Line 36: | Line 36: | ||
*Barr Engineering Company. (2006). [http://www.burnsville.org/DocumentCenter/View/450/Rain-Garden-Project-Summary-2006?bidId= Rain Garden Project Summary]. Retrieved February 5, 2019, from City of Burnsville | *Barr Engineering Company. (2006). [http://www.burnsville.org/DocumentCenter/View/450/Rain-Garden-Project-Summary-2006?bidId= Rain Garden Project Summary]. Retrieved February 5, 2019, from City of Burnsville | ||
*Land and Water Magazine. (2004, September). [http://www.landandwater.com/features/vol48no5/vol48no5_2.html Burnsville Rainwater Gardens]. Land and Water Magazine, 48(5), p. 47. Retrieved February 5, 2019, from Land and Water Magazine | *Land and Water Magazine. (2004, September). [http://www.landandwater.com/features/vol48no5/vol48no5_2.html Burnsville Rainwater Gardens]. Land and Water Magazine, 48(5), p. 47. Retrieved February 5, 2019, from Land and Water Magazine | ||
+ | |||
+ | ===City of Fridley - Rock-lined filter strip pretreatment=== | ||
+ | *Location: 3rd St. NE, Fridley, Minnesota | ||
+ | *Owners: City of Fridley, Mississippi Watershed Management Organization | ||
+ | *Designer: Wenck Associates/City of Fridley/Minnesota Nice | ||
+ | *Contractor: Minnesota Nice | ||
+ | *Year of Completion: 2017 | ||
+ | *Pretreatment Practice: Filtration and settling | ||
+ | *Practice Description: Rock Filter Strip | ||
+ | *Design Features: The design filters stormwater runoff before entering bioswale to minimize erosion risk and filter out and settle sediment. | ||
+ | *Downstream BMP Benefitting from Pretreatment: Bioswale | ||
+ | *Total Drainage Area and Land Use: Approximately 3 acres total (residential) | ||
+ | *Construction Cost: $27,900 | ||
+ | *Documented Maintenance Practices: Annual removal of trash and sediment. Plants replaced as needed. | ||
+ | *Pollutant Removal: Sediment/nutrients, trash | ||
+ | *Is the Site Publicly Accessible: Yes | ||
+ | *Contact: Marcy Bean, Mississippi Watershed Management Organization (mbean@mwmo.org); Jon Lennander, City of Fridley (jon.lennander@fridleymn.gov) | ||
+ | |||
+ | ====Design summary==== | ||
+ | In 2017, the City of Fridley used grant money from the Mississippi Watershed Management Organization (MWMO) to retrofit curb bump-outs with bioswales to treat stormwater runoff and provide multiple benefits (e.g., traffic control, stormwater treatment, and improved aesthetics) to the neighborhood. Rock-lined filter strips provide pretreatment at the curb cutout before stormwater entered the bioswale (Figure 3). The rock filter strip treats stormwater runoff that enters the bioswale by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling (Figure 4). This design reduces the TSS load to the bioswale, which allows the bioswale to function as designed and minimize costly maintenance. | ||
+ | |||
+ | <gallery caption="Images of rock filter strip" widths="140px"> | ||
+ | File:Fridley figure 1.png|alt=rock filter strip image|Rock Filter Strip at Curb Cut Bioswale Installed Along 3rd Street [City of Fridley, 2018] | ||
+ | File:Fridley figure 2.png|alt=rock filter strip image|Rock Filter Strip Treating Stormwater Runoff [MWMO, 2019] | ||
+ | File:Fridley figure 3.png|alt=rock filter strip image|Rock-Inlet and Bioswale During Heavy Event (City of Fridley) | ||
+ | File:Fridley figure 6.png|alt=rock filter strip image|Sediment Collected at Rock Inlet Pretreatment System on August 27, 2018 (City of Fridley) | ||
+ | </gallery> | ||
+ | |||
+ | ====Maintenance==== | ||
+ | The City of Fridley inspects the rock-lined filter strips and bioswales annually and relocate existing rock, add rock when needed, and inspect for buried rocks that may be causing damming at the inlet. If damming at the inlet is observed, the rock-lined filter strip can be cleaned, replaced, or an inlet structure can be added. | ||
+ | |||
+ | ====Lessons learned==== | ||
+ | *Only bid to contractors with demonstrated similar experience. | ||
+ | *Blocked inlets can cause stormwater to bypass the basin. | ||
+ | *Initial rocks in filter strips were too small, which resulted in rocks getting carried into the bioswale during larger rain events. Larger rocks were used to avoid this problem moving forward. Through trial-and-error the appropriate rock size was determined to be Class I riprap (3 – 6 inches in diameter). | ||
+ | *Regular maintenance has prolonged lifespan and function | ||
+ | *Delegating maintenance responsibilities to contractor results in more consistent maintenance and ultimately better results compared to resident-driven projects. The City of Fridley added three years of maintenance to the contractor’s responsibility to ensure maintenance is conducted and done correctly. | ||
+ | |||
+ | ====References==== | ||
+ | *City of Fridley. (2018, January). [http://www.ci.fridley.mn.us/DocumentCenter/View/4186/Community-Connection-JanuaryFebruary-2018 Fridley Community Connection]. Retrieved February 15, 2019, from City of Fridley | ||
+ | *Mississippi Watershed Management Organization. (no date). [https://www.mwmo.org/projects/fridley-street-reconstruction/ Fridley Street Reconstruction]. Retrieved February 5, 2019 from Mississippi Watershed Management Organization | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
==Project Name== | ==Project Name== |
In 2002, the City of Burnsville worked with Barr Engineering to design rain gardens in a residential neighborhood surrounding Crystal Lake to reduce the pollutant runoff into the lake. Using city funding and a grant from the Metropolitan Council, 17 raingardens were installed along a street near Lake Crystal (Figure 1) as part of a stormwater retrofit study [Land and Water Magazine, 2004]. Vegetated filter strips provide stormwater pretreatment between the curb cutout and rain garden (Figure 2). The vegetated filter strip treats stormwater runoff that enters the raingarden by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling into the vegetation. This design reduces the total suspended solids (TSS) load to the rain garden and allows the rain garden to function as designed and minimize costly maintenance that results from sedimentation.
The homeowners are responsible for performing routine maintenance such as weeding, raking, and removal of accumulated sediment for the filter strips and rain gardens. The elevation of the filter strip increases over time because of solids settling into the vegetation, so the City of Burnsville has removed the vegetated filter strips, removed the sediment, and replaced the filter strips every five to seven years. Over the 15-year lifespan of the project, filter strips have been replaced twice by the city.
In 2017, the City of Fridley used grant money from the Mississippi Watershed Management Organization (MWMO) to retrofit curb bump-outs with bioswales to treat stormwater runoff and provide multiple benefits (e.g., traffic control, stormwater treatment, and improved aesthetics) to the neighborhood. Rock-lined filter strips provide pretreatment at the curb cutout before stormwater entered the bioswale (Figure 3). The rock filter strip treats stormwater runoff that enters the bioswale by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling (Figure 4). This design reduces the TSS load to the bioswale, which allows the bioswale to function as designed and minimize costly maintenance.
The City of Fridley inspects the rock-lined filter strips and bioswales annually and relocate existing rock, add rock when needed, and inspect for buried rocks that may be causing damming at the inlet. If damming at the inlet is observed, the rock-lined filter strip can be cleaned, replaced, or an inlet structure can be added.
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice
Narrative description of pretreatment project
The total contributing drainage area to the Preserver was 242 acres, with 8 acres of direct drainage area. An estimated 30% of the direct drainage area to the Preserver was impervious (2.4 acres). The land use of the contributing drainage area was residential, with a mature tree canopy.
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
The mature tree canopy in the contributing drainage area contributed to heavy organic loads, including large debris. The total captured material would likely be greater with more frequent cleaning of the system - the sump was full approximately halfway through the monitoring period.
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice