|
|
(16 intermediate revisions by 3 users not shown) |
Line 1: |
Line 1: |
| ==Appendix B. Schedules== | | ==Appendix B. Schedules== |
− | ===<span style="color: black">'''Table 2:<br/>Existing Permittees - Schedule of permit requirements'''=== | + | |
− | {| class="wikitable" style = "background: transparent;"
| + | ==Examples of well implemented mulch stabilization practices== |
− | |-
| + | <gallery caption="These are some examples where good mulch stabilization practices were used. Click on an image for more information." widths="180px"> |
− | !style="text-align: left; background: transparent;"|'''<i>Permit requirement</i> !!style="text-align: left; background: transparent;"|'''<i>Schedule</i>
| + | File:Pet_waste_pickup.jpg|alt=mulch application |
− | |-
| + | File:Applying mulch 2.jpg|alt=mulch application |
− | | Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document
| + | File:Mulch stabilized slope 1.jpg|alt=mulch stabilized slope |
− | *Submit the SWPPP Document completed in accordance with<br/>Section 12
| + | File:Mulch stabilized slope 2.jpg|alt=mulch stabilized slope |
− | | | + | </gallery> |
− | *Within 150 days after General Permit issuance<br/>date.
| + | |
− | |- | + | |
− | | Section 13. Stormwater Pollution Prevention Program (SWPPP)
| + | [https://stormwater.pca.state.mn.us/index.php?title=File:Model_Pet_Waste_Ordinance.docx Pet Waste Ordinance Model Language] |
− | *Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.
| + | |
− | | | + | [[media:Model_Pet_Waste_Ordinance.docx|Pet waste ordinance]] |
− | *Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below.
| + | |
− | |-
| + | |
− | |Section 19. Construction Site Stormwater Runoff Control
| + | |
− | *Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),<br/>if necessary.
| + | [[Nick Test Page]] |
− | *When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.
| + | |
− | |
| + | [[Category:Level 2 - General information, reference, tables, images, and archives/Reference]] |
− | *Within 12 months of the date General Permit<br/>coverage is extended.
| |
− | *Within 12 months of the issuance date of the CSW<br/>Permit (expected issuance date of the CSW Permit<br/>is August 1, 2023).
| |
− | |-
| |
− | |Section 21. Pollution Prevention/Good Housekeeping for
| |
− | Municipal Operations
| |
− | *Conduct structural stormwater best management practice (BMP)<br/>inspections.
| |
− | *Conduct pond and outfall inspections
| |
− | |
| |
− | *Each calendar year.
| |
− | *Prior to the expiration date of the General Permit.
| |
− | |-
| |
− | |Section 22. Discharges to Impaired Waters with a USEPA-<br/>Approved TMDL that includes an Applicable WLA
| |
− | *Submit all information required in item 22.2.
| |
− | *Meet requirements for applicable WLAs for bacteria, chloride,<br/>and temperature in Section 22.
| |
− | |
| |
− | *With each annual report.
| |
− | *Within 12 months of the date General Permit
| |
− | coverage is extended.
| |
− | |-
| |
− | |Section 25. Annual Assessment, Annual Reporting, and<br/>Recordkeeping
| |
− | *Conduct assessment of the SWPPP.
| |
− | *On a form provided by the Agency, submit an annual report.
| |
− | |
| |
− | *Prior to completion of each annual report.
| |
− | *By June 30th of each calendar year.
| |
− | |}
| |