m
Line 5: Line 5:
 
==MS4 General Permit requirements for MCM 4==
 
==MS4 General Permit requirements for MCM 4==
 
The construction site stormwater runoff control program must include:
 
The construction site stormwater runoff control program must include:
:*A regulatory mechanism that establishes erosion, sediment, and waste controls as stringent as the [https://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Construction Stormwater permit] requirements for construction sites.  
+
:*A regulatory mechanism that establishes erosion, sediment, and waste controls as stringent as the [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction Stormwater permit] requirements for construction sites.  
 
:*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism.  
 
:*A [[site plan review procedure]] for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism.  
 
:*Written [[#Example Procedures|procedures]] for the receipt and consideration of reports of noncomplaince at construction sites received from the public.
 
:*Written [[#Example Procedures|procedures]] for the receipt and consideration of reports of noncomplaince at construction sites received from the public.

Revision as of 00:34, 31 August 2018

Construction site adjacent to water body

Introduction

Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.

MS4 General Permit requirements for MCM 4

The construction site stormwater runoff control program must include:

  • A regulatory mechanism that establishes erosion, sediment, and waste controls as stringent as the Construction Stormwater permit requirements for construction sites.
  • A site plan review procedure for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism.
  • Written procedures for the receipt and consideration of reports of noncomplaince at construction sites received from the public.
  • Construction site inspection procedures for inspecting public and private construction sites. The procedures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections.
  • Enforcement response procedures to compel compliance with the construction stormwater runoff control regulatory mechanism.
  • Documentation as described here.

Resources

Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.

Fact sheets and guidance documents

Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 4 - Construction Site Stormwater Control.

Documentation and tracking templates

Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Checklists

Below are methods that local stormwater staff are currently using to meet the site inspection and site plan review documentation requirements in the MS4 General Permit for MCM 4 - Construction Site Stormwater Control.

Example Procedures

Example procedures are those that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Model language

Fill in the blanks and adopt ordinance language that meets the regulatory mechanism requirements for MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Other

Miscellaneous materials local stormwater staff are using.