| Project: | ||
| Location: | ||
| Site Status: | ||
| Date: | ||
| Time: | ||
| Inspector: | ||
| Satisfactory /Unsatisfactory | Comments | |
| 1. Pre-construction | ||
| Pre-construction meeting | ||
| Runoff diverted (Note type of bypass) | ||
| Facility area cleared | ||
| Soil tested for permeability | ||
| Soil tested for phosphorus content (include test method) | ||
| Verify site was not overdug | ||
| Project benchmark near site | ||
| Facility location staked out | ||
| Temporary erosion and sediment protection properly installed | ||
| 2. Excavation | ||
| Lateral slopes completely level | ||
| Soils not compacted during excavation | ||
| Longitudinal slopes within design range | ||
| Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
| Verify stockpile is not causing compaction and that it is not eroding | ||
| Was underlying soil ripped or loosened | ||
| 3. Structural Components | ||
| Stone diaphragm installed per plans | ||
| Outlets installed pre plans | ||
| Underdrain installed to grade | ||
| Pretreatment devices installed per plans | ||
| Soil bed composition and texture conforms to specifications | ||
| 4. Vegetation | ||
| Complies with planting specs | ||
| Topsoil complies with specs in composition and placement | ||
| Soil properly stabilized for permanent erosion control | ||
| 5. Final Inspection | ||
| Dimensions per plans | ||
| Pre-treatment operational | ||
| Inlet/outlet operational | ||
| Soil/ filter bed permeability verified | ||
| Effective stand of vegetation stabilized | ||
| Construction generated sediments removed | ||
| Contributing watershed stabilized before flow is diverted to the practice | ||
| Comments: | ||
| Actions to be taken: | ||