(Created page with "<font size=3>'''Inspection action recommendations (Source (adapted): [https://www3.epa.gov/npdes/pubs/pondmgmtguide.pdf USEPA Stormwater Wet Pond and Wetland Management Guideb...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <font size=3>'''Inspection action recommendations (Source (adapted): [https://www3.epa.gov/npdes/pubs/pondmgmtguide.pdf USEPA Stormwater Wet Pond and Wetland Management Guidebook] (USEPA, 2019). | + | <font size=3>'''Inspection action recommendations (Source (adapted): [https://www3.epa.gov/npdes/pubs/pondmgmtguide.pdf USEPA Stormwater Wet Pond and Wetland Management Guidebook] (USEPA, 2019).'''</font size><br> |
Link to this [[Inspection action recommendations|table]] | Link to this [[Inspection action recommendations|table]] | ||
Line 43: | Line 43: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Ponds and wetlands (constructed)]] | ||
+ | </noinclude> |
Inspection action recommendations (Source (adapted): USEPA Stormwater Wet Pond and Wetland Management Guidebook (USEPA, 2019).
Link to this table
Frequency Recommendation | Inspection items |
---|---|
Monthly to Quarterly or After Major Storms (>1”) |
|
Several Times per Hot/Warm Season | Inspect stormwater ponds for possible mosquito production |
Semi-annual to annual |
|
Every 1 to 3 years |
|
2 to 7 years | Monitor sediment deposition in facility and forebay |
5 to 25 years | Remote television inspection of reverse slope pipes, underdrains, and other hard to access piping |
This page was last edited on 6 August 2022, at 14:31.