This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
15:36, 28 August 2019 | TMDL reaches in the South Metro Mississippi River TSS TMDL.png (file) | 408 KB | 1 | ||
16:16, 28 August 2019 | Job control inputs for wet pond example.png (file) | 230 KB | 1 | ||
16:51, 28 August 2019 | Site information for wet pond example.png (file) | 190 KB | 1 | ||
17:41, 28 August 2019 | Watershed and BMP inputs for wet pond example.png (file) | 413 KB | 1 | ||
17:46, 28 August 2019 | TSS reduction results for Wet pond example.png (file) | 241 KB | 1 | ||
21:07, 28 August 2019 | WinSLAMM pollutant selection window.png (file) | 74 KB | 1 | ||
21:08, 28 August 2019 | Example of applying standard land uses in WinSLAMM.png (file) | 217 KB | 1 | ||
13:37, 29 August 2019 | Control practices applied to source areas (left) and the drainage system (right).png (file) | 240 KB | 1 | ||
13:54, 29 August 2019 | Example of inputs required for the porous pavement control practice.png (file) | 91 KB | 1 | ||
13:57, 29 August 2019 | Example of WinSLAMM output tab.png (file) | 170 KB | 1 |