Line 16: Line 16:
 
<tr>
 
<tr>
 
<td>Observation well</td>
 
<td>Observation well</td>
<td colspan=6>*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
+
<td colspan=6>
 +
*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Bottom of the cap shall rest on the bottom of the infiltration practice.</td>
 
*Bottom of the cap shall rest on the bottom of the infiltration practice.</td>
<td>*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
+
<td>
 +
*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Install at downstream end of all permeable pavement systems >10,000 sf CDA.</td>
 
*Install at downstream end of all permeable pavement systems >10,000 sf CDA.</td>
<td>*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
+
<td>
 +
*Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Install one per 50 ft. of length of infiltration practice.
 
*Bottom of the cap shall rest on the tree trench bottom.</td>
 
*Bottom of the cap shall rest on the tree trench bottom.</td>

Revision as of 20:58, 29 August 2016

Infiltration media and material specifications
Link to this table

Component Infiltration basin Bioinfiltration basin Infiltration trench Underground infiltration Dry well Dry swale with check dams Permeable pavement Tree trench/box/planter
Observation well
  • Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
  • Install one per 50 ft. of length of infiltration practice.
  • Bottom of the cap shall rest on the bottom of the infiltration practice.
  • Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
  • Install one per 50 ft. of length of infiltration practice.
  • Install at downstream end of all permeable pavement systems >10,000 sf CDA.
  • Vertical 4- to 6-inch Schedule 40 PVC perforated pipe according to MNDOT Manual Section 3248 with a lockable cap and anchor plate within gravel portion of bed.
  • Install one per 50 ft. of length of infiltration practice.
  • Bottom of the cap shall rest on the tree trench bottom.