m
m
Line 1: Line 1:
Creating a page to describe credits for constructed stormwater pond BMPs is part of an on-going contract. We anticipate having this page in spring, 2015. For now, information on volume and pollutant removal for constructed stormwater pond BMPs can be found on the following pages.
+
{{alert|This site is under construction. Anticipated completion date is March, 2015.|alert-under-construction}}
*[[Information on pollutant removal by BMPs]]
+
 
*[http://stormwater.pca.state.mn.us/index.php/Category:Table_-_pollutant_information Tables on pollutant removal]
+
{{alert|This site is under construction. Anticipated completion date is March, 2015.|alert-under-construction}}
*[[Requirements, recommendations and information for using stormwater pond as a BMP in the MIDS calculator]]
+
 
 +
[http://stormwater.pca.state.mn.us/index.php/Overview_of_stormwater_credits Credit] refers to the quantity of stormwater or pollutant reduction achieved either by an individual BMP or cumulatively with multiple BMPs. Stormwater credits are a tool for local stormwater authorities who are interested in
 +
*providing incentives to site developers to encourage the [[Credits for Better Site design|preservation of natural areas and the reduction of the volume of stormwater]] runoff being conveyed to a best management practice (BMP);
 +
*complying with permit requirements, including antidegradation (see [http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit]; [http://stormwater.pca.state.mn.us/index.php/MS4_General_Permit]);
 +
*meeting the [http://stormwater.pca.state.mn.us/index.php/Performance_goals_for_new_development,_re-development_and_linear_projects MIDS performance goal]; or
 +
*meeting or complying with water quality objectives, including [[Total Maximum Daily Loads (TMDLs)|Total Maximum Daily Load]] (TMDL) Wasteload Allocations (WLAs).
 +
This page provides a discussion of how biofiltration practices can achieve stormwater credits.

Revision as of 20:44, 18 February 2015

This site is currently undergoing revision. For more information, open this link.
This site is under construction. Anticipated completion date is March, 2015.
This site is currently undergoing revision. For more information, open this link.
This site is under construction. Anticipated completion date is March, 2015.

Credit refers to the quantity of stormwater or pollutant reduction achieved either by an individual BMP or cumulatively with multiple BMPs. Stormwater credits are a tool for local stormwater authorities who are interested in

This page provides a discussion of how biofiltration practices can achieve stormwater credits.