Line 6: | Line 6: | ||
|- | |- | ||
| Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document | | Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document | ||
− | *Submit the SWPPP Document completed in accordance with<br/>Section 12 | + | *<i>Submit the SWPPP Document completed in accordance with<br/>Section 12 |
| | | | ||
*Within 150 days after General Permit issuance<br/>date. | *Within 150 days after General Permit issuance<br/>date. | ||
|- | |- | ||
| Section 13. Stormwater Pollution Prevention Program (SWPPP) | | Section 13. Stormwater Pollution Prevention Program (SWPPP) | ||
− | *Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. | + | *<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP. |
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below. | ||
|- | |- | ||
|Section 19. Construction Site Stormwater Runoff Control | |Section 19. Construction Site Stormwater Runoff Control | ||
− | *Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary. | + | *<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary. |
− | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. | + | *<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit. |
| | | | ||
*Within 12 months of the date General Permit<br/>coverage is extended. | *Within 12 months of the date General Permit<br/>coverage is extended. | ||
*Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | *Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023). | ||
|- | |- | ||
− | |Section 21. Pollution Prevention/Good Housekeeping for | + | |Section 21. Pollution Prevention/Good Housekeeping for<br/>Municipal Operations |
− | Municipal Operations | + | *<i>Conduct structural stormwater best management practice (BMP)<br/>inspections. |
− | *Conduct structural stormwater best management practice (BMP)<br/>inspections. | + | *<i>Conduct pond and outfall inspections |
− | *Conduct pond and outfall inspections | ||
| | | | ||
*Each calendar year. | *Each calendar year. | ||
Line 31: | Line 30: | ||
|- | |- | ||
|Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA | |Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA | ||
− | *Submit all information required in item 22.2. | + | *<i>Submit all information required in item 22.2. |
− | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. | + | *<i>Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22. |
| | | | ||
*With each annual report. | *With each annual report. | ||
Line 39: | Line 38: | ||
|- | |- | ||
|Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping | |Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping | ||
− | *Conduct assessment of the SWPPP. | + | *<i>Conduct assessment of the SWPPP. |
− | *On a form provided by the Agency, submit an annual report. | + | *<i>On a form provided by the Agency, submit an annual report. |
| | | | ||
*Prior to completion of each annual report. | *Prior to completion of each annual report. | ||
*By June 30th of each calendar year. | *By June 30th of each calendar year. | ||
|} | |} |
Permit requirement | Schedule |
---|---|
Section 12. Stormwater Pollution Prevention Program (SWPPP) Document
|
|
Section 13. Stormwater Pollution Prevention Program (SWPPP)
|
|
Section 19. Construction Site Stormwater Runoff Control
|
|
Section 21. Pollution Prevention/Good Housekeeping for Municipal Operations
|
|
Section 22. Discharges to Impaired Waters with a USEPA- Approved TMDL that includes an Applicable WLA
|
coverage is extended. |
Section 25. Annual Assessment, Annual Reporting, and Recordkeeping
|
|