Line 38: | Line 38: | ||
===Checklists=== | ===Checklists=== | ||
− | Below are methods that local stormwater staff are currently using to meet the site plan review documentation [[MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)# | + | Below are methods that local stormwater staff are currently using to meet the site plan review documentation [[MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)#5. Post-Construction Stormwater Management| requirements in the MS4 General Permit for MCM 5 - Post-Construction Stormwater Management]]. |
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-47.pdf Site plan review checklist] - MPCA's site plan review checklist | *[https://www.pca.state.mn.us/sites/default/files/wq-strm2-47.pdf Site plan review checklist] - MPCA's site plan review checklist | ||
*[[media:Site Plan review checklist - Cloquet.xls| Site plan review checklist]] - City of Cloquet's site plan review checklist | *[[media:Site Plan review checklist - Cloquet.xls| Site plan review checklist]] - City of Cloquet's site plan review checklist | ||
Line 45: | Line 45: | ||
===Example Procedures=== | ===Example Procedures=== | ||
− | Example procedures are those that local stormwater staff are currently using to meet the [[MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)# | + | Example procedures are those that local stormwater staff are currently using to meet the [[MS4 PART III.STORMWATER POLLUTION PREVENTION PROGRAM (SWPPP)#5. Post-Construction Stormwater Management| MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management]]. |
*[[media:Site Plan Review Procedure - Elk River.pdf|Site plan review procedure]] - City of Elk River's site plan review procedure | *[[media:Site Plan Review Procedure - Elk River.pdf|Site plan review procedure]] - City of Elk River's site plan review procedure | ||
*[[media:Site plan review procedure - Cloquet.pdf|Site plan review procedure]] - City of Cloquet's site plan review procedure | *[[media:Site plan review procedure - Cloquet.pdf|Site plan review procedure]] - City of Cloquet's site plan review procedure | ||
*[[media:ERP Post Construction - Rice Lake.docx|ERP - post construction stormwater management]] - City of Rice Lake's enforcement response procedure for observed violations with post-construction stormwater management requirements | *[[media:ERP Post Construction - Rice Lake.docx|ERP - post construction stormwater management]] - City of Rice Lake's enforcement response procedure for observed violations with post-construction stormwater management requirements |
Paved surfaces exacerbate the negative impacts to stormwater, including increasing the stormwater discharge volume and pollutants in stormwater. Managing stormwater onsite post-construction is the more effective way to mitigate these impacts. Minimum Control Measure (MCM) 5 of the municipal seperate storm sewer system (MS4) General Permit requires permittees to have and enforce a post-construction stormwater management program that prevents or reduces stormwater pollution in new- and re- development projects.
The post-construction stormwater management program should include:
Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 5 are below.
Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 5 - Post-Construction Stormwater Management.
Fill in the blanks and adopt ordinance or long-term maintenance agreement language that meets the regulatory mechanism requirements for MCM 5 - Post-Construction Stormwater Management.
Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.
Below are methods that local stormwater staff are currently using to meet the site plan review documentation requirements in the MS4 General Permit for MCM 5 - Post-Construction Stormwater Management.
Example procedures are those that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 5 - Post-Construction Stormwater Management.