m
m
Line 1: Line 1:
<font size=3>'''Summary of specifications for materials under the pavement surface.'''</font size><br>
+
<font size=3>'''Summary of specifications for materials under the pavement surface.<sup>1</sup>'''</font size><br>
 
Link to this [[Specifications for materials under permeable pavement surface|table]]
 
Link to this [[Specifications for materials under permeable pavement surface|table]]
  
Line 46: Line 46:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
<font size=1><sup>1</sup>for additional information on materials referenced in this table (e.g. stone dimensions), see the following links:
 +
*stone size [http://laurelaggregates.com/stone-types 1], [ftp://ftp.dot.state.fl.us/lts/CO/Specifications/SpecBook/2010Book/901.pdf 2 (see Table 1)]
 +
*definitions of aggregates [ftp://ftp.dot.state.fl.us/lts/CO/Specifications/SpecBook/2010Book/901.pdf 1]
 +
*information on geotextiles [ftp://ftp.wfl.fhwa.dot.gov/geotech/Geotech%20FP-12/207,%20714%20-%20Geosynthetics/AASHTO%20M-288%20spec%20%28DAN%29.pdf 1], [http://www.tencate.com/amer/Images/TN_aashto0608_tcm29-16706.pdf 2]
 +
*liners [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management 1]</font size>
 +
 +
  
 
<noinclude>[[category:table]]</noinclude>
 
<noinclude>[[category:table]]</noinclude>

Revision as of 13:27, 7 December 2015

Summary of specifications for materials under the pavement surface.1
Link to this table

Material
Specification
Notes
Bedding/choker layer
  • Pervious concrete: None
  • Porous asphalt: 1inch of AASHTO No. 57 stone
  • PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)
Washed free of fines
Reservoir Layer
  • Pervious concrete: AASHTO No. 57 stone or per hydraulic design
  • Porous asphalt:AASHTO No. 2, 3, or 5 stone
  • PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.
Underdrain (optional) Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.
Filter Layer (optional) Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. The sand layer may require a choker layer on surface to provide transition to base layerstone.
Geotextile(optional) Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile.
Impermeable Liner Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable.
Observation Well Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).