant reduction for biofiltration‏‎ (12:44, 3 August 2022)
  198. Examples of jurisdictions with minimum tree soil volume requirements‏‎ (13:03, 3 August 2022)
  199. Signs and symptoms scoring table‏‎ (13:04, 3 August 2022)
  200. Summary of recommended bioretention filter media mixes from worldwide sources‏‎ (13:04, 3 August 2022)
  201. Summary of recommended hydraulic conductivities of bioretention filter media‏‎ (13:04, 3 August 2022)
  202. Summary of recommended installation methods‏‎ (13:05, 3 August 2022)
  203. Symptoms and specification table‏‎ (13:05, 3 August 2022)
  204. Phosphorus credits for bioretention systems with an underdrain‏‎ (13:17, 3 August 2022)
  205. Example spreadsheet - Cumulative volume above normal surface elevation‏‎ (13:33, 3 August 2022)
  206. HWL (ft)‏‎ (13:34, 3 August 2022)
  207. Pollutant removal percentages for stormwater pond BMPs‏‎ (13:34, 3 August 2022)
  208. Pond design sizing criteria‏‎ (13:35, 3 August 2022)
  209. Pond stage / storage‏‎ (13:35, 3 August 2022)
  210. Recommended hydroperiod standards for wetlands‏‎ (13:35, 3 August 2022)
  211. Stormwater wetland design criteria‏‎ (13:35, 3 August 2022)
  212. Stormwater Wetland Sizing Parameters‏‎ (13:37, 3 August 2022)
  213. Wet detention pond - Channel protection / water quality outlet configuration‏‎ (13:37, 3 August 2022)
  214. Wet detention pond - Extreme flood (10-yr 24-hr) outlet configuration‏‎ (13:37, 3 August 2022)
  215. Wet detention pond - Over bank protection (10-yr 24-hr) outlet configuration‏‎ (13:38, 3 August 2022)
  216. Wet Ponds data table‏‎ (13:39, 3 August 2022)
  217. Stormwater Wetland Performance Summary‏‎ (13:42, 3 August 2022)
  218. Median pollutant removal percentages for BMPs‏‎ (14:12, 3 August 2022)
  219. Table showing typical BMP best attainable effluent concentrations‏‎ (14:29, 3 August 2022)
  220. Considerations for construction scheduling‏‎ (14:44, 3 August 2022)
  221. Construction site BMPs and their function and control mechanisms‏‎ (14:45, 3 August 2022)
  222. Examples of RUSLE cover management factors for construction sites‏‎ (14:45, 3 August 2022)
  223. Examples of RUSLE practice management factors for construction sites‏‎ (14:46, 3 August 2022)
  224. Relative cost and effectiveness for common construction BMPs‏‎ (14:46, 3 August 2022)
  225. Typical recommendations for BMP removal for common construction stormwater BMPs‏‎ (14:46, 3 August 2022)
  226. Examples of BMP selection options for various construction site risk conditions‏‎ (14:46, 3 August 2022)
  227. Typical inspection/maintenance frequencies for stormwater wetlands‏‎ (15:08, 3 August 2022)
  228. Typical maintenance activities for infiltration trenches‏‎ (15:08, 3 August 2022)
  229. Typical maintenance problems for infiltration trenches and basins‏‎ (15:08, 3 August 2022)
  230. Maintenance costs for stormwater and rainwater harvest and use/reuse practices‏‎ (15:16, 3 August 2022)
  231. Example O&M plans, checklists, reports, and maintenance agreements for swales‏‎ (15:35, 3 August 2022)
  232. Common problems and how to troubleshoot them for swales‏‎ (15:36, 3 August 2022)
  233. Overview and schedule of general maintenance activities for swales‏‎ (15:36, 3 August 2022)
  234. Common problems and how to troubleshoot them for vegetated filter strips‏‎ (15:38, 3 August 2022)
  235. Overview and schedule of general maintenance activities for vegetated filter strips‏‎ (15:39, 3 August 2022)
  236. Typical winter decommission and maintenance tasks for rainwater harvesting‏‎ (15:46, 3 August 2022)
  237. Overview and schedule of general maintenance activities for Stormwater and Rainwater Harvest and Use/Reuse Practices‏‎ (15:48, 3 August 2022)
  238. Common problems and how to troubleshoot them for Stormwater and Rainwater Harvest and Use/Reuse Practices‏‎ (15:49, 3 August 2022)
  239. Overview and schedule of general maintenance activities for wetlands‏‎ (15:49, 3 August 2022)
  240. Common problems and how to troubleshoot them for wetlands‏‎ (15:50, 3 August 2022)
  241. Common problems and how to troubleshoot them for permeable pavement practices‏‎ (15:55, 3 August 2022)
  242. Overview and schedule of general maintenance activities for permeable pavement practices‏‎ (15:55, 3 August 2022)
  243. Example O&M plans, checklists, reports, and maintenance agreements for stormwater and rainwater harvest and use/reuse practices‏‎ (16:09, 3 August 2022)
  244. Green infrastructure operation and maintenance catalog wiki table‏‎ (16:11, 3 August 2022)
  245. Industrial & Commercial Pollution Prevention Methods‏‎ (16:29, 3 August 2022)
  246. Industrial & Commercial practices pollutant controls‏‎ (16:29, 3 August 2022)
  247. Industrial prevention practices for TP‏‎ (16:29, 3 August 2022)
  248. Industrial prevention practices for TSS‏‎ (16:29, 3 August 2022)
  249. Municipal pollution prevention methods‏‎ (16:29, 3 August 2022)
  250. Municipal practices pollutant controls‏‎ (16:30, 3 August 2022)
  251. Municipal prevention practices for bacteria‏‎ (16:30, 3 August 2022)
  252. Municipal prevention practices for TP‏‎ (16:31, 3 August 2022)
  253. Municipal prevention practices for TSS‏‎ (16:31, 3 August 2022)
  254. Residential pollution prevention methods‏‎ (16:31, 3 August 2022)
  255. Residential practices pollutant controls‏‎ (16:31, 3 August 2022)
  256. Residential prevention practices for bacteria‏‎ (16:32, 3 August 2022)
  257. Residential prevention practices for TP‏‎ (16:32, 3 August 2022)
  258. Residential prevention practices for TSS‏‎ (16:33, 3 August 2022)
  259. Screening and straining devices - general information‏‎ (18:14, 3 August 2022)
  260. Screening and straining devices - system design information‏‎ (18:18, 3 August 2022)
  261. Screening and straining devices - system and component sizing‏‎ (18:20, 3 August 2022)
  262. Screening and straining devices - installation and maintenance recommendations‏‎ (18:26, 3 August 2022)
  263. Hydrodynamic separation devices - pollutant removal characteristics‏‎ (18:29, 3 August 2022)
  264. Hydrodynamic separation devices - installation and maintenance recommendations‏‎ (18:45, 3 August 2022)
  265. Hydrodynamic separation devices - system and component sizing‏‎ (18:54, 3 August 2022)
  266. Hydrodynamic separation devices - system design information‏‎ (19:02, 3 August 2022)
  267. Filtration - pollutant removal information‏‎ (19:05, 3 August 2022)
  268. Filtration - system design information‏‎ (19:05, 3 August 2022)
  269. Filtration - system and component sizing‏‎ (19:05, 3 August 2022)
  270. Filtration - installation and maintenance recommendations‏‎ (19:06, 3 August 2022)
  271. Advantages and disadvantages of above- or below-ground tanks and stormwater ponds‏‎ (19:37, 3 August 2022)
