m |
m |
||
Line 129: | Line 129: | ||
**Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | **Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
**If no, go to Box 49 | **If no, go to Box 49 | ||
+ | *[[MIDS design sequence flow chart - Box 63]] | ||
+ | **There are adverse hydrologic impacts from infiltration practices; and | ||
+ | **The BMP cannot be relocated to avoid adverse hydrologic impacts |