Section 14 Mapping
14.1
Mapping. [Minn. R. 7090]
14.2
New permittees must develop, and existing permittees must update, as necessary, a storm sewer system map that depicts the following:
- a. the permittee's entire MS4 as a goal, but at a minimum, all pipes 12 inches or greater in diameter, including stormwater flow direction in those pipes;
- b. outfalls, including a unique identification (ID) number assigned by the permittee, and an associated geographic coordinates;
- c. structural stormwater BMPs that are part of the permittee's MS4; and
- d. all receiving waters. [Minn. R. 7090]