*Dakota County Soil and Water Conservation District. (2013, January 23). [https://gis.co.dakota.mn.us/content/SWCDdata/FACTSHEETS/12-CCP-002%20Seidls%20Retrofit.pdf Seidls Retrofit]. Retrieved March 07, 2019, from Dakota County Soil and Water Conservation District | *Dakota County Soil and Water Conservation District. (2013, January 23). [https://gis.co.dakota.mn.us/content/SWCDdata/FACTSHEETS/12-CCP-002%20Seidls%20Retrofit.pdf Seidls Retrofit]. Retrieved March 07, 2019, from Dakota County Soil and Water Conservation District | ||
+ | ===City of Savage - Bluff Haven wet pond forebay=== | ||
+ | *Location: Hillsboro Avenue and McColl Drive, Savage, Minnesota | ||
+ | *Owner: City of Savage | ||
+ | *Designer: Westwood Professional Services | ||
+ | *Contractor: John Arthur Homes | ||
+ | *Year of Completion: 2018 | ||
+ | *Pretreatment Practice: Sump manhole, baffle, and wet forebay | ||
+ | *Practice Description: Sump manhole and St. Anthony Falls Laboratory (SAFL) baffle (or equivalent) with wet pond forebay treat stormwater runoff prior to discharge into an infiltration basin. | ||
+ | *Design Features: The design includes a sump manhole with SAFL baffle and a wet pond forebay which provides a treatment train approach to stormwater pretreatment. First, the SAFL Baffle retains sands and trash, then the forebay retains most of the silts and smaller organic material, prior to the stormwater entering the infiltration basin where the relatively clean water is infiltrated. | ||
+ | *Downstream BMP Benefitting from Pretreatment: Infiltration basin | ||
+ | *Total Drainage Area and Land Use: 6.8 acres, twin home development | ||
+ | *Total Impervious Area: 1.84 acre | ||
+ | *Is the Site Publicly Accessible: Yes | ||
+ | *Contact & Email: Jesse Carlson, City of Savage (JCarlson@ci.savage.mn.us) | ||
+ | ====Design summary==== | ||
+ | [[File:Savage figure 1.png|300px|thumb|alt=forebay image|<font size=4>Proposed Bluff Haven Stormwater Management Layout. The layout includes a sump manhole with SAFL baffle (red), wet pretreatment forebay (blue), and infiltration basin (yellow) [Scott County, RESPEC, Westwood Professional Services, 2019].</font size>]] | ||
+ | Water quality for the proposed 6.8-acre twin home development is provided by pretreatment and infiltration practices designed to infiltrate the water quality volume of 1.0 inch over the impervious area, utilizing an above ground infiltration basin and an underground infiltration rock trench. The pretreatment for the above ground infiltration basin is a wet basin with dead storage exceeding 25% of the water quality volume which is consistent with the Minnesota Stormwater Manual guidelines for pretreatment. Pretreatment of the underground infiltration rock trench is not required because only green space and disconnected roof runoff drains to the BMP [Westwood Professional Services, 2017]. | ||
+ | Site layout for the above ground infiltration basin and pretreatment is shown below, which treats approximately 4.4 acres of the proposed development. | ||
+ | ====Construction considerations==== | ||
+ | The stormwater BMP treatment train included an infiltration basin. Measures shall be taken during construction to protect this area during construction and after. Employ all appropriate erosion and sediment control BMPs and time the installation to prevent sediment from impacting the proposed infiltration basin. | ||
+ | ====Lessons learned==== | ||
+ | Steep bluff slopes and existing trees limited stormwater management locations due to City ordinance prohibiting disturbance of such areas during development. Care was taken to avoid concentrated flows down the bluff areas [City of Savage, 2017]. | ||
− | + | ====References==== | |
− | + | *City of Savage. (21 September 2017). [http://lfsrv2.cityofsavage.com/weblinkexternal/0/doc/177572/Page1.aspx Planning Commission Packet] for Thursday September 21, 2017. Accessed March 3, 2019. | |
− | + | *Westwood Professional Services, Inc. (2017 August 11). Preliminary Storm Water Runoff Narrative. Savage, MN. Prepared for John Arthur Homes. | |
− | + | *Westwood Professional Services, Inc. (2018 March 8). Construction Plans for Grading, Sanitary Sewer, Water Main, Storm Sewer, and Streets for Bluff Haven. Savage, MN. Prepared for John Arthur Homes | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Project Name== | ==Project Name== |
In 2002, the City of Burnsville worked with Barr Engineering to design rain gardens in a residential neighborhood surrounding Crystal Lake to reduce the pollutant runoff into the lake. Using city funding and a grant from the Metropolitan Council, 17 raingardens were installed along a street near Lake Crystal (Figure 1) as part of a stormwater retrofit study [Land and Water Magazine, 2004]. Vegetated filter strips provide stormwater pretreatment between the curb cutout and rain garden (Figure 2). The vegetated filter strip treats stormwater runoff that enters the raingarden by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling into the vegetation. This design reduces the total suspended solids (TSS) load to the rain garden and allows the rain garden to function as designed and minimize costly maintenance that results from sedimentation.
