m |
m |
||
Line 1: | Line 1: | ||
'''Timelines shown below are approximate.''' We update this page infrequently. | '''Timelines shown below are approximate.''' We update this page infrequently. | ||
− | == | + | {{alert|Updated June 2, 2017|alert-info}} |
− | + | ||
+ | ==Swales== | ||
+ | Updates to the swale section of the Stormwater Manual. Click on this link to see the scope of work - [[file:Final scope of work.docx]] | ||
− | == | + | ==Construction stormwater (CSW)== |
− | + | A work order will be executed in July, 2017, to provide information on the following CSW best management practices. | |
+ | *Temporary Sediment Traps and Basins | ||
+ | *Stabilized Earth/Soil Berm, including wood chip berm | ||
+ | *Buffer Zones | ||
+ | *Lined Channels | ||
+ | *Riprap | ||
+ | *Temporary stream crossing | ||
+ | *Dewatering, including | ||
+ | **Chemical Treatment | ||
+ | **Sediment Filtration | ||
+ | The information will be used to create new pages for these BMPs. For an example of what these pages will contain, [https://stormwater.pca.state.mn.us/index.php?title=Erosion_prevention_practices_-_temporary_seeding_and_stabilization link here]. We anticipate the work being completed in winter, 2018. | ||
==Pretreatment== | ==Pretreatment== | ||
− | A | + | A work order will be executed in July, 2017, to provide the following new information on pretreatment. |
+ | *Design criteria and design considerations, construction guidelines, and maintenance recommendations for pretreatment settling practices | ||
+ | *General information and design, construction, and maintenance guidance for level spreaders | ||
+ | *Recommendations on sizing criteria for different types of pretreatment practices | ||
+ | *5 to 7 case studies summarizing the use of pretreatment practices | ||
+ | We anticipate completing the work in winter, 2018. | ||
− | == | + | ==Stormwater Program for Municipal Separate Storm Sewer Systems (MS4)== |
− | + | [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_Program_for_Municipal_Separate_Storm_Sewer_Systems_%28MS4%29 This portal page] has been redesigned to improve the organization and add information on several new topics. New pages are being added to address each of the [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_Program_for_Municipal_Separate_Storm_Sewer_Systems_%28MS4%29#MS4_Permit_Minimum_Control_Measure_.28MCM.29_overview_and_guidance Minimum Control Measures]. [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_Program_for_Municipal_Separate_Storm_Sewer_Systems_%28MS4%29#Other_technical_assistance_and_guidance Another section] will provide technical guidance and assistance. We anticipate eventually adding case studies and photo galleries similar to the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_photo_gallery construction stormwater photo galleries]. These pages will be constructed and updated throughout 2017. | |
− | == | + | ==Green infrastructure for stormwater management== |
− | The | + | We have created a portal page containing links to pages addressing [https://stormwater.pca.state.mn.us/index.php?title=Green_Infrastructure_for_stormwater_management Green Infrastructure]. The pages including the following and will be developed through the summer of 2017. |
+ | *Overview of Green Infrastructure and Low Impact Development | ||
+ | *Stormwater management, Green Infrastructure, and Low Impact Development | ||
+ | *Multiple benefits of Green Infrastructure - includes information on biodiversity, sustainable communities, living (green) streets, climate adaptation | ||
+ | *Case studies for Green Infrastructure stormwater management | ||
+ | *Links and resources for Green Infrastructure | ||
− | == | + | ==Road salt== |
− | + | We continue updating [https://stormwater.pca.state.mn.us/index.php/Road_salt,_smart_salting_and_winter_maintenance information on road salt] as time allows. |
Timelines shown below are approximate. We update this page infrequently.
Updates to the swale section of the Stormwater Manual. Click on this link to see the scope of work - File:Final scope of work.docx
A work order will be executed in July, 2017, to provide information on the following CSW best management practices.
The information will be used to create new pages for these BMPs. For an example of what these pages will contain, link here. We anticipate the work being completed in winter, 2018.
A work order will be executed in July, 2017, to provide the following new information on pretreatment.
We anticipate completing the work in winter, 2018.
This portal page has been redesigned to improve the organization and add information on several new topics. New pages are being added to address each of the Minimum Control Measures. Another section will provide technical guidance and assistance. We anticipate eventually adding case studies and photo galleries similar to the construction stormwater photo galleries. These pages will be constructed and updated throughout 2017.
We have created a portal page containing links to pages addressing Green Infrastructure. The pages including the following and will be developed through the summer of 2017.
We continue updating information on road salt as time allows.