Line 15: | Line 15: | ||
*[[Section 10 Dewatering and Basin Draining]] | *[[Section 10 Dewatering and Basin Draining]] | ||
*[[Section 11 Inspections and Maintenance]] | *[[Section 11 Inspections and Maintenance]] | ||
+ | *[[Section 12 Pollution Prevention Management Measures]] | ||
*[[Section 23 Discharges to Special (Prohibited, Restricted, Other) and Impaired Waters]] | *[[Section 23 Discharges to Special (Prohibited, Restricted, Other) and Impaired Waters]] | ||
*[[Section 25 Definitions]] | *[[Section 25 Definitions]] |
This page displays the table of contents and links to Sections of the 2018 Minnesota Construction Stormwater permit.