The homeowners are responsible for performing routine maintenance such as weeding, raking, and removal of accumulated sediment for the filter strips and rain gardens. The elevation of the filter strip increases over time because of solids settling into the vegetation, so the City of Burnsville has removed the vegetated filter strips, removed the sediment, and replaced the filter strips every five to seven years. Over the 15-year lifespan of the project, filter strips have been replaced twice by the city.
In 2017, the City of Fridley used grant money from the Mississippi Watershed Management Organization (MWMO) to retrofit curb bump-outs with bioswales to treat stormwater runoff and provide multiple benefits (e.g., traffic control, stormwater treatment, and improved aesthetics) to the neighborhood. Rock-lined filter strips provide pretreatment at the curb cutout before stormwater entered the bioswale (Figure 3). The rock filter strip treats stormwater runoff that enters the bioswale by dissipating the flow to minimize erosion and remove sediment from the runoff via filtration and settling (Figure 4). This design reduces the TSS load to the bioswale, which allows the bioswale to function as designed and minimize costly maintenance.
The City of Fridley inspects the rock-lined filter strips and bioswales annually and relocate existing rock, add rock when needed, and inspect for buried rocks that may be causing damming at the inlet. If damming at the inlet is observed, the rock-lined filter strip can be cleaned, replaced, or an inlet structure can be added.
The Seidl’s Lake Park was an area for potential stormwater improvements identified in the City of South St. Paul’s Comprehensive Stormwater Management Plan, developed to improve the water quality within the city (City of South St. Paul, 2012). In partnership with the Dakota County Soil and Water Conservation District, an iron-enhanced sand filter and pretreatment forebay were designed to improve water quality in Seidl’s Lake by treating an untreated 15.5-acre subwatershed.
In 2016, the pretreatment cell was excavated and found to have accumulated 6 cubic yards of sediment and organic materials.
Water quality for the proposed 6.8-acre twin home development is provided by pretreatment and infiltration practices designed to infiltrate the water quality volume of 1.0 inch over the impervious area, utilizing an above ground infiltration basin and an underground infiltration rock trench. The pretreatment for the above ground infiltration basin is a wet basin with dead storage exceeding 25% of the water quality volume which is consistent with the Minnesota Stormwater Manual guidelines for pretreatment. Pretreatment of the underground infiltration rock trench is not required because only green space and disconnected roof runoff drains to the BMP [Westwood Professional Services, 2017].
Site layout for the above ground infiltration basin and pretreatment is shown below, which treats approximately 4.4 acres of the proposed development.
The stormwater BMP treatment train included an infiltration basin. Measures shall be taken during construction to protect this area during construction and after. Employ all appropriate erosion and sediment control BMPs and time the installation to prevent sediment from impacting the proposed infiltration basin.
Steep bluff slopes and existing trees limited stormwater management locations due to City ordinance prohibiting disturbance of such areas during development. Care was taken to avoid concentrated flows down the bluff areas [City of Savage, 2017].
Narrative description of pretreatment project
Narrative description of contributing drainage area, including description of land use
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
Description of maintenance challenges, discussion of ease of maintenance
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice
Narrative description of pretreatment project
The total contributing drainage area to the Preserver was 242 acres, with 8 acres of direct drainage area. An estimated 30% of the direct drainage area to the Preserver was impervious (2.4 acres). The land use of the contributing drainage area was residential, with a mature tree canopy.
List of existing impairments and TMDLs that the BMP drains to
Discussion of why that particular pretreatment system was chosen for that project location, specific rationale (e.g., site characteristics, ease of maintenance, etc.)
Description of sizing criteria used to design pretreatment practice
Description of adverse site conditions/other construction challenges encountered during installation
List or description of types of maintenance practices used for the upkeep of the pretreatment system
The mature tree canopy in the contributing drainage area contributed to heavy organic loads, including large debris. The total captured material would likely be greater with more frequent cleaning of the system - the sump was full approximately halfway through the monitoring period.
Discussion of any additional maintenance considerations
Discussion of how the performance was measured or estimated
For proprietary practices, did were the manufacturer claims met?
Discussion of lessons learned through the implementation of this pretreatment practice