(Created page with "===Construction stormwater – Top 5 permit violations=== #Missing or inadequate soil stabilization ##Noncompliant ###Without proper stabilization, soil is vulnerable to eros...")
(No difference)

Revision as of 22:00, 1 March 2016

Construction stormwater – Top 5 permit violations

  1. Missing or inadequate soil stabilization
    1. Noncompliant
      1. Without proper stabilization, soil is vulnerable to erosion.
    2. Compliant
      1. Mats, mulches, blankets and other BMPs temporarily stabilize and permanently establish vegetation on disturbed soils.