m |
|||
Line 2: | Line 2: | ||
===Updates to the bioretention section=== | ===Updates to the bioretention section=== | ||
− | ( | + | (February-March, 2014). Work on this section has been on-going for several months. See [[What's new]] for recent updates to the Manual. Future updates include the following: |
− | |||
:*guidance and recommendations for determining soil infiltration rates within infiltration and bioretention BMPs; | :*guidance and recommendations for determining soil infiltration rates within infiltration and bioretention BMPs; | ||
:*refinement of existing stormwater pretreatment requirements or guidelines for each bioretention and infiltration BMP type; | :*refinement of existing stormwater pretreatment requirements or guidelines for each bioretention and infiltration BMP type; | ||
:*guidance and recommendations on the use of soil ripping to increase infiltration capacity of infiltration and bioretention BMPs; | :*guidance and recommendations on the use of soil ripping to increase infiltration capacity of infiltration and bioretention BMPs; | ||
− | |||
:*updated design specifications for bioretention and infiltration BMPs; | :*updated design specifications for bioretention and infiltration BMPs; | ||
:*new information on construction methods, construction techniques, and maintenance of infiltration and bioretention BMPs; and | :*new information on construction methods, construction techniques, and maintenance of infiltration and bioretention BMPs; and | ||
Line 13: | Line 11: | ||
===Creation of a section on trees (urban forestry)=== | ===Creation of a section on trees (urban forestry)=== | ||
− | ( | + | (February-March, 2014). Work on this section (see [[Trees]]) has been on-going for the past few months. Several pages have already been added, but the following information will be added in the near future: |
− | + | :*design specifications for tree quality and tree planting; | |
− | : | ||
− | :*design specifications for tree quality | ||
:*construction design specifications for tree stormwater BMPs; | :*construction design specifications for tree stormwater BMPs; | ||
:*guidelines for construction activities adjacent to existing trees; | :*guidelines for construction activities adjacent to existing trees; | ||
:*maintenance guidelines for trees; | :*maintenance guidelines for trees; | ||
− | :*monitoring guidelines for tree BMPs; | + | :*monitoring guidelines for tree BMPs; and |
− | |||
:*a fact sheet summarizing the applicability of urban forestry to stormwater management and use of trees as urban stormwater BMP; | :*a fact sheet summarizing the applicability of urban forestry to stormwater management and use of trees as urban stormwater BMP; | ||
− | |||
− | |||
− | |||
− | |||
===Updates to information on infiltration and infiltration constraints=== | ===Updates to information on infiltration and infiltration constraints=== | ||
(Spring/Summer, 2014) New information is being added and existing information updated on topics related to infiltration of stormwater. Updates and new information include: | (Spring/Summer, 2014) New information is being added and existing information updated on topics related to infiltration of stormwater. Updates and new information include: |
We will be populating this site with information on future updates to the Manual. We anticipate having this page up-to-date by mid-August. Timelines shown below are approximate.
(February-March, 2014). Work on this section has been on-going for several months. See What's new for recent updates to the Manual. Future updates include the following:
(February-March, 2014). Work on this section (see Trees) has been on-going for the past few months. Several pages have already been added, but the following information will be added in the near future:
(Spring/Summer, 2014) New information is being added and existing information updated on topics related to infiltration of stormwater. Updates and new information include: