Line 78: | Line 78: | ||
*Mississippi Watershed Management Organization. (no date). [https://www.mwmo.org/projects/fridley-street-reconstruction/ Fridley Street Reconstruction]. Retrieved February 5, 2019 from Mississippi Watershed Management Organization | *Mississippi Watershed Management Organization. (no date). [https://www.mwmo.org/projects/fridley-street-reconstruction/ Fridley Street Reconstruction]. Retrieved February 5, 2019 from Mississippi Watershed Management Organization | ||
+ | ==Forebays== | ||
+ | ===City of South St. Paul - Seidl's Lake stormwater retrofit=== | ||
+ | [[File:SS Paul figure1.png|300px|thumb|alt=schematic for forebay|<font size=3>Seidl's Lake Forebay Subwatershed Area (Dakota County Soil and Water Conservation District)</font size>]] | ||
+ | *Location: 1415 4th Street South, South St. Paul, Minnesota | ||
+ | *Owner: City of South St. Paul | ||
+ | *Designer: Dakota County Soil and Water Conservation District | ||
+ | *Contractor: G.L. Contracting | ||
+ | *Year of Completion: 2012 | ||
+ | *Pretreatment Practice: Turfstone forebay | ||
+ | *Design Features: The design includes sediment forebay with level spreaders. | ||
+ | *Downstream BMP and receiving water benefitting from pretreatment: Iron-enhanced sand filter and Seidl’s Lake | ||
+ | *Total Drainage Area and Land Use: 15.5 acres (residential) | ||
+ | *Impervious Drainage Area: 5.68 acres | ||
+ | *Is the Site Publicly Accessible: Yes | ||
+ | *Contact & Email: Joe Barten (joe.barten@co.dakota.mn.us) | ||
+ | ====Design summary==== | ||
+ | [[File:SS Paul figure 2.png|300px|thumb|left|alt=forebay image|<font size=3>Turfstone Pavers at the Bottom of Seidel’s Lake Park Forebay and Biofiltration Cell Following Construction (Dakota County Soil and Water Conservation District)</font size>]] | ||
+ | [[File:SS Paul figure 3.png|300px|thumb|alt=profile view forebay|<font size=3>Profile View of Turfstone Pavers and Forebay Design. Click on image to enlarge.</font size>]] | ||
+ | [[File:SS Paul figure 4.jpg|300px|thumb|left|alt=forebay image|<font size=3>Pretreatment Cell in 2016 Before Cleanout (Dakota County Soil and Water Conservation District)</font size>]] | ||
+ | |||
+ | The Seidl’s Lake Park was an area for potential stormwater improvements identified in the City of South St. Paul’s Comprehensive Stormwater Management Plan, developed to improve the water quality within the city (City of South St. Paul, 2012). In partnership with the Dakota County Soil and Water Conservation District, an iron-enhanced sand filter and pretreatment forebay were designed to improve water quality in Seidl’s Lake by treating an untreated 15.5-acre subwatershed. | ||
+ | |||
+ | ====Maintenance==== | ||
+ | In 2016, the pretreatment cell was excavated and found to have accumulated 6 cubic yards of sediment and organic materials. | ||
+ | |||
+ | ====Lessons learned==== | ||
+ | *The turfstone and weir design is successfully capturing large amounts of sediment. | ||
+ | *It is uncertain whether surface ponding in the pre-treatment area is due to underlying soils or caking of sediment at turfstone and fabric interface. | ||
+ | *With future forebay designs, particularly in areas with poor or compacted soils, consider including underdrains beneath the pretreatment cell which could help facilitate proper drainage and reduce surface ponding. | ||
+ | *With future forebay designs, could consider raising the elevation of the pretreatment area relative to the basin and installing screened leveling pipes that connect to the basin to reduce ponding in forebay. | ||
+ | *Consider manually vacuuming out turfstone to remove layer of fine sediment at paver surface and replace with washed sand during regular maintenance. | ||
+ | |||
+ | ====References==== | ||
+ | *City of South St. Paul. (2012, January). [https://mn-southstpaul.civicplus.com/DocumentCenter/View/80/STORMWATER-MANAGEMENT-PLAN?bidId= Stormwater Management Plan]. Retrieved March 7, 2019, from City of South St. Paul | ||
+ | *Dakota County Soil and Water Conservation District. (2013, January 23). [https://gis.co.dakota.mn.us/content/SWCDdata/FACTSHEETS/12-CCP-002%20Seidls%20Retrofit.pdf Seidls Retrofit]. Retrieved March 07, 2019, from Dakota County Soil and Water Conservation District | ||
In 2002, the City of Burnsville worked with Barr Engineering to design rain gardens in a residential neighborhood surrounding Crystal Lake to reduce the pollutant runoff into the lake. Using city funding and a grant from the Metropolitan Council, 17 raingardens were installed along a street near Lake Crystal (Figure 1) as part of a stormwater retrofit study [Land and Water Magazine, 2004]. Vegetated filter strips provide stormwater pretreatment between the curb cutout and rain garden (Figure 2). The vegetated filter strip treats stormwater runoff that enters the raingarden by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling into the vegetation. This design reduces the total suspended solids (TSS) load to the rain garden and allows the rain garden to function as designed and minimize costly maintenance that results from sedimentation.
The homeowners are responsible for performing routine maintenance such as weeding, raking, and removal of accumulated sediment for the filter strips and rain gardens. The elevation of the filter strip increases over time because of solids settling into the vegetation, so the City of Burnsville has removed the vegetated filter strips, removed the sediment, and replaced the filter strips every five to seven years. Over the 15-year lifespan of the project, filter strips have been replaced twice by the city.
In 2017, the City of Fridley used grant money from the Mississippi Watershed Management Organization (MWMO) to retrofit curb bump-outs with bioswales to treat stormwater runoff and provide multiple benefits (e.g., traffic control, stormwater treatment, and improved aesthetics) to the neighborhood. Rock-lined filter strips provide pretreatment at the curb cutout before stormwater entered the bioswale (Figure 3). The rock filter strip treats stormwater runoff that enters the bioswale by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling (Figure 4). This design reduces the TSS load to the bioswale, which allows the bioswale to function as designed and minimize costly maintenance.
The City of Fridley inspects the rock-lined filter strips and bioswales annually and relocate existing rock, add rock when needed, and inspect for buried rocks that may be causing damming at the inlet. If damming at the inlet is observed, the rock-lined filter strip can be cleaned, replaced, or an inlet structure can be added.
The Seidl’s Lake Park was an area for potential stormwater improvements identified in the City of South St. Paul’s Comprehensive Stormwater Management Plan, developed to improve the water quality within the city (City of South St. Paul, 2012). In partnership with the Dakota County Soil and Water Conservation District, an iron-enhanced sand filter and pretreatment forebay were designed to improve water quality in Seidl’s Lake by treating an untreated 15.5-acre subwatershed.
In 2016, the pretreatment cell was excavated and found to have accumulated 6 cubic yards of sediment and organic materials.
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice
Narrative description of pretreatment project
The total contributing drainage area to the Preserver was 242 acres, with 8 acres of direct drainage area. An estimated 30% of the direct drainage area to the Preserver was impervious (2.4 acres). The land use of the contributing drainage area was residential, with a mature tree canopy.
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
The mature tree canopy in the contributing drainage area contributed to heavy organic loads, including large debris. The total captured material would likely be greater with more frequent cleaning of the system - the sump was full approximately halfway through the monitoring period.
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice