m (→Related pages) |
|||
(11 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | {{alert|Information on operation and maintenance of stormwater wetlands has been updated. We recommend you utilize the information on the following page. | ||
+ | *[[Operation and maintenance (O&M) of stormwater treatment wetland practices]] | ||
+ | Eventually, this page will be redirected to the first link above.|alert-info}} | ||
+ | |||
==Overview== | ==Overview== | ||
− | |||
Maintenance is necessary for a stormwater wetland to operate as designed on a long-term basis. The pollutant removal, channel protection, and flood control capabilities of stormwater wetlands will decrease if: | Maintenance is necessary for a stormwater wetland to operate as designed on a long-term basis. The pollutant removal, channel protection, and flood control capabilities of stormwater wetlands will decrease if: | ||
− | + | *wetland pool elevations fluctuate dramatically; | |
− | * | + | *debris blocks the outlet structure; |
− | * | + | *pipes or the riser are damaged; |
− | * | + | *invasive plants out-compete the wetland plants; |
− | * | + | *sediment accumulates in the stormwater wetland, reducing the storage volume; |
− | * | + | *slope stabilizing and desirable wetland vegetation is lost; or |
− | * | + | *the structural integrity of the embankment, weir, or riser is compromised. |
− | * | ||
Stormwater wetland maintenance activities range in terms of the level of effort and expertise required to perform them. Routine stormwater wetland maintenance, such as mowing and removing debris or trash, is needed multiple times each year, but can be performed by citizen volunteers. More significant maintenance, such as removing accumulated sediment, is needed less frequently but requires more skilled labor and special equipment. Inspection and repair of critical structural features such as embankments and [[Glossary#R|risers]], needs to be performed by a qualified professional (e.g., structural engineer) that has experience in the construction, inspection, and repair of these features. | Stormwater wetland maintenance activities range in terms of the level of effort and expertise required to perform them. Routine stormwater wetland maintenance, such as mowing and removing debris or trash, is needed multiple times each year, but can be performed by citizen volunteers. More significant maintenance, such as removing accumulated sediment, is needed less frequently but requires more skilled labor and special equipment. Inspection and repair of critical structural features such as embankments and [[Glossary#R|risers]], needs to be performed by a qualified professional (e.g., structural engineer) that has experience in the construction, inspection, and repair of these features. | ||
− | ==Design | + | ==Design phase maintenance considerations== |
The following references may be consulted for more information on stormwater wetland maintenance: | The following references may be consulted for more information on stormwater wetland maintenance: | ||
Line 20: | Line 22: | ||
* GIC, 1999. [http://www.sustainabletechnologies.ca/Portals/_Rainbow/Documents/Storm%20Water%20Management%20Facility%20Sediment%20Maintenance%20Guide.pdf Storm Water Management Facility Sediment Maintenance Guide]. TheToronto and Region Conservation Authority, Ontario Ministry of the Environment SWAMP Program. By: Greenland International Consulting Inc. August 1999. | * GIC, 1999. [http://www.sustainabletechnologies.ca/Portals/_Rainbow/Documents/Storm%20Water%20Management%20Facility%20Sediment%20Maintenance%20Guide.pdf Storm Water Management Facility Sediment Maintenance Guide]. TheToronto and Region Conservation Authority, Ontario Ministry of the Environment SWAMP Program. By: Greenland International Consulting Inc. August 1999. | ||
− | Implicit in the design guidance in the previous sections, many design elements of stormwater wetland systems can minimize the maintenance burden and maintain pollutant removal efficiency. {{alert|Primarily, providing easy access (typically 8 feet wide) to stormwater wetlands for routine maintenance is ''Required''|alert-danger}} | + | Implicit in the design guidance in the previous sections, many design elements of stormwater wetland systems can minimize the maintenance burden and maintain pollutant removal efficiency. {{alert|Primarily, providing easy access (typically 8 feet wide) to stormwater wetlands for routine maintenance is ''Required''|alert-danger}} |
[[Mosquito control and stormwater management|Mosquito control]] is of particular concern in the case of stormwater wetlands. They can be designed, constructed and maintained to minimize the likelihood of being desirable habitat for mosquito populations, but no design will eliminate them completely. Designs that incorporate constant inflows and outflows, habitat for natural predators, and constant permanent pool elevations limit the conditions typical of mosquito breeding habitat. | [[Mosquito control and stormwater management|Mosquito control]] is of particular concern in the case of stormwater wetlands. They can be designed, constructed and maintained to minimize the likelihood of being desirable habitat for mosquito populations, but no design will eliminate them completely. Designs that incorporate constant inflows and outflows, habitat for natural predators, and constant permanent pool elevations limit the conditions typical of mosquito breeding habitat. | ||
− | ==Construction | + | ==Construction phase maintenance== |
The construction phase is another critical step where O&M issues can be minimized or avoided. | The construction phase is another critical step where O&M issues can be minimized or avoided. | ||
− | Inspections during construction are needed to ensure that the stormwater wetland is built in accordance with the approved design and standards and specifications. Detailed inspection checklists should be used that include sign-offs by qualified individuals at critical stages of construction, to ensure that the contractor’s interpretation of the plan is acceptable to the professional designer. | + | Inspections during construction are needed to ensure that the stormwater wetland is built in accordance with the approved design and standards and specifications. Detailed inspection checklists should be used that include sign-offs by qualified individuals at critical stages of construction, to ensure that the contractor’s interpretation of the plan is acceptable to the professional designer. An example construction phase inspection checklist is provided at [[Stormwater pond/ wetland - construction inspection checklist|this link]]. |
− | ==Post | + | ==Post construction operation and maintenance== |
Proper post-construction maintenance is important to the long-term performance of a stormwater wetland. Potential problems due to lack of maintenance include: | Proper post-construction maintenance is important to the long-term performance of a stormwater wetland. Potential problems due to lack of maintenance include: | ||
*A clogged outlet structure can increase water levels, killing vegetation and reducing the wetland’s ability to attenuate and store floods. Water quality can be compromised by not providing adequate storage time. | *A clogged outlet structure can increase water levels, killing vegetation and reducing the wetland’s ability to attenuate and store floods. Water quality can be compromised by not providing adequate storage time. | ||
Line 36: | Line 38: | ||
Some important post construction maintenance considerations are provided below. More detailed maintenance guidance can be found in the [http://www.stormwatercenter.net/Manual_Builder/Maintenance_Manual/pondwetlandguidebookdraft.pdf Stormwater Pond and Wetland Maintenance Guidebook] (CWP, 2004). | Some important post construction maintenance considerations are provided below. More detailed maintenance guidance can be found in the [http://www.stormwatercenter.net/Manual_Builder/Maintenance_Manual/pondwetlandguidebookdraft.pdf Stormwater Pond and Wetland Maintenance Guidebook] