*[[MIDS design sequence flow chart - Box 7]] - Are there restraints due to lack of available right-of-way, off-site drainage and/or rate control requirements? | *[[MIDS design sequence flow chart - Box 7]] - Are there restraints due to lack of available right-of-way, off-site drainage and/or rate control requirements? | ||
*[[MIDS design sequence flow chart - Box 8]] - Is Flexible Treatment Option (FTO) 2 feasible? | *[[MIDS design sequence flow chart - Box 8]] - Is Flexible Treatment Option (FTO) 2 feasible? | ||
− | *[[MIDS design sequence flow chart - Box 9]] - | + | *[[MIDS design sequence flow chart - Box 9]] - Select Flexible Treatment Option (FTO) 2 |
+ | **Provide documentation of offsite runon to project area | ||
+ | **Provide documentation of lack of right-of-way | ||
*[[MIDS design sequence flow chart - Box 10]] - Select FTO #3. Provide site survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal of FTO alternatives is not feasible in addition to other documentation as required by LGU. | *[[MIDS design sequence flow chart - Box 10]] - Select FTO #3. Provide site survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal of FTO alternatives is not feasible in addition to other documentation as required by LGU. | ||
*[[MIDS design sequence flow chart - Box 11]] - Are there zoning and land use requirements that make the Performance Goal not feasible? | *[[MIDS design sequence flow chart - Box 11]] - Are there zoning and land use requirements that make the Performance Goal not feasible? | ||
Line 101: | Line 103: | ||
**Explore non-infiltration volume reduction practices | **Explore non-infiltration volume reduction practices | ||
**Provide DWSMA or well location map | **Provide DWSMA or well location map | ||
− | *[[MIDS design sequence flow chart - Box 57]] | + | *[[MIDS design sequence flow chart - Box 57]] |
− | |||
− | |||
*[[MIDS design sequence flow chart - Box 58]] - Is Flexible Treatment Option (FTO) 2 feasible? | *[[MIDS design sequence flow chart - Box 58]] - Is Flexible Treatment Option (FTO) 2 feasible? | ||
*[[MIDS design sequence flow chart - Box 59]] - Do the following conditions apply? | *[[MIDS design sequence flow chart - Box 59]] - Do the following conditions apply? |