  272. Common roofing materials and water quality considerations‏‎ (19:37, 3 August 2022)
  273. Comparison of materials used for rainwater harvesting systems‏‎ (19:37, 3 August 2022)
  274. Comparison of properties of different types of storage tanks‏‎ (19:38, 3 August 2022)
  275. Concentrations of Zinc, Copper, and Lead in Roof Runoff Based on Roof Material Type‏‎ (19:38, 3 August 2022)
  276. Common pre-storage practices used in stormwater harvesting and use systems‏‎ (19:45, 3 August 2022)
  277. Design Considerations for Automated Makeup Water Supply Systems‏‎ (19:46, 3 August 2022)
  278. Estimated iimpact of stormwater reuse for irrigation on average annual runoff reduction‏‎ (19:48, 3 August 2022)
  279. Examples of potential exposure types and pathways‏‎ (19:48, 3 August 2022)
  280. Examples of the estimated pollutant load reductions for a stormwater reuse storage system sized for the average storm event runoff volume‏‎ (19:48, 3 August 2022)
  281. Examples of the estimated runoff volume reduction for a stormwater reuse storage system sized for the average storm event runoff volume‏‎ (19:49, 3 August 2022)
  282. Elements of design, operation, and maintenance that address potential risks associated with stormwater harvesting and use‏‎ (19:53, 3 August 2022)
  283. General inspection and maintenance guidelines for stormwater harvest and use systems‏‎ (20:00, 3 August 2022)
  284. Harvested stormwater beneficial uses‏‎ (20:00, 3 August 2022)
  285. Harvested stormwater site survey and information worksheet‏‎ (20:01, 3 August 2022)
  286. Maximum Detention Time - Average Daily Temperature‏‎ (20:02, 3 August 2022)
  287. Minimum Water Quality‏‎ (20:02, 3 August 2022)
  288. Minimum water quality for rainwater catchment systems‏‎ (20:03, 3 August 2022)
  289. MPCA municipal wastewater reuse water quality treatment limits (modified to only include irrigation-related uses)‏‎ (20:03, 3 August 2022)
  290. Post-Storage Treatment Process Considerations‏‎ (20:07, 3 August 2022)
  291. Rainwater harvesting overflow discharge location - methods‏‎ (20:08, 3 August 2022)
  292. Risk-based treatment requirements for stormwater harvest and use systems‏‎ (20:08, 3 August 2022)
  293. Stormwater Harvest and Use Funding Sources‏‎ (20:09, 3 August 2022)
  294. Stormwater Harvesting and Use Component Checklist and Cost Units‏‎ (20:11, 3 August 2022)
  295. Summary of California water recycling criteria (summarized from Table R.3b.1 of the Metropolitan Council Stormwater Reuse Manual)‏‎ (20:14, 3 August 2022)
  296. Summary of pollutants typically found in stormwater by source area‏‎ (20:16, 3 August 2022)
  297. Summary of sate of Minnesota water quality guidelines for stormwater harvesting and reuse systems for Irrigation‏‎ (20:16, 3 August 2022)
  298. Summary of treatment practices used in stormwater harvest and use systems‏‎ (20:16, 3 August 2022)
  299. Summary of water reuse criteria for irrigation of parks, playgrounds, schoolyards, and similar areas from reuse programs from several states‏‎ (20:16, 3 August 2022)
  300. Summary of water reuse criteria for select nonpotable applications from reuse programs from several states‏‎ (20:17, 3 August 2022)
  301. Typical pollutants found in stormwater collected from different source areas‏‎ (20:19, 3 August 2022)
  302. Typical Roof Runoff Quality in Minneapolis and Wisconsin‏‎ (20:19, 3 August 2022)
  303. Typical stormwater pollutants, summary of sources and potential concerns for harvest and use‏‎ (20:20, 3 August 2022)
  304. Water harvesting and use system matrix‏‎ (20:20, 3 August 2022)
  305. Water reuse key site considerations‏‎ (20:20, 3 August 2022)
  306. Average costs for subsoiling for MnDOT projects from 2002-2012‏‎ (20:33, 3 August 2022)
  307. Bioretention device cost estimate worksheet‏‎ (20:33, 3 August 2022)
  308. Check dam related average Bid Prices‏‎ (20:33, 3 August 2022)
  309. Comparison of Annual Maintenance Cost Estimator Models to Study Data‏‎ (20:34, 3 August 2022)
  310. Comparison of Construction Cost Estimator Models to Study Data‏‎ (20:34, 3 August 2022)
  311. Contractor bid averages for installation of three 29,000 gallon underground storage tanks‏‎ (20:35, 3 August 2022)
  312. Cost components for bioretention practices‏‎ (20:35, 3 August 2022)
  313. Cost components for stormwater ponds‏‎ (20:35, 3 August 2022)
  314. Filtration data table‏‎ (20:36, 3 August 2022)
  315. Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank‏‎ (20:41, 3 August 2022)
  316. Infiltration basin cost estimate worksheet‏‎ (20:43, 3 August 2022)
  317. Infiltration practices cost components‏‎ (20:44, 3 August 2022)
  318. Itemized stormwater harvest and use system component costs‏‎ (20:44, 3 August 2022)
  319. Stormwater pond cost estimate worksheet‏‎ (20:44, 3 August 2022)
  320. Stormwater wetland cost estimate worksheet‏‎ (20:44, 3 August 2022)
  321. Summary of Annual BMP Maintenance Costs from Estimator Models‏‎ (20:45, 3 August 2022)
  322. Summary of Annual Maintenance Cost Data Collected‏‎ (20:45, 3 August 2022)
  323. Summary of BMP Construction Costs from Estimator Models‏‎ (20:46, 3 August 2022)
  324. Summary of BMP Land Areas from Estimator Models‏‎ (20:46, 3 August 2022)
  325. Summary of Construction Cost Data Collected‏‎ (20:47, 3 August 2022)
  326. Comparison of most common extensive green roof planting methods‏‎ (21:04, 3 August 2022)
  327. General characteristics of extensive and intensive green roofs‏‎ (21:04, 3 August 2022)
  328. Plant materials for use in extensive green roof systems‏‎ (21:04, 3 August 2022)
  329. Potential roles in green roof design‏‎ (21:08, 3 August 2022)
  330. Recommended green roof growing medium parameter ranges‏‎ (21:23, 3 August 2022)
  331. Stormwater model and calculator comparisons‏‎ (13:37, 4 August 2022)
  332. Curve number for Use with pre-settlement conditions‏‎ (13:40, 4 August 2022)
  333. Classification of models by model type‏‎ (13:41, 4 August 2022)
  334. Sources of data for use in stormwater models‏‎ (13:41, 4 August 2022)
  335. Curve numbers for antecedent mositure condition 2‏‎ (13:42, 4 August 2022)
  336. NOAA Atlas 14 recurrence intervals and storm durations‏‎ (13:44, 4 August 2022)
  337. Comparison of precipitation totals from TP-40, Bulletin 71, and Atlas 14‏‎ (13:45, 4 August 2022)
  338. Cumulative percent storm rainfall Bulletin 71‏‎ (13:46, 4 August 2022)
  339. Cumulative percent storm rainfall Atlas 14‏‎ (13:46, 4 August 2022)
  340. Runoff coefficients for 5 to 10 year storms‏‎ (13:47, 4 August 2022)
  341. Infiltration rates observed in Minnesota‏‎ (13:49, 4 August 2022)
  342. Met Council and Manual land use categories‏‎ (14:27, 4 August 2022)
  343. General MPCA Simple Estimator result QAQC list‏‎ (14:28, 4 August 2022)
  344. MPCA Simple Estimator default BMP parameter assumptions‏‎ (14:28, 4 August 2022)
  345. MPCA Simple Estimator runoff coefficient and pollutant event mean concentration (EMC) values‏‎ (14:29, 4 August 2022)
  346. Average TP and TSS loading rates for three land use groups‏‎ (14:33, 4 August 2022)
  347. General MIDS Calculator result QAQC list‏‎ (14:43, 4 August 2022)
  348. Using the MIDS Calculator to generate load reduction and WLA reporting terms‏‎ (14:43, 4 August 2022)
  349. MIDS Calculator BMP summary‏‎ (14:43, 4 August 2022)
  350. MIDS Calculator land cover summary‏‎ (14:44, 4 August 2022)
  351. General WinSLAMM result QAQC list‏‎ (14:44, 4 August 2022)
  352. Using WinSLAMM to generate load reduction and WLA reporting terms‏‎ (14:44, 4 August 2022)
  353. WinSLAMM control practice summary‏‎ (14:44, 4 August 2022)
  354. General P8 result QAQC list‏‎ (14:46, 4 August 2022)
  355. Using P8 to calculate load reduction and WLA reporting terms‏‎ (14:46, 4 August 2022)
  356. P8 mass balance terms‏‎ (14:46, 4 August 2022)
  357. Recommend filtration efficiency for P8‏‎ (14:46, 4 August 2022)
  358. TMDL model description and overview‏‎ (14:54, 4 August 2022)
  359. TMDL model comparison matrix‏‎ (14:55, 4 August 2022)
  360. TSS and TP EMC literature values for TMDL modeling‏‎ (15:04, 4 August 2022)
  361. Land use event mean concentrations (emcs) for the MPCA Simple Estimator‏‎ (15:05, 4 August 2022)
  362. Typical BMP TSS and TP removal rates from Minnesota Stormwater Manual‏‎ (15:08, 4 August 2022)
  363. Anti-icing application rates‏‎ (15:12, 4 August 2022)
  364. Anti-icing data form‏‎ (15:13, 4 August 2022)
  365. Average chloride concentrations in groundwater based on land use‏‎ (15:13, 4 August 2022)
  366. Calculate application rate‏‎ (15:13, 4 August 2022)
  367. Dakota County plow driver survey‏‎ (15:13, 4 August 2022)
  368. Examples of Implementation Strategies for Winter Maintenance Leadership‏‎ (15:13, 4 August 2022)
  369. Examples of Municipal and Private Cost Savings‏‎ (15:14, 4 August 2022)
  370. High Risk Lakes in the TCMA‏‎ (15:14, 4 August 2022)
  371. High Risk Streams in the TCMA‏‎ (15:21, 4 August 2022)
  372. Impaired Lake and Wetland Characterization in the TCMA‏‎ (15:22, 4 August 2022)
  373. Impaired Lakes, Wetlands and Streams by MS4‏‎ (15:26, 4 August 2022)
  374. Impaired Lakes, Wetlands and Streams by WD & WMO‏‎ (15:27, 4 August 2022)
  375. Impaired Stream Characterization in the TCMA‏‎ (15:27, 4 August 2022)
  376. Lakes and wetlands impaired by chloride in the TCMA‏‎ (15:28, 4 August 2022)
  377. Long-term chloride trends in lakes in the TCMA‏‎ (15:29, 4 August 2022)
  378. NPDES Source Permits by Stream‏‎ (15:29, 4 August 2022)
  379. Number of days with lake and wetland samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (15:30, 4 August 2022)
  380. Number of days with stream samples exceeding the chronic and acute criterion in the TCMA, 2003-2013‏‎ (15:31, 4 August 2022)
  381. Performance-Based Chloride Reduction Strategies‏‎ (15:34, 4 August 2022)
  382. Pounds of ice melted per pound of salt‏‎ (15:34, 4 August 2022)
  383. Results of Regression Analyses for Average Winter Chloride Concentrations (2004-2013)‏‎ (15:35, 4 August 2022)
