m |
m |
||
Line 20: | Line 20: | ||
*[[MIDS design sequence flow chart - Box 14]] - Is Flexible Treatment Option (FTO) 2 feasible? | *[[MIDS design sequence flow chart - Box 14]] - Is Flexible Treatment Option (FTO) 2 feasible? | ||
*[[MIDS design sequence flow chart - Box 15]] - Is the site located in a DWSMA, wellhead protection area or within 200 feet of a drinking water well? | *[[MIDS design sequence flow chart - Box 15]] - Is the site located in a DWSMA, wellhead protection area or within 200 feet of a drinking water well? | ||
− | *[[MIDS design sequence flow chart - Box 16]] - | + | *[[MIDS design sequence flow chart - Box 16]] - Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? |
*[[MIDS design sequence flow chart - Box 17]] - Are there existing or proposed structures or infrastructure that make the performance goal not feasible? | *[[MIDS design sequence flow chart - Box 17]] - Are there existing or proposed structures or infrastructure that make the performance goal not feasible? | ||
*[[MIDS design sequence flow chart - Box 18]] - Is BMP relocation feasible? | *[[MIDS design sequence flow chart - Box 18]] - Is BMP relocation feasible? |