<center>'''Cost Components for Bioretention Practicesperformance'''</center>
+
<font size=3>'''This table shows cost Components for Bioretention Practices'''</font size><br>
(Link to this [[Cost components for bioretention practices|table]])<br>
+
(Link to this [[Cost components for bioretention practices|table]])
  
 
<table class="sortable" border=2>
 
<table class="sortable" border=2>
Line 25: Line 25:
 
<td>Removal of existing structures, topsoil removal and stockpiling</td>
 
<td>Removal of existing structures, topsoil removal and stockpiling</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td rowspan="2">Site Formation</td>
 
<td rowspan="2">Site Formation</td>
Line 58: Line 57:
 
<td>Pipes, catch-basins, manholes, valves</td>
 
<td>Pipes, catch-basins, manholes, valves</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td rowspan="4">Site Restoration</td>
 
<td rowspan="4">Site Restoration</td>
Line 72: Line 68:
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Seeding</td>
 
<td>Seeding</td>
Line 78: Line 73:
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Planting / transplanting</td>
 
<td>Planting / transplanting</td>
Line 84: Line 78:
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
<td>Tree protection, soil amendments, seed bed preparation, trails</td>
 
</tr>
 
</tr>
 
 
 
 
 
<tr>
 
<tr>
 
<td rowspan="5">Annual Operation, Maintenance, and Inspection</td>
 
<td rowspan="5">Annual Operation, Maintenance, and Inspection</td>
Line 114: Line 104:
 
<td>Vegetation maintenance, cleaning of structures</td>
 
<td>Vegetation maintenance, cleaning of structures</td>
 
</tr>
 
</tr>
 +
</table>
  
 
+
<noinclude>
</table>
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Bioretention]]
 +
</noinclude>

Latest revision as of 20:35, 3 August 2022

This table shows cost Components for Bioretention Practices
(Link to this table)

Implementation Stage Primary Cost Components Basic Cost Estimate Other Considerations
Site Preparation Tree & plant protection Protection Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Clearing & grubbing Clearing Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Topsoil salvage Clearing Cost ($/area) x Affected Area Removal of existing structures, topsoil removal and stockpiling
Site Formation Excavation / grading 4-ft Depth Excavation Cost ($/acre) x Area (acre) Soil & rock fill material, tunneling
Hauling material offsite Excavation Cost x (% of Material to be hauled away) Soil & rock fill material, tunneling
Structural Components Under-drains Under-drain cost ($/lineal foot) x length of device Pipes, catch-basins, manholes, valves
Inlet structure ($/structure) or ($/curb cut) Pipes, catch-basins, manholes, valves
Outlet structure ($/structure) Pipes, catch-basins, manholes, valves
Liner Liner cost ($/square yard) x area of device) Pipes, catch-basins, manholes, valves
Site Restoration Filter strip Sod cost ($/square foot) x filter strip area Tree protection, soil amendments, seed bed preparation, trails
Soil preparation Topsoil or amendment cost ($/acre) x Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Seeding Seeding Cost ($/acre) x Seeded Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Planting / transplanting Planting Cost ($/acre) x Planted Area (acre) Tree protection, soil amendments, seed bed preparation, trails
Annual Operation, Maintenance, and Inspection Debris removal Removal Cost ($/acre) x Area (acre) x Frequency Vegetation maintenance, cleaning of structures
Sediment removal Removal Cost ($/acre) x Area (acre) x Frequency Vegetation maintenance, cleaning of structures
Weed control Labor cost ($/hour) x Hours per visit x Frequency Vegetation maintenance, cleaning of structures
Inspection Inspection Cost ($) x Inspection Frequency Vegetation maintenance, cleaning of structures
Mowing Mowing Cost ($) x Mowing Frequency Vegetation maintenance, cleaning of structures