Line 6: | Line 6: | ||
The construction site stormwater runoff control program must include: | The construction site stormwater runoff control program must include: | ||
:*A regulatory mechanism that establishes erosion, sediment, and controls as stringent as the [https://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater permit] requirements for construction sites. | :*A regulatory mechanism that establishes erosion, sediment, and controls as stringent as the [https://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater permit] requirements for construction sites. | ||
− | :*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism | + | :*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism. |
:*Written procedures for the receipt and consideration of reports of noncomplaince at construction sites received from the public. | :*Written procedures for the receipt and consideration of reports of noncomplaince at construction sites received from the public. | ||
:*[[Construction site inspection]] procedures for inspecting public and private construction sites. The procdures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections. | :*[[Construction site inspection]] procedures for inspecting public and private construction sites. The procdures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections. |
Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.
The construction site stormwater runoff control program must include:
Click on the blue links above in the "Requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.
Construction site good housekeeping reminder - City of Red Wing's tool to remind construction site owners/operators to maintain sites in compliance with their construction site stormwater runoff control regulatory mechanism Construction site good housekeeping acknowledgement - City of Red Wing's tool to acknowledge and appreciate sites that are in compliance with their construction site stormwater runoff control regulatory mechanism