m |
m |
||
Line 11: | Line 11: | ||
<th>TOTAL AVERAGE BID</th> | <th>TOTAL AVERAGE BID</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=5>Part 1 - General and Erosion Control</th> | <th colspan=5>Part 1 - General and Erosion Control</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>MOBILIZATION</td> | <td>MOBILIZATION</td> | ||
Line 24: | Line 21: | ||
<td>💲23,340</td> | <td>💲23,340</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL</td> | <td>SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL</td> | ||
Line 33: | Line 28: | ||
<td>💲1,335</td> | <td>💲1,335</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>TEMPORARY FENCE -- INSTALL AND REMOVAL</td> | <td>TEMPORARY FENCE -- INSTALL AND REMOVAL</td> | ||
Line 42: | Line 35: | ||
<td>💲1,280</td> | <td>💲1,280</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL</td> | <td>STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL</td> | ||
Line 51: | Line 42: | ||
<td>💲2,410</td> | <td>💲2,410</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>EROSION CONTROL BLANKET</td> | <td>EROSION CONTROL BLANKET</td> | ||
Line 60: | Line 49: | ||
<td>$1,696</td> | <td>$1,696</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL</td> | <td>STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL</td> | ||
Line 69: | Line 56: | ||
<td>💲774</td> | <td>💲774</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>DUST CONTROL</td> | <td>DUST CONTROL</td> | ||
Line 78: | Line 63: | ||
<td>💲1,210</td> | <td>💲1,210</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total Part 1 </td> | <td colspan=4>Total Part 1 </td> | ||
<td>💲32,045</td> | <td>💲32,045</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>Part 2 - Removals</th> | <th colspan=5>Part 2 - Removals</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 </td> | <td>REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 </td> | ||
Line 100: | Line 77: | ||
<td>💲1,072</td> | <td>💲1,072</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total Part 2 </td> | <td colspan=4>Total Part 2 </td> | ||
<td>💲1,072</td> | <td>💲1,072</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>Part 3 - Grading</th> | <th colspan=5>Part 3 - Grading</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE</td> | <td>COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE</td> | ||
Line 120: | Line 91: | ||
<td>$9</td> | <td>$9</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>REMOVAL OF EXCAVATED MATERIAL</td> | <td>REMOVAL OF EXCAVATED MATERIAL</td> | ||
Line 130: | Line 98: | ||
<td>$13,890</td> | <td>$13,890</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>AGGREGATE BACKFILL</td> | <td>AGGREGATE BACKFILL</td> | ||
Line 140: | Line 105: | ||
<td>$41,369</td> | <td>$41,369</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total Part 3 </td> | <td colspan=4>Total Part 3 </td> | ||
<td>💲72,854</td> | <td>💲72,854</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>Part 4 – Underground Storage Tank Components</th> | <th colspan=5>Part 4 – Underground Storage Tank Components</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>RAINWATER HARVESTING TANK (120" DIA. X 50-FEET)</td> | <td>RAINWATER HARVESTING TANK (120" DIA. X 50-FEET)</td> | ||
Line 160: | Line 119: | ||
<td>💲232,917</td> | <td>💲232,917</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>CONSTRUCT DRAINAGE STRUCTURE</td> | <td>CONSTRUCT DRAINAGE STRUCTURE</td> | ||
Line 168: | Line 126: | ||
<td>💲6,918</td> | <td>💲6,918</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) </td> | <td>CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) </td> | ||
Line 176: | Line 133: | ||
<td>💲6,510</td> | <td>💲6,510</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK)</td> | <td>CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK)</td> | ||
Line 184: | Line 140: | ||
<td>💲7,488</td> | <td>💲7,488</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>INSTALL CASTING</td> | <td>INSTALL CASTING</td> | ||
Line 192: | Line 147: | ||
<td>💲7,326</td> | <td>💲7,326</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>18" HDPE PIPE</td> | <td>18" HDPE PIPE</td> | ||
Line 200: | Line 154: | ||
<td>💲8,395</td> | <td>💲8,395</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>SOIL DENSITY COMPACTION TESTING</td> | <td>SOIL DENSITY COMPACTION TESTING</td> | ||
