m |
m |
||
Line 93: | Line 93: | ||
**Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | **Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
**Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
+ | **If no, go to Box 60 | ||
*[[MIDS design sequence flow chart - Box 55]] - Do the following conditions apply? | *[[MIDS design sequence flow chart - Box 55]] - Do the following conditions apply? | ||
**There are existing or proposed structures or infrastructure that make FTO 2 not feasible; and | **There are existing or proposed structures or infrastructure that make FTO 2 not feasible; and |