  384. Speed of melting‏‎ (15:35, 4 August 2022)
  385. Streams impaired by chloride in the TCMA‏‎ (15:36, 4 August 2022)
  386. Summary of TMDL (lbs/day) and Components for Impaired Streams in the TCMA‏‎ (15:37, 4 August 2022)
  387. Summary of TMDL and Components for Impaired Lakes and Wetlands in the TCMA‏‎ (15:37, 4 August 2022)
  388. Summary of TMDL and Components for Impaired Streams in the TCMA‏‎ (15:37, 4 August 2022)
  389. TCMA Overall Cost Considerations‏‎ (15:37, 4 August 2022)
  390. Twin Cities Campus – Winter Maintenance Improvements‏‎ (15:37, 4 August 2022)
  391. Step 2 Calibration Chart for auger or conveyor systems‏‎ (15:45, 4 August 2022)
  392. Step 4 Calibration Chart for auger or conveyor systems‏‎ (15:46, 4 August 2022)
  393. Step 3 Calibration Chart for auger or conveyor systems‏‎ (15:46, 4 August 2022)
  394. Application rates for deicing‏‎ (15:47, 4 August 2022)
  395. Calibration Chart for auger or conveyor systems‏‎ (15:47, 4 August 2022)
  396. Calibration chart for augured or conveyed manual controlled spreaders‏‎ (15:48, 4 August 2022)
  397. Calibration chart for gravity flow equipment‏‎ (15:48, 4 August 2022)
  398. Documentation form for deicing‏‎ (15:49, 4 August 2022)
  399. Lbs per 1000 sq ft to lps per lane mile conversion‏‎ (15:49, 4 August 2022)
  400. Lbs per lane mile to lbs per 1000 sq ft conversion‏‎ (15:49, 4 August 2022)
  401. Lowest practical melting temperature‏‎ (15:49, 4 August 2022)
  402. Salt - Sand yard to ton conversions‏‎ (15:50, 4 August 2022)
  403. Table summarizing of properties of deicing agents‏‎ (15:50, 4 August 2022)
  404. Typical winter decommission and maintenance tasks‏‎ (15:51, 4 August 2022)
  405. Settling chamber surface area‏‎ (16:21, 4 August 2022)
  406. Relative pollutant reduction for sand filters‏‎ (16:22, 4 August 2022)
  407. Recommended maintenance activities for media filters‏‎ (16:22, 4 August 2022)
  408. Pollutant removal percentages for filtration BMPs‏‎ (16:22, 4 August 2022)
  409. Pollutant concentrations and removals for iron enhanced filters‏‎ (16:25, 4 August 2022)
  410. Total P and particulate P removal from BMPs without iron in the filter media‏‎ (16:29, 4 August 2022)
  411. Check dam materials specifications‏‎ (16:47, 4 August 2022)
  412. Cost components for filtration practices‏‎ (16:47, 4 August 2022)
  413. Dry swale materials specifications‏‎ (16:48, 4 August 2022)
  414. Open vegetated swale and filter strip materials specifications‏‎ (16:48, 4 August 2022)
  415. Open vegetated swale materials specifications‏‎ (16:49, 4 August 2022)
  416. Sand material specifications‏‎ (16:49, 4 August 2022)
  417. Stormwater step pool materials specifications‏‎ (16:49, 4 August 2022)
  418. Summary of quantities - stormwater step pool case study‏‎ (16:50, 4 August 2022)
  419. Dry swale construction inspection checklist‏‎ (17:10, 4 August 2022)
  420. Dry swale operation and maintenance checklist‏‎ (17:11, 4 August 2022)
  421. Stormwater step pool construction inspection checklist‏‎ (17:14, 4 August 2022)
  422. Stormwater step pool operation and maintenance checklist‏‎ (17:15, 4 August 2022)
  423. Wet swale construction inspection checklist‏‎ (17:17, 4 August 2022)
  424. Wet swale operation and maintenance checklist‏‎ (17:18, 4 August 2022)
  425. Wet swale materials specifications‏‎ (17:18, 4 August 2022)
