m
m
Line 7: Line 7:
 
<th>Design rainfall event</th>
 
<th>Design rainfall event</th>
 
<th>Pre-development</th>
 
<th>Pre-development</th>
<th>1-yr 24-hr "Kerplunk" (K124)</th>
+
<th>1-yr 24-hr Instantaneous volume</th>
 
<th>1-yr 24-hr routed (R124)</th>
 
<th>1-yr 24-hr routed (R124)</th>
<th>Development 2-yr 24-hr peak "Kerplunk" (K224)</th>
+
<th>Development 2-yr 24-hr peak Instantaneous volume</th>
 
<th>Development 2-yr 24-hr peak routed (R224)</th>
 
<th>Development 2-yr 24-hr peak routed (R224)</th>
 
</tr>
 
</tr>

Revision as of 13:12, 1 May 2015

Peak discharge (cfs) during a wet year (2002)
Link to this table

Design rainfall event Pre-development 1-yr 24-hr Instantaneous volume 1-yr 24-hr routed (R124) Development 2-yr 24-hr peak Instantaneous volume Development 2-yr 24-hr peak routed (R224)
2002 14.4 6.72 19.8 6.5 16.3