(21 intermediate revisions by 3 users not shown) |
Line 1: |
Line 1: |
| ==Appendix B. Schedules== | | ==Appendix B. Schedules== |
− | ===Table 2:*Existing Permittees - Schedule of permit requirements=== | + | |
− | {| class="wikitable"
| + | ==Examples of well implemented mulch stabilization practices== |
− | |- | + | <gallery caption="These are some examples where good mulch stabilization practices were used. Click on an image for more information." widths="180px"> |
− | ! Permit requirement !! Schedule
| + | File:Pet_waste_pickup.jpg|alt=mulch application |
− | |-
| + | File:Applying mulch 2.jpg|alt=mulch application |
− | | Section 12. Stormwater Pollution Prevention Program (SWPPP)
| + | File:Mulch stabilized slope 1.jpg|alt=mulch stabilized slope |
− | Document
| + | File:Mulch stabilized slope 2.jpg|alt=mulch stabilized slope |
− | *Submit the SWPPP Document completed in accordance with
| + | </gallery> |
− | Section 12
| + | |
− | | | + | |
− | *Within 150 days after General Permit issuance
| + | [https://stormwater.pca.state.mn.us/index.php?title=File:Model_Pet_Waste_Ordinance.docx Pet Waste Ordinance Model Language] |
− | date.
| + | |
− | |- | + | [[media:Model_Pet_Waste_Ordinance.docx|Pet waste ordinance]] |
− | | Section 13. Stormwater Pollution Prevention Program (SWPPP)
| + | |
− | *Complete revisions to incorporate the new requirements of
| + | |
− | Sections 14 - 23 into current SWPPP.
| + | |
− | | | + | [[Nick Test Page]] |
− | *Within 12 months of the date General Permit
| + | |
− | coverage is extended, unless other timelines have
| + | [[Category:Level 2 - General information, reference, tables, images, and archives/Reference]] |
− | been specifically established in the General Permit
| |
− | and identified below.
| |
− | |-
| |
− | |Section 19. Construction Site Stormwater Runoff Control
| |
− | *Complete revisions to Construction Site Stormwater Runoff
| |
− | Control program, including revisions to regulatory mechanism(s),
| |
− | if necessary.
| |
− | *When the CSW Permit is reissued, revise regulatory
| |
− | mechanism(s), if necessary, to be at least as stringent as the
| |
− | requirements for erosion, sediment, and waste controls described
| |
− | in the CSW Permit.
| |
− | |
| |
− | *Within 12 months of the date General Permit
| |
− | coverage is extended.
| |
− | *Within 12 months of the issuance date of the CSW
| |
− | Permit (expected issuance date of the CSW Permit
| |
− | is August 1, 2023).
| |
− | |- | |
− | |Section 21. Pollution Prevention/Good Housekeeping for
| |
− | Municipal Operations
| |
− | *Conduct structural stormwater best management practice (BMP)
| |
− | inspections.
| |
− | *Conduct pond and outfall inspections
| |
− | |
| |
− | *Each calendar year.
| |
− | *Prior to the expiration date of the General Permit.
| |
− | |-
| |
− | |Section 22. Discharges to Impaired Waters with a USEPAApproved TMDL that includes an Applicable WLA
| |
− | *Submit all information required in item 22.2.
| |
− | *Meet requirements for applicable WLAs for bacteria, chloride,
| |
− | and temperature in Section 22.
| |
− | |With each annual report.
| |
− | *Within 12 months of the date General Permit
| |
− | coverage is extended.
| |
− | |-
| |
− | |Section 25. Annual Assessment, Annual Reporting, and
| |
− | Recordkeeping
| |
− | *Conduct assessment of the SWPPP.
| |
− | *On a form provided by the Agency, submit an annual report.
| |
− | |
| |
− | *Prior to completion of each annual report.
| |
− | *By June 30th of each calendar year.
| |
− | |}
| |