|
|
Line 13: |
Line 13: |
| :c. structural stormwater BMPs that are part of the permittee's MS4; and | | :c. structural stormwater BMPs that are part of the permittee's MS4; and |
| | | |
− | :d. all receiving waters'''.</big> [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]] | + | :d. all receiving waters'''.[[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big> |
Revision as of 16:59, 5 February 2021
Section 14 Mapping
14.1
Mapping. [Minn. R. 7090]
14.2
New permittees must develop, and existing permittees must update, as necessary, a storm sewer system map that depicts the following:
- a. the permittee's entire MS4 as a goal, but at a minimum, all pipes 12 inches or greater in diameter, including stormwater flow direction in those pipes;
- b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
- c. structural stormwater BMPs that are part of the permittee's MS4; and
- d. all receiving waters.[Minn. R. 7090]