Line 113: Line 113:
 
**The BMP cannot be relocated to avoid adverse hydrologic impacts; and
 
**The BMP cannot be relocated to avoid adverse hydrologic impacts; and
 
**BMPs accomodating FTO 1 would avoid adverse hydrologic impacts
 
**BMPs accomodating FTO 1 would avoid adverse hydrologic impacts
*[[MIDS design sequence flow chart - Box 61]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
+
*[[MIDS design sequence flow chart - Box 61]] - Are there existing or proposed structures or infrastructure that make [[Flexible treatment options#Flexible Treatment Option 1 (FTO #1)|Flexible Treatment Option 1]] not feasible?
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU
 
**Karst is present within 1000 feet of the site and the BMP cannot be reloacted so that it is more than 1000 feet from karst
 
**Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater
 
**Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated
 
**Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)
 
**Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour
 
**If no, go to box 57
 
 
*[[MIDS design sequence flow chart - Box 62]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
 
*[[MIDS design sequence flow chart - Box 62]] Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
 
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU
 
**The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU