(Created page with "{{alert|Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014|alert-under-construction}}")
 
m
Line 1: Line 1:
 
{{alert|Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014|alert-under-construction}}
 
{{alert|Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014|alert-under-construction}}
 +
 +
The following is a quick guide to complete the [[Guidance for completing the TMDL reporting form#BMPs-activities completed worksheet|BMPasdfkjasd]].
 +
 +
==Gathering BMP information==
 +
STEP 1: Inventory BMPs that
 +
* are treating discharge draining to a TMDL indicated in your form
 +
* reduce pollutants prior to discharge from your MS4
 +
* you described in your Compliance Schedule on your TMDL Attachment Spreadsheet at the time of application
 +
* have been operational since the baseline year of that TMDL
 +
* meet criteria for category 1 or category 2 BMP types
 +
 +
STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area
 +
STEP 3: Plot the location of inventoried BMPs for which you have geographic locations
 +
STEP 4: Determine from which TMDL the BMPs reduce pollutants
 +
 +
==Enter BMP information into the spreadsheet==
 +
Example data shown for a rain garden in City A, for more details see [[Examples for completing the TMDL reporting form|examples]].
 +
 +
STEP 5: Enter the reporting year by using the drop down menu in column D. Columns A through C autofill.
 +
 +
[[file:City_a_activities1.PNG|thumb|left|alt=name of file|Step 5]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click [[Guidance for completing the TMDL reporting form#Columns Q and beyond – TMDL Project with TMDL WLAs|here]].

Revision as of 17:40, 22 January 2015

This site is currently undergoing revision. For more information, open this link.
Information for this page has not been developed. It is anticipated this page will be populated in winter of 2014

The following is a quick guide to complete the BMPasdfkjasd.

Gathering BMP information

STEP 1: Inventory BMPs that

  • are treating discharge draining to a TMDL indicated in your form
  • reduce pollutants prior to discharge from your MS4
  • you described in your Compliance Schedule on your TMDL Attachment Spreadsheet at the time of application
  • have been operational since the baseline year of that TMDL
  • meet criteria for category 1 or category 2 BMP types

STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area STEP 3: Plot the location of inventoried BMPs for which you have geographic locations STEP 4: Determine from which TMDL the BMPs reduce pollutants

Enter BMP information into the spreadsheet

Example data shown for a rain garden in City A, for more details see examples.

STEP 5: Enter the reporting year by using the drop down menu in column D. Columns A through C autofill.

name of file
Step 5







STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click here.