==='''Construction and Maintenance Costs'''===
 
 
General [[Process for selecting Best Management Practices#Using cost factors to select BMPs|cost etimation]] methods can be used by site planners to compare the relative construction and maintenance costs for structural BMPs. However, it is recommended that construction and maintenance budgets should be based on site specific information. Once the construction plans are created, designers could use the table below and the cost estimation worksheet. The table below lists the site components that are specific to bioretention practices. Not included in this table are those cost items that are common to all construction projects, such as mobilization, traffic control, erosion and sediment control, permitting, etc.  
 
General [[Process for selecting Best Management Practices#Using cost factors to select BMPs|cost etimation]] methods can be used by site planners to compare the relative construction and maintenance costs for structural BMPs. However, it is recommended that construction and maintenance budgets should be based on site specific information. Once the construction plans are created, designers could use the table below and the cost estimation worksheet. The table below lists the site components that are specific to bioretention practices. Not included in this table are those cost items that are common to all construction projects, such as mobilization, traffic control, erosion and sediment control, permitting, etc.  
  
{{:Recommended maintenance activities for bioretention areas}}
+
{{:Cost components for bioretention practices}}

Revision as of 20:21, 20 February 2013

General cost etimation methods can be used by site planners to compare the relative construction and maintenance costs for structural BMPs. However, it is recommended that construction and maintenance budgets should be based on site specific information. Once the construction plans are created, designers could use the table below and the cost estimation worksheet. The table below lists the site components that are specific to bioretention practices. Not included in this table are those cost items that are common to all construction projects, such as mobilization, traffic control, erosion and sediment control, permitting, etc.

This table shows cost Components for Bioretention Practices
(Link to this table)

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Clearing & grubbing Clearing Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Clearing Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Site Formation Excavation / grading 4-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away) Soil & rock fill material, tunneling
Structural Components Under-drains Under-drain cost ($/lineal foot) x length of device Pipes, catch-basins, manholes, valves
Inlet structure ($/structure) or ($/curb cut) Pipes, catch-basins, manholes, valves
Outlet structure ($/structure) Pipes, catch-basins, manholes, valves
Liner Liner cost ($/square yard) x area of device) Pipes, catch-basins, manholes, valves
Site Restoration Filter strip Sod cost ($/square foot) x filter strip area Tree protection, soil amendments, seed bed preparation, trails
Soil preparation Topsoil or amendment cost ($/acre) x Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Seeding Seeding Cost ($/acre) x Seeded Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency Vegetation maintenance, cleaning of structures
Weed control Labor cost ($/hour) x Hours per visit x Frequency Vegetation maintenance, cleaning of structures
Inspection Inspection Cost ($) x Inspection Frequency Vegetation maintenance, cleaning of structures
Mowing Mowing Cost ($) x Mowing Frequency Vegetation maintenance, cleaning of structures