Line 8: | Line 8: | ||
|- | |- | ||
| '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document''' | | '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document''' | ||
− | *<i>Submit the SWPPP Document completed in accordance withn<br/>Section 12<i | + | *<i>Submit the SWPPP Document completed in accordance withn<br/>Section 12</i> |
| | | | ||
*Within 150 days after General Permit issuance<br/>date. | *Within 150 days after General Permit issuance<br/>date. | ||
|- | |- | ||
| '''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' | | '''Section 13. Stormwater Pollution Prevention Program (SWPPP)''' | ||
− | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.<i | + | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.</i> |
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | ||
Line 19: | Line 19: | ||
|'''Section 19. Construction Site Stormwater Runoff Control''' | |'''Section 19. Construction Site Stormwater Runoff Control''' | ||
*<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary | ||
− | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.<i | + | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.</i> |
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended | *Within 12 months of the date General Permit<br/>coverage is extended | ||
Line 26: | Line 26: | ||
|'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' | |'''Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations''' | ||
*<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | *<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. | ||
− | *Conduct pond and outfall inspections.<i | + | *Conduct pond and outfall inspections.</i> |
| | | | ||
*Each calendar year. | *Each calendar year. | ||
Line 33: | Line 33: | ||
| '''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | | '''Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA''' | ||
*<i>Submit all information required in item 22.2. | *<i>Submit all information required in item 22.2. | ||
− | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. <i | + | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22.</i> |
| | | | ||
*With each annual report. | *With each annual report. | ||
Line 40: | Line 40: | ||
|'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' | |'''Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping''' | ||
*<i>Conduct assessment of the SWPPP. | *<i>Conduct assessment of the SWPPP. | ||
− | *On a form provided by the Agency, submit an annual report<i | + | *On a form provided by the Agency, submit an annual report</i> |
| | | | ||
*Prior to completion of each annual report. | *Prior to completion of each annual report. |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|
Permit requirement | Schedule |
---|---|
Section 10. New Permittee Applicants
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 14. Mapping
|
|
Section 18. Illicit Discharge Detection and Elimination
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 20. Post-Construction Stormwater Management
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
|
Section 23. Alum or Ferric Chloride Phosphorus Treatment Systems (if applicable)
|
|
Section 25. Annual SWPPP Assessment, Annual Reporting, and Recordkeeping
|
|