m |
|||
Line 255: | Line 255: | ||
*stormwater treatment train - a suite of stormwater management practices incorporating aspects of pollution prevention, volume control and water quality controls | *stormwater treatment train - a suite of stormwater management practices incorporating aspects of pollution prevention, volume control and water quality controls | ||
*streambank stabilization - activities or techniques employed to maintain the integrity or stop the degradation of streambanks due to erosion and sedimentation | *streambank stabilization - activities or techniques employed to maintain the integrity or stop the degradation of streambanks due to erosion and sedimentation | ||
+ | *structural stormwater BMP - is defined in the MS4 General permit as "a stationary and permanent BMP that is designed, constructed and operated to prevent or reduce the discharge of pollutants in stormwater". For the purposes of the TMDL Annual Reporting form, a structural BMP refers specifically to a constructed basin, filter, infiltrator, swale or strip. | ||
*sublimation - the process of transforming from a solid directly into a gas without passing through a liquid phase | *sublimation - the process of transforming from a solid directly into a gas without passing through a liquid phase | ||
*subwatershed - a subdivision based on hydrology corresponding to a smaller drainage area within a larger watershed | *subwatershed - a subdivision based on hydrology corresponding to a smaller drainage area within a larger watershed |