Line 13: Line 13:
 
:c. structural stormwater BMPs that are part of the permittee's MS4; and
 
:c. structural stormwater BMPs that are part of the permittee's MS4; and
  
:d. all receiving waters'''.</big> [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]
+
:d. all receiving waters'''.[[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big>

Revision as of 16:59, 5 February 2021

Section 14 Mapping

14.1

Mapping. [Minn. R. 7090]

14.2

New permittees must develop, and existing permittees must update, as necessary, a storm sewer system map that depicts the following:

a. the permittee's entire MS4 as a goal, but at a minimum, all pipes 12 inches or greater in diameter, including stormwater flow direction in those pipes;
b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
c. structural stormwater BMPs that are part of the permittee's MS4; and
d. all receiving waters.[Minn. R. 7090]