  426. Wet swale - Recommended Short Term (3-Year) Maintenance Schedule for Carpenter Creek project‏‎ (17:18, 4 August 2022)
  427. Typical maintenance problems and activities for wet swales‏‎ (17:18, 4 August 2022)
  428. Typical maintenance problems and activities for stormwater step pools‏‎ (17:18, 4 August 2022)
  429. Typical maintenance problems and activities for dry swales‏‎ (17:18, 4 August 2022)
  430. Summary of costs for dry swale case study - International Plaza Drive Improvements‏‎ (17:19, 4 August 2022)
  431. Bioretention - construction inspection checklist‏‎ (17:21, 4 August 2022)
  432. Check dam inspection checklist‏‎ (17:22, 4 August 2022)
  433. Conservation of natural areas checklist‏‎ (17:23, 4 August 2022)
  434. Bioretention - operation and maintenance checklist‏‎ (17:25, 4 August 2022)
  435. Check dam maintenance checklist‏‎ (17:26, 4 August 2022)
  436. Green roof maintenance inspection checklist‏‎ (17:27, 4 August 2022)
  437. Infiltration basin - system construction inspection checklist‏‎ (17:29, 4 August 2022)
  438. Infiltration Trench - Construction inspection checklist‏‎ (17:30, 4 August 2022)
  439. Infiltration trench/basin – operation and maintenance checklist‏‎ (17:31, 4 August 2022)
  440. Residential streets and parking lot checklist‏‎ (17:35, 4 August 2022)
  441. Stormwater pond/wetland – operation and maintenance checklist‏‎ (17:36, 4 August 2022)
  442. Vegetative filter system - construction inspection checklist‏‎ (17:36, 4 August 2022)
  443. Vegetative filter system - operation and maintenance checklist‏‎ (17:37, 4 August 2022)
  444. Lot development checklist‏‎ (17:37, 4 August 2022)
  445. Example Infiltration Requirements in the Twin Cities Metro Area (2009)‏‎ (17:47, 4 August 2022)
  446. Minimum setback requirements‏‎ (17:48, 4 August 2022)
  447. Recommended contributing drainage area for infiltration BMPs‏‎ (17:48, 4 August 2022)
  448. Stormwater infiltration BMPs - contributing drainage area‏‎ (17:48, 4 August 2022)
  449. Stormwater infiltration BMPs - overview‏‎ (17:48, 4 August 2022)
  450. Stormwater infiltration BMPs - treatment properties‏‎ (17:48, 4 August 2022)
  451. Stormwater infiltration BMPs – selection considerations‏‎ (17:48, 4 August 2022)
  452. Summary of Drilling Methods to Collect Soil Samples for Infiltration Basins‏‎ (17:49, 4 August 2022)
  453. Summary of infiltration practices for given drainage areas‏‎ (17:49, 4 August 2022)
  454. Infiltration Summary Table‏‎ (18:18, 4 August 2022)
  455. Construction Stormwater Permit Notice of Termination and Site Closeout Checklist‏‎ (19:05, 4 August 2022)
  456. Construction Stormwater Permit timelines‏‎ (19:06, 4 August 2022)
  457. Construction requirements: Compost blanket application‏‎ (19:07, 4 August 2022)
  458. Construction requirements: Compost filter berm‏‎ (19:08, 4 August 2022)
  459. Construction requirements for compost filter sock‏‎ (19:08, 4 August 2022)
  460. Construction requirements for compost blanket application‏‎ (19:08, 4 August 2022)
  461. Pretreatment practice summary of characteristics‏‎ (19:19, 4 August 2022)
  462. Pretreatment practice compatibility with downstream structural stormwater BMPs‏‎ (19:20, 4 August 2022)
  463. Pretreatment practice applicability‏‎ (19:20, 4 August 2022)
  464. Pretreatment pollutant removal characteristics - all devices‏‎ (19:28, 4 August 2022)
