m |
m |
||
(12 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | #REDIRECT [[Construction specifications for infiltration ]] | ||
+ | |||
CADD based details for pond systems are contained in the section on [[CADD images for individual best management practices|drawings]]. The following details, with specifications, have been created for infiltration systems: | CADD based details for pond systems are contained in the section on [[CADD images for individual best management practices|drawings]]. The following details, with specifications, have been created for infiltration systems: | ||
*infiltration basin | *infiltration basin | ||
Line 7: | Line 9: | ||
==Construction specifications== | ==Construction specifications== | ||
Given that the construction of [[Glossary#I|infiltration]] practices incorporates techniques or steps which may be considered non-standard, it is ''RECOMMENDED'' that the construction specifications include the following format and information. | Given that the construction of [[Glossary#I|infiltration]] practices incorporates techniques or steps which may be considered non-standard, it is ''RECOMMENDED'' that the construction specifications include the following format and information. | ||
− | |||
===Temporary erosion control=== | ===Temporary erosion control=== | ||
Line 29: | Line 30: | ||
*Weed control | *Weed control | ||
*Watering of plant material | *Watering of plant material | ||
− | {{alert|It is REQUIRED that infiltration systems not be excavated to final grade until the contributing drainage area has been constructed and fully stabilized.|alert- | + | {{alert|It is REQUIRED that infiltration systems not be excavated to final grade until the contributing drainage area has been constructed and fully stabilized.|alert-danger}} |
− | ===Construction | + | ===Construction sequence scheduling=== |
*Temporary construction access | *Temporary construction access | ||
*Location of [[Glossary#S|silt fence]] installation to protect BMPs and downgradient [[Glossary#R|receiving waters]] | *Location of [[Glossary#S|silt fence]] installation to protect BMPs and downgradient [[Glossary#R|receiving waters]] | ||
Line 45: | Line 46: | ||
===Construction observation=== | ===Construction observation=== | ||
+ | |||
*Adherence to construction documents | *Adherence to construction documents | ||
*Verification of physical site conditions | *Verification of physical site conditions | ||
− | * | + | *Erosion control measures installed appropriately |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | <noinclude> | |
+ | ==Related pages== | ||
+ | *[[Overview for Infiltration trench]] | ||
+ | *[[Types of Infiltration trench]] | ||
+ | *[[Design criteria for Infiltration trench]] | ||
+ | *[[Construction specifications for Infiltration trench]] | ||
+ | *[[Operation and maintenance of Infiltration trench]] | ||
+ | *[[Assessing the performance of infiltration trenches and basins]] | ||
+ | *[[Cost-benefit considerations for Infiltration trench]] | ||
+ | *[[External resources for Infiltration trench ]] | ||
+ | *[[References for infiltration]] | ||
− | + | [[Category:Level 3 - Best management practices/Specifications and details/Construction specifications]] | |
− | + | </noinclude> | |
− | |||
− |
Redirect to:
CADD based details for pond systems are contained in the section on drawings. The following details, with specifications, have been created for infiltration systems:
Given that the construction of infiltration practices incorporates techniques or steps which may be considered non-standard, it is RECOMMENDED that the construction specifications include the following format and information.
This page was last edited on 11 December 2022, at 14:46.