m |
|||
Line 21: | Line 21: | ||
*[https://stormwater.pca.state.mn.us/index.php?title=MS4_Staff_Site_Plan_Review_Guidance MPCA Site plan review guidance] - MPCA's guidance on what elements should be evaluated during a site plan review | *[https://stormwater.pca.state.mn.us/index.php?title=MS4_Staff_Site_Plan_Review_Guidance MPCA Site plan review guidance] - MPCA's guidance on what elements should be evaluated during a site plan review | ||
*[https://www.cwp.org/updated-code-ordinance-worksheet-improving-local-development-regulations/ Code and Ordinance Worksheet for Improving Local Development Regulations] - The Center for Watershed Protection's handbook that has over twenty model development standards for designing sites to reduce impervious surfaces, conserve open space, reduce the impacts to stormwater, and save money | *[https://www.cwp.org/updated-code-ordinance-worksheet-improving-local-development-regulations/ Code and Ordinance Worksheet for Improving Local Development Regulations] - The Center for Watershed Protection's handbook that has over twenty model development standards for designing sites to reduce impervious surfaces, conserve open space, reduce the impacts to stormwater, and save money | ||
+ | *[[media:Timelines.xlsx|Timeframes listed in the Construction Stormwater Permit]] - MPCA's document containing all of the time frame considerations that are detailed in the [[Construction stormwater permit| Construction Stormwater Permit]] | ||
===Documentation and tracking templates=== | ===Documentation and tracking templates=== |
Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.
The construction site stormwater runoff control program must include:
Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.