  465. Processes utilized by Best Management Practices - Constructed Basins‏‎ (19:34, 4 August 2022)
  466. Stormwater reuse project data‏‎ (19:38, 4 August 2022)
  467. Stormwater reuse project data contact information‏‎ (19:39, 4 August 2022)
  468. BMP design considerations for ground water aquifer protection‏‎ (20:03, 4 August 2022)
  469. BMP appropriateness for different receiving waters‏‎ (20:03, 4 August 2022)
  470. BMP options sheet for highway and road runoff management‏‎ (20:03, 4 August 2022)
  471. BMP selection based on physical feasibility‏‎ (20:03, 4 August 2022)
  472. BMP selection based on community and environmental factors‏‎ (20:04, 4 August 2022)
  473. BMP suitability for different stormwater strategies‏‎ (20:04, 4 August 2022)
  474. BMP use in settings with shallow soils and shallow depth to bedrock‏‎ (20:04, 4 August 2022)
  475. BMP use in soil with low infiltration capacity‏‎ (20:04, 4 August 2022)
  476. Best management practices matrix‏‎ (20:04, 4 August 2022)
  477. Comparative BMP phosphorus removal‏‎ (20:07, 4 August 2022)
  478. Comparison of Bathymetric Survey Methods‏‎ (20:09, 4 August 2022)
  479. Comparison of Four Levels of Assessment‏‎ (20:11, 4 August 2022)
  480. Concentrations of TP, OP, and DP for four mtds and Minnesota runoff‏‎ (20:14, 4 August 2022)
  481. Crediting methods summary‏‎ (20:17, 4 August 2022)
  482. Pollutant Removal Efficiencies from Street Sweeping for Total Solids Total Phosphorus and Total Nirogen‏‎ (20:25, 4 August 2022)
  483. Pollutants associated with nonpoint sources‏‎ (20:27, 4 August 2022)
  484. Pollutants of concern from operations‏‎ (20:29, 4 August 2022)
  485. Potential evapotranspiration for Minneapolis-St. Paul from 2001-2010‏‎ (20:31, 4 August 2022)
  486. Potential sources of bacteria and actions to address‏‎ (20:33, 4 August 2022)
  487. Potential sources of organic matter and carbon and BMPs/Activities that could be included in your compliance schedule to address dissolved oxygen/oxygen demand applicable WLAs‏‎ (20:33, 4 August 2022)
  488. Summary of stormwater credits function‏‎ (20:38, 4 August 2022)
  489. Infiltration media and material specifications‏‎ (20:46, 4 August 2022)
  490. MPCA Simple Estimator: Rv, TSS EMC, and TP EMC Values for Land Use Types‏‎ (20:48, 4 August 2022)
  491. Runoff coefficients for different soil groups and slopes‏‎ (20:50, 4 August 2022)
  492. Soils with low P-Index‏‎ (20:51, 4 August 2022)
  493. Water supply fixture units (WSFU) for typical non-potable applications‏‎ (20:55, 4 August 2022)
  494. WinSLAMM land use and source area types‏‎ (20:56, 4 August 2022)
  495. Industrial prevention practices for bacteria‏‎ (20:59, 4 August 2022)
  496. Common problems and how to troubleshoot them for bioretention and infiltration practices‏‎ (00:20, 5 August 2022)
  497. Common problems and how to troubleshoot them for green roofs‏‎ (00:22, 5 August 2022)
  498. Common problems and how to troubleshoot them for tree trenches and tree boxes‏‎ (00:23, 5 August 2022)
  499. Example O&M plans, checklists, reports, and maintenance agreements for green roofs‏‎ (00:23, 5 August 2022)
  500. Example O&M Plans, Checklists, Reports, and Maintenance Agreements for tree trenches and tree boxes‏‎ (00:23, 5 August 2022)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)