m |
m |
||
Line 11: | Line 11: | ||
*The MIDS calculator does not require sizing criteria for BMPs that do not achieve volume reductions (ponds, wetlands, sand filters). The pollutant removal credit in the calculator assumes these BMPs are properly sized per recommendations in this Manual. | *The MIDS calculator does not require sizing criteria for BMPs that do not achieve volume reductions (ponds, wetlands, sand filters). The pollutant removal credit in the calculator assumes these BMPs are properly sized per recommendations in this Manual. | ||
− | We welcome comments and suggestions on the calculator. Please send comments to Anne Gelbmann at anne.gelbmann@state.mn.us. We will compile comments and, if resources allow, incorporate suggestions into future versions of the calculator. | + | We welcome comments and suggestions on the calculator. Please send comments to [mailto:anne.gelbmann@state.mn.us Anne Gelbmann] at anne.gelbmann@state.mn.us. We will compile comments and, if resources allow, incorporate suggestions into future versions of the calculator. |
We welcome comments and suggestions on the calculator. Please send comments to Anne Gelbmann at anne.gelbmann@state.mn.us. We will compile comments and, if resources allow, incorporate suggestions into future versions of the calculator.
NOTE: To download the calculator, click on the link below and open this folder MIDSCalculatorGUIInstallerJuly8.zip
Download just the Excel version of the calculator: File:MIDS calculator Excel only.xls