Line 5: Line 5:
 
This page displays guidance on the table of contents and Sections of the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM  
 
This page displays guidance on the table of contents and Sections of the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM  
  
Link to the 2018 Minnesota Construction Stormwater Permit - pdf version
+
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-80a.pdf 2018 Minnesota Construction Stormwater Permit - Pdf]
  
 
==Table of Contents==
 
==Table of Contents==

Revision as of 12:02, 26 July 2018

This site is currently undergoing revision. For more information, open this link.
This section of the manual is being developed
Warning: This page and the Sections below are considered a guidance document to the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM and is not considered the official permit. A copy of the official permit, coverage letter and coverage card will be emailed once the permit application has been completed and submitted to the MPCA.

This page displays guidance on the table of contents and Sections of the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM

Table of Contents