(Created page with " <center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br> Link to this [[Infiltration Trench - Construction inspection checklist|...") |
|||
Line 1: | Line 1: | ||
− | + | ||
<center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br> | <center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br> | ||
Link to this [[Infiltration Trench - Construction inspection checklist|table]]</center> | Link to this [[Infiltration Trench - Construction inspection checklist|table]]</center> | ||
Line 11: | Line 11: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td colspan= | + | <td colspan=3>Site Status:</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 32: | Line 32: | ||
<tr> | <tr> | ||
<td>Pre-construction meeting</td> | <td>Pre-construction meeting</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Runoff diverted</td> | <td>Runoff diverted</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Soil permeability verified</td> | <td>Soil permeability verified</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Groundwater / bedrock verified</td> | <td>Groundwater / bedrock verified</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Project benchmark established</td> | <td>Project benchmark established</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Facility location staked out</td> | <td>Facility location staked out</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Temporary erosion and sediment control established</td> | <td>Temporary erosion and sediment control established</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 73: | Line 73: | ||
<tr> | <tr> | ||
<td>Size and location per plans</td> | <td>Size and location per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Side slopes stable</td> | <td>Side slopes stable</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Depth adjusted to soil layer with specified soil type and permeability</td> | <td>Depth adjusted to soil layer with specified soil type and permeability</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | <td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | <td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
Line 103: | Line 103: | ||
<tr> | <tr> | ||
<td>Fabric per specifications</td> | <td>Fabric per specifications</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Fabric per specifications</td> | <td>Fabric per specifications</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Placed per plan location</td> | <td>Placed per plan location</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
Line 124: | Line 124: | ||
<tr> | <tr> | ||
<td>Size as specified</td> | <td>Size as specified</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Clean / washed material</td> | <td>Clean / washed material</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Placed properly</td> | <td>Placed properly</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 143: | Line 143: | ||
<tr> | <tr> | ||
<td>Pipe size per plans</td> | <td>Pipe size per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Under-drain installed per plans</td> | <td>Under-drain installed per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Inlet installed per plans</td> | <td>Inlet installed per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Pre-treatment devices installed per plans</td> | <td>Pre-treatment devices installed per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 168: | Line 168: | ||
<tr> | <tr> | ||
<td>Complies with planting specifications</td> | <td>Complies with planting specifications</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Topsoil complies with composition and placement in specifications</td> | <td>Topsoil complies with composition and placement in specifications</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Permanent erosion control measures in place</td> | <td>Permanent erosion control measures in place</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 187: | Line 187: | ||
<tr> | <tr> | ||
<td>Dimensions per plans</td> | <td>Dimensions per plans</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Check dams operational</td> | <td>Check dams operational</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Inlet / outlet operational</td> | <td>Inlet / outlet operational</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Effective stand of vegetation and stabilization</td> | <td>Effective stand of vegetation and stabilization</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Contributing watershed stabilized before flow is routed to the facility</td> | <td>Contributing watershed stabilized before flow is routed to the facility</td> | ||
− | <td> | + | <td> </td> |
− | <td> | + | <td> </td> |
</tr> | </tr> | ||
<tr> | <tr> |
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction Sequence | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Pre-Construction | ||
Pre-construction meeting | ||
Runoff diverted | ||
Soil permeability verified | ||
Groundwater / bedrock verified | ||
Project benchmark established | ||
Facility location staked out | ||
Temporary erosion and sediment control established | ||
2. Excavation | ||
Size and location per plans | ||
Side slopes stable | ||
Depth adjusted to soil layer with specified soil type and permeability | ||
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
3. Filter Fabric Placement | ||
Fabric per specifications | ||
Fabric per specifications | ||
Placed per plan location | ||
4. Aggregate Material | ||
Size as specified | ||
Clean / washed material | ||
Placed properly | ||
5. Observation Well | ||
Pipe size per plans | ||
Under-drain installed per plans | ||
Inlet installed per plans | ||
Pre-treatment devices installed per plans | ||
6. Vegetation | ||
Complies with planting specifications | ||
Topsoil complies with composition and placement in specifications | ||
Permanent erosion control measures in place | ||
7. Final Inspection | ||
Dimensions per plans | ||
Check dams operational | ||
Inlet / outlet operational | ||
Effective stand of vegetation and stabilization | ||
Contributing watershed stabilized before flow is routed to the facility | ||
Comments:
|
||
Actions to be taken:
|