Line 208: | Line 161: | ||
<td>💲5,160</td> | <td>💲5,160</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total Part 4 </td> | <td colspan=4>Total Part 4 </td> | ||
<td>💲274,714</td> | <td>💲274,714</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=5>Part 5 – Site Restoration</th> | <th colspan=5>Part 5 – Site Restoration</th> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>RAPID STABILIZATION</td> | <td>RAPID STABILIZATION</td> | ||
Line 229: | Line 175: | ||
<td>💲1,333</td> | <td>💲1,333</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>PERMANENT SEEDING</td> | <td>PERMANENT SEEDING</td> | ||
Line 237: | Line 182: | ||
<td>💲2,661</td> | <td>💲2,661</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>TURF ESTABLISHMENT</td> | <td>TURF ESTABLISHMENT</td> | ||
Line 245: | Line 189: | ||
<td>💲2,500</td> | <td>💲2,500</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total Part 5 </td> | <td colspan=4>Total Part 5 </td> | ||
<td>💲6,494</td> | <td>💲6,494</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<th colspan=4>Total Bid</th> | <th colspan=4>Total Bid</th> | ||
<th>💲386,590</th> | <th>💲386,590</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>PRICE PER TANK (3 – 29,000 gallon tanks)</td> | <td colspan=4>PRICE PER TANK (3 – 29,000 gallon tanks)</td> | ||
<td>💲129,060</td> | <td>💲129,060</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td colspan=4>PRICE PER TANK PER YEAR OVER 25 YEAR</td> | <td colspan=4>PRICE PER TANK PER YEAR OVER 25 YEAR</td> | ||
<td>💲5,162</td> | <td>💲5,162</td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
− | <td colspan=4>PRICE PER GALLON</td> | + | <td colspan=4>PRICE PER GALLON (87,000 gallons)</td> |
− | <td>💲 | + | <td>💲4.44</td> |
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=4>PRICE PER GALLON PER YEAR OVER 25 YEARS</td> | <td colspan=4>PRICE PER GALLON PER YEAR OVER 25 YEARS</td> | ||
<td>💲0.06</td> | <td>💲0.06</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
− | |||
− | |||
− | |||
− | |||
[[category:Table]] | [[category:Table]] |
Contractor bid averages for installation of three 29,000 gallon underground storage tanks
Link to this table
BASE BID ITEM | ESTIMATED QUANTITY | UNIT | UNIT PRICE AVERAGE | TOTAL AVERAGE BID |
---|---|---|---|---|
Part 1 - General and Erosion Control | ||||
MOBILIZATION | 1 | LS | 💲23,340 | 💲23,340 |
SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL | 267 | LF | 💲5 | 💲1,335 |
TEMPORARY FENCE -- INSTALL AND REMOVAL | 160 | LF | 💲8 | 💲1,280 |
STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL | 1 | LS | 💲2,410 | 💲2,410 |
EROSION CONTROL BLANKET | 424 | SY | $4 | $1,696 |
STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL | 2 | EA | 💲387 | 💲774 |
DUST CONTROL | 10 | HRS | 💲121 | 💲1,210 |
Total Part 1 | 💲32,045 | |||
Part 2 - Removals | ||||
REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 | 268 | LF | 💲4 | 💲1,072 |
Total Part 2 | 💲1,072 | |||
Part 3 - Grading | ||||
COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE | 1955 | CY | $9 | $9 |
REMOVAL OF EXCAVATED MATERIAL | 1389 | CY | $10 | $13,890 |
AGGREGATE BACKFILL | 1009 | CY | $41 | $41,369 |
Total Part 3 | 💲72,854 | |||
Part 4 – Underground Storage Tank Components | ||||
RAINWATER HARVESTING TANK (120" DIA. X 50-FEET) | 3 | EA | 💲77,639 | 💲232,917 |
CONSTRUCT DRAINAGE STRUCTURE | 6 | EA | 💲1,153 | 💲6,918 |
CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) | 6 | EA | 💲1,085 | 💲6,510 |
CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK) | 6 | EA | 💲1,248 | 💲7,488 |
INSTALL CASTING | 6 | EA | 💲1,221 | 💲7,326 |
18" HDPE PIPE | 115 | LF | 💲73 | 💲8,395 |
SOIL DENSITY COMPACTION TESTING | 12 | EA | 💲430 | 💲5,160 |
Total Part 4 | 💲274,714 | |||
Part 5 – Site Restoration | ||||
RAPID STABILIZATION | 0.42 | AC | 💲3,173 | 💲1,333 |
PERMANENT SEEDING | 0.42 | AC | 💲6,336 | 💲2,661 |
TURF ESTABLISHMENT | 1 | EA | 💲2,500 | 💲2,500 |
Total Part 5 | 💲6,494 | |||
Total Bid | 💲386,590 | |||
PRICE PER TANK (3 – 29,000 gallon tanks) | 💲129,060 | |||
PRICE PER TANK PER YEAR OVER 25 YEAR | 💲5,162 | |||
PRICE PER GALLON (87,000 gallons) | 💲4.44 | |||
PRICE PER GALLON PER YEAR OVER 25 YEARS | 💲0.06 |