Line 68: | Line 68: | ||
The table below provides an overview and schedule of general maintenance activities. | The table below provides an overview and schedule of general maintenance activities. | ||
+ | |||
+ | <table> | ||
+ | <tr> | ||
+ | <th colspan=5>First Year of Operation | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <th>Activity | ||
+ | <th>Frequency | ||
+ | <th>Time Period | ||
+ | <th>Level of Effort | ||
+ | <th>O&M Benefit* | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Check that there is no ponding | ||
+ | <td>48 hours after event | ||
+ | <td>All year long | ||
+ | <td>1 hour | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect entire BMP after rainfall | ||
+ | <td>After any event greater than 0.5” | ||
+ | <td>All year long (or during area’s rain season) | ||
+ | <td>2-4 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Correct earthwork if inlet scouring or unwanted flow paths develop | ||
+ | <td>As needed | ||
+ | <td>All year long | ||
+ | <td>>4 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Spot reseed bare patches and eroding areas | ||
+ | <td>As needed | ||
+ | <td>First growing season | ||
+ | <td>2-4 hours | ||
+ | <td>3,4,5 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Supplemental watering during drier periods, particularly if keeping stormwater offline until plant seedlings are established. | ||
+ | <td>As needed | ||
+ | <td>Dry periods | ||
+ | <td>1-2 hours | ||
+ | <td>3,4,5 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Remove any stormwater diversion or barriers once seedlings are established. | ||
+ | <td>Once | ||
+ | <td>When plants are sufficiently established | ||
+ | <td>1-2 hours | ||
+ | <td>1,2,3,4,5 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect and remove invasive plants and weeds during plant community establishment | ||
+ | <td>Monthly | ||
+ | <td>First growing season | ||
+ | <td>1-2 hours | ||
+ | <td>5,6 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Mowing (dry swales) side slopes and/or grass filter strip to maintain 4-12” of height | ||
+ | <td>Seasonally | ||
+ | <td>As needed (do not interrupt any vegetative establishment) | ||
+ | <td>2-4 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <th colspan=5>After First Year of Operation | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <th>Activity | ||
+ | <th>Frequency | ||
+ | <th>Time Period | ||
+ | <th>Level of Effort | ||
+ | <th>O&M Benefit* | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Check that there is no ponding | ||
+ | <td>48 hours after event | ||
+ | <td>All year long | ||
+ | <td>1 hour | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect inlet/outlet structures for structural damage and clogging. | ||
+ | <td>Annually | ||
+ | <td>All year long | ||
+ | <td>1-2 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Correct earthwork if inlet scouring or unwanted flow paths develop | ||
+ | <td>As needed | ||
+ | <td>All year long | ||
+ | <td>>4 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Mowing (dry swales) side slopes and/or grass filter to maintain 4-12” of height | ||
+ | <td>Seasonally | ||
+ | <td>All year long | ||
+ | <td>2-4 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect for trash and debris | ||
+ | <td>Seasonally | ||
+ | <td>All year long | ||
+ | <td>2-4 hours | ||
+ | <td>1,5 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Check for evidence of clogging in the pre-treatment device and/or in the main treatment area. | ||
+ | <td>Biannually | ||
+ | <td>In spring and fall | ||
+ | <td>1-2 hours | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect and remove excess sediment in the pre-treatment device and/or in the main treatment area. | ||
+ | <td>Annually | ||
+ | <td>In spring (post- snowmelt) and fall | ||
+ | <td>4 hours if removal is needed | ||
+ | <td>1 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Inspect plant composition and health and replace as needed (maintain >95% vegetative cover) | ||
+ | <td>Biannually | ||
+ | <td>In fall or spring | ||
+ | <td>4 hours if plant replacement is needed | ||
+ | <td>4,5 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Prune and weed to maintain appearance and proper vegetative cover | ||
+ | <td>As needed | ||
+ | <td>Growing season | ||
+ | <td>1-2 hours | ||
+ | <td>4,5,6, | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <th colspan=5>After 5+ Years of Operation (non-routine maintenance) | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <th>Activity | ||
+ | <th>Frequency | ||
+ | <th>Time Period | ||
+ | <th>Level of Effort per Visit | ||
+ | <th>O&M Benefit* | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>After long term operation of the practice, some occasional and infrequent maintenance activities might be required, such as bigger repairs, soil regeneration, or redesign of key elements of the practice. | ||
+ | <td>As needed | ||
+ | <td>As needed | ||
+ | <td>Could be significant depending on the activity | ||
+ | <td>1,2,3,4,5,6 | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td colspan=5>Key to Maintenance Benefits: | ||
+ | *Proper stormwater flow and infiltration | ||
+ | *Creation and maintenance of wildlife habitat | ||
+ | *Creation and maintenance of pollinator habitat | ||
+ | *Nutrient cycling and storage | ||
+ | *Aesthetics and public enjoyment | ||
+ | *Carbon sequestration | ||
+ | </tr> | ||
+ | |||
+ | </table |
A grass or dry swale is a general term for filtration or infiltration conveyance practice, but there are a wide variety of designs depending on the site requirements. The key functions of swales are to convey water with reduced peak velocities and to perform water quality treatment with filtration and infiltration. Swales have the benefit of providing ecological function in areas dominated by development and impervious surface. These practices are ideal for urban settings, which creates an opportunity for humans to impact their function through vandalism, littering, and vehicular traffic.
These practices, like other green stormwater infrastructure, require regular maintenance to ensure proper and long-lasting ecosystem and stormwater function. If properly maintained, swales can operate effectively for 20-50 years, depending on the design type. Vegetated dry swales may perform properly for up to 50 years (Malvern Borough, 2013). The most frequently cited O&M concerns for swales include: *
The sections below describe best practices to prevent or minimize these common problems.
Swales, like other infiltration practices in urban areas, may be subject to higher public visibility, greater trash loads, pedestrian traffic, vandalism, and vehicular loads. Designers should design these practices in ways that prevent or minimize O&M issues. Examples include:
Designers should consult and include any local requirements regarding green infrastructure. O&M considerations often depend on whether the practice is located on public land, private land, or in the public right of way. For example, plantings in the public right of way that conflict with any traffic safety considerations could require increased O&M, such as pruning or complete removal. Swales are particularly subject to traffic considerations and regulations, given their frequent placement in public right-of-way.
The designer should also provide a site-specific O&M plan that includes the following:
For more information on design criteria for dry swale (grass swales).
Proper construction methods and sequencing play a significant role in reducing O&M problems. Some key items during the construction phase include:
Effective short and long-term performance of grass swales requires a dedicated and routine maintenance plan with clear guidelines, expectations, and schedules. Proper maintenance will not only increase the effectiveness of the swale at treating stormwater runoff, but will create a viable green space supporting ecological function. A maintenance plan clarifying maintenance responsibilities should be required for all practices.
Some important post-construction considerations are provided below along with recommended maintenance standards.
The table below provides an overview and schedule of general maintenance activities.
</tableFirst Year of Operation | ||||
---|---|---|---|---|
Activity | Frequency | Time Period | Level of Effort | O&M Benefit* |
Check that there is no ponding | 48 hours after event | All year long | 1 hour | 1 |
Inspect entire BMP after rainfall | After any event greater than 0.5” | All year long (or during area’s rain season) | 2-4 hours | 1 |
Correct earthwork if inlet scouring or unwanted flow paths develop | As needed | All year long | >4 hours | 1 |
Spot reseed bare patches and eroding areas | As needed | First growing season | 2-4 hours | 3,4,5 |
Supplemental watering during drier periods, particularly if keeping stormwater offline until plant seedlings are established. | As needed | Dry periods | 1-2 hours | 3,4,5 |
Remove any stormwater diversion or barriers once seedlings are established. | Once | When plants are sufficiently established | 1-2 hours | 1,2,3,4,5 |
Inspect and remove invasive plants and weeds during plant community establishment | Monthly | First growing season | 1-2 hours | 5,6 |
Mowing (dry swales) side slopes and/or grass filter strip to maintain 4-12” of height | Seasonally | As needed (do not interrupt any vegetative establishment) | 2-4 hours | 1 |
After First Year of Operation | ||||
Activity | Frequency | Time Period | Level of Effort | O&M Benefit* |
Check that there is no ponding | 48 hours after event | All year long | 1 hour | 1 |
Inspect inlet/outlet structures for structural damage and clogging. | Annually | All year long | 1-2 hours | 1 |
Correct earthwork if inlet scouring or unwanted flow paths develop | As needed | All year long | >4 hours | 1 |
Mowing (dry swales) side slopes and/or grass filter to maintain 4-12” of height | Seasonally | All year long | 2-4 hours | 1 |
Inspect for trash and debris | Seasonally | All year long | 2-4 hours | 1,5 |
Check for evidence of clogging in the pre-treatment device and/or in the main treatment area. | Biannually | In spring and fall | 1-2 hours | 1 |
Inspect and remove excess sediment in the pre-treatment device and/or in the main treatment area. | Annually | In spring (post- snowmelt) and fall | 4 hours if removal is needed | 1 |
Inspect plant composition and health and replace as needed (maintain >95% vegetative cover) | Biannually | In fall or spring | 4 hours if plant replacement is needed | 4,5 |
Prune and weed to maintain appearance and proper vegetative cover | As needed | Growing season | 1-2 hours | 4,5,6, |
After 5+ Years of Operation (non-routine maintenance) | ||||
Activity | Frequency | Time Period | Level of Effort per Visit | O&M Benefit* |
After long term operation of the practice, some occasional and infrequent maintenance activities might be required, such as bigger repairs, soil regeneration, or redesign of key elements of the practice. | As needed | As needed | Could be significant depending on the activity | 1,2,3,4,5,6 |
Key to Maintenance Benefits:
|