m |
m |
||
Line 15: | Line 15: | ||
<td>SNOUT</td> | <td>SNOUT</td> | ||
<td></td> | <td></td> | ||
− | <td>Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [ | + | <td>Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [https://www.estormwater.com/accessories/product/10993200/snout]</td> |
− | |||
<td></td> | <td></td> | ||
− | <td>Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated) | + | <td></td> |
+ | <td>Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated)</td> | ||
<td></td> | <td></td> | ||
</tr> | </tr> |
Other water quality devices - installation and maintenance recommendations
Link to this table
Device | Installation notes | Frequency of inspections | Maintenance checklist (link) | Permitted on private land/ Maintenance agreement recommended | Practices for minimizing sediment and trash buildup | Cost considerations (equipment needed and man hours) |
---|---|---|---|---|---|---|
SNOUT | Monthly for the first year, then annual inspection of anti-siphon vent and access hatch. If Bio-Skirt is used, check monthly [1] | Sediment removed from sump when it is half full. Trash and floatables removed when 6 in accumulates on surface. If Bio-Skirt is used, replace immediately after oil spill or when 2/3 of boom is submerged (nearly saturated) | ||||
Eliminator | Installs in minutes. Installation instructions here. [2] | After major storm events | Catch basin, hood, and filter (if used) cleaned annually [3] | |||
Floatable boom | Monthly and after major storm events | Frequent inspection and floatables removal. | ||||
Hood | Monthly and after major storm events | Frequent inspection and floatables removal. |