(Created page with "<font size=3>'''Expected performance for temporary vehicle tracking BMPs'''.</font size><br> Link to this table <tab...")
 
m
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<font size=3>'''Expected performance for temporary vehicle tracking BMPs'''.</font size><br>
+
<font size=3>'''Expected performance for stabilized earth/soil berms'''.</font size><br>
Link to this [[Expected performance for stabilized earth/soil berms |table]]
+
Link to this [[Expected performance for stabilized earth/soil berms|table]]
  
 
<table class="sortable">
 
<table class="sortable">
Line 6: Line 6:
 
<th colspan=2>Water quantity</th>
 
<th colspan=2>Water quantity</th>
 
</tr>
 
</tr>
<tr>
 
<td colspan=2></td>
 
 
<tr>
 
<tr>
 
<td>Flow attenuation</td>
 
<td>Flow attenuation</td>
Line 56: Line 54:
 
</table>
 
</table>
  
[[category:table]]
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Sediment control]]
 +
</noinclude>

Latest revision as of 13:20, 26 July 2022

Expected performance for stabilized earth/soil berms.
Link to this table

Water quantity
Flow attenuation Secondary design benefit
Runoff volume reduction Little or no design benefit
Water quality
Soil erosion Primary design benefit
Sediment control Primary design benefit
Nutrient loading Secondary design benefit
Pollutant removal
Total suspended solids Primary design benefit
Total phosphorus Secondary design benefit
Heavy metals Secondary design benefit
Floatables Little or no design benefit
Oil and grease Little or no design benefit

This page was last edited on 26 July 2022, at 13:20.