Line 14: Line 14:
 
===Checklists and templates===
 
===Checklists and templates===
 
*[[File:Pond wetland operation maintenance checklist.xlsx]] - MPCA's pond and wetland operation and maintenance checklist (link to [[Stormwater pond/wetland – operation and maintenance checklist|table]])
 
*[[File:Pond wetland operation maintenance checklist.xlsx]] - MPCA's pond and wetland operation and maintenance checklist (link to [[Stormwater pond/wetland – operation and maintenance checklist|table]])
 +
*[[File:Rain_Garden_&_Bioretention_Systems_Inspection_Checklist.pdf]] - University of Minnesota's (U of M) checklist for inspecting bioretention systems, such as rain gardens
 +
*[[File:Constructed Wetlands Inspection Checklist.pdf]] - U of M's checklist for inspecting constructed wetlands
 +
*[[File:Dry Ponds Inspection Checklist.pdf]] - U of M's checklist for inspecting dry ponds
 +
*[[File:Filter Strips and Swales Inspection Checklist.pdf]] - U of M's checklist for inspecting filter strips and swales
 +
*[[File:Filtration System Inspection Checklist.pdf]] - U of M's checklist for inspecting filtration systems
 +
*[[File:Infiltration System Inspection Checklist.pdf]] - U of M's checklist for inspecting infiltration systems
 +
*[[File:Outfall Inspection Form - Rochester.pdf]] - City of Rochester's checklist for inspecting outfalls
 +
*[[File:Underground Sedimentation Inspection Checklist.pdf]] - U of M's checklist for inspecting underground sedimentation devices
 +
*[[File:Wet Ponds Inspection Checklist.pdf]] - U of M's checklist for inspecting wet ponds

Revision as of 19:19, 8 January 2018

Municipal operation inspections

The municipal separate storm sewer system (MS4) General Permit requires inspections of certain municipally owned/operated facilities, areas, or stormwater best management practices (BMPs) (MS4 General Permit Part III.D.6.e). This includes:

  • Annual inspections of structural stormwater BMPs to determine structural integrity, function, and maintenance needs.
  • At least one inspection every permit term of stormwater ponds and outfalls to determine structural integrity, function, and maintenance needs.
  • Quarterly inspections of stockpiles, and storage and material handling areas identified in the Facility Inventory to determine function and maintenance needs.

During each of these inspections, inspectors must look for evidence of illicit discharges (MS4 General Permit Part III.D.3.c.). All inspections must be documented (MS4 General Permit Part III.D.6.h.(1)).

Resources

Fact sheets and guidance documents

Checklists and templates