m
m
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<center><font size="3">'''Stormwater Wetland Design Criteria'''</font size><br>
+
<font size="3">'''Summary of wetland design criteria'''</font size><br>
Link to this [[Stormwater wetland design critera|table]]</center>
+
Link to this [[Stormwater wetland design criteria|table]]
 
<table class="sortable">
 
<table class="sortable">
 
<tr>
 
<tr>
Line 64: Line 64:
 
</table>
 
</table>
 
<font size="1">*Note: The ED Shallow Wetland design guidance does not meet the MPCA requirements for permanent volume. The guidance may be applied in a stormwater retrofit situation where area requirements preclude the use of a Shallow Wetland</font size>
 
<font size="1">*Note: The ED Shallow Wetland design guidance does not meet the MPCA requirements for permanent volume. The guidance may be applied in a stormwater retrofit situation where area requirements preclude the use of a Shallow Wetland</font size>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Ponds and wetlands (constructed)]]
 +
</noinclude>

Latest revision as of 13:35, 3 August 2022

Summary of wetland design criteria
Link to this table

Design Criteria Shallow Wetland Pond/Wetland ED Shallow Wetland*
Wetland/Watershed Ratio (Ac/Ac) 0.2 0.1 0.1
Minimum Drainage Area (Ac) 25 10 25
Length to Width Ratio (minimum)(ft/ft) 2:1 2:1 2:1
Extended Detention (ED) No Optional Yes
Allocation of Vwq (pool/marsh/ED) in % 25/75/0 70/30/0(includes pond volume) 25/25/50
Allocation of Surface Area (deepwater/low marsh/high marsh/semi-wet) in % 20/35/40/5 45/25/25/5 (includes pond surface area) 10/35/45/10
Forebay Required Required Required
Micropool Required Required Required
Outlet Configuration Reverse-slope pipe or hooded broad-crested weir Reverse-slope pipe or hooded broad-crested weir Reverse-slope pipe or hooded broad-crested weir