Line 13: | Line 13: | ||
**The user will be asked to save the file as a Version 3 file. | **The user will be asked to save the file as a Version 3 file. | ||
*When a user opens the calculator (either an existing file or a new file), the ''Site Information'' tab appears. In Version 3 of the calculator, the user must specify whether they are using the calculator to determine compliance with a [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. If the user answers "YES", the ''Stormwater disconnection (Impervious disconnection)'' BMP will not be available. The ''Stormwater disconnection (Impervious disconnection)'' BMP does not meet the permit requirement that "The Permittee(s) must design infiltration or filtration systems that provide a water quality volume (calculated as an instantaneous volume) of one (1) inch of runoff (or one (1) inch minus the volume of stormwater treated by another system on the site) from the new impervious surfaces created by the project." The ''Results'' tab indicates whether the calculations are for compliance with a Construction Stormwater permit. If the user selects "NO" to the question about whether the calculator is being used for permit compliance, the ''Stormwater disconnection (Impervious disconnection)'' BMP will be available. For a description of this BMP, see the next bullet. | *When a user opens the calculator (either an existing file or a new file), the ''Site Information'' tab appears. In Version 3 of the calculator, the user must specify whether they are using the calculator to determine compliance with a [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. If the user answers "YES", the ''Stormwater disconnection (Impervious disconnection)'' BMP will not be available. The ''Stormwater disconnection (Impervious disconnection)'' BMP does not meet the permit requirement that "The Permittee(s) must design infiltration or filtration systems that provide a water quality volume (calculated as an instantaneous volume) of one (1) inch of runoff (or one (1) inch minus the volume of stormwater treated by another system on the site) from the new impervious surfaces created by the project." The ''Results'' tab indicates whether the calculations are for compliance with a Construction Stormwater permit. If the user selects "NO" to the question about whether the calculator is being used for permit compliance, the ''Stormwater disconnection (Impervious disconnection)'' BMP will be available. For a description of this BMP, see the next bullet. | ||
+ | *The ''Harvest and re-use/Cistern'' BMP was modified as follows. | ||
+ | **The calculation for water use utilizes a method for determining variable irrigation demand based on potential evapotranspiration (PET) from the irrigated area, adjusted for vegetation type. Regional values for PET were developed by using data collected from the [http://agwx.soils.wisc.edu/uwex_agwx/sun_water/et_wimn University of Wisconsin Extension]. Zip codes were associated with the appropriate PET. The calculator adjusts the PET for vegetation type by asking for a plant factor (e.g. turf, vegetables, etc.) and using a corresponding crop coefficient. | ||
+ | **The user can enter a weekly irrigation rate as in Version 2, but if the user does not select a weekly rate, the irrigation amount will be calculated using irrigation demand based on PET. If the user selects a weekly rate, the daily maximum applied amount will be the smaller of the irrigation demand or weekly rate (calculated as a daily average). In making these calculations, it is ensured that water can only be applied if available in storage and that daily irrigation considers precipitation that has fallen on that day. For A soils, user-input rates of up to 2 inches per week are allowed. For D soils, a warning is flashed reminding the user that irrigation rates or timing must be considered on these slowly infiltrating soils. | ||
*A ''Stormwater disconnection (Impervious disconnection)'' BMP was created. Stormwater disconnection/Impervious surface disconnection spreads runoff generated from parking lots, driveways, rooftops, sidewalks and other impervious surfaces onto adjacent pervious areas where it can be infiltrated. All pollutants in the infiltrated water are credited as being reduced. Pollutants in the stormwater that bypasses the best management practice (BMP) receive 68 percent removal for total suspended solids (TSS) and 0 percent reduction for both dissolved and particulate phosphorus. Guidance, methodology, and an example are provided on [https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_stormwater_disconnection_%28impervious_disconnection%29_BMPs_in_the_MIDS_calculator this page]. A summary of the calculation methodology is found at [http://stormwater.pca.state.mn.us/index.php/Turf this link]. This BMP cannot be used for compliance with the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. | *A ''Stormwater disconnection (Impervious disconnection)'' BMP was created. Stormwater disconnection/Impervious surface disconnection spreads runoff generated from parking lots, driveways, rooftops, sidewalks and other impervious surfaces onto adjacent pervious areas where it can be infiltrated. All pollutants in the infiltrated water are credited as being reduced. Pollutants in the stormwater that bypasses the best management practice (BMP) receive 68 percent removal for total suspended solids (TSS) and 0 percent reduction for both dissolved and particulate phosphorus. Guidance, methodology, and an example are provided on [https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_stormwater_disconnection_%28impervious_disconnection%29_BMPs_in_the_MIDS_calculator this page]. A summary of the calculation methodology is found at [http://stormwater.pca.state.mn.us/index.php/Turf this link]. This BMP cannot be used for compliance with the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program Construction Stormwater permit]. | ||
*Infiltration is allowed beneath a raised underdrain and into underlying soil at a rate of 0.06 in/hr over the drawdown time (either 24 or 48 hours). This is in addition to the storage credit below the underdrain, which was provided in Version 2. Version 2 allowed infiltration beneath an underdrain located at the bottom of a BMP but not for a raised underdrain. It was thus possible to receive greater volume credit for a BMP with an underdrain at the bottom compared to the same BMP with a raised underdrain, which is incorrect. BMPs to which this applies include | *Infiltration is allowed beneath a raised underdrain and into underlying soil at a rate of 0.06 in/hr over the drawdown time (either 24 or 48 hours). This is in addition to the storage credit below the underdrain, which was provided in Version 2. Version 2 allowed infiltration beneath an underdrain located at the bottom of a BMP but not for a raised underdrain. It was thus possible to receive greater volume credit for a BMP with an underdrain at the bottom compared to the same BMP with a raised underdrain, which is incorrect. BMPs to which this applies include |
Version 2 of the MIDS calculator was updated in 2016. Version 3.0 includes the following changes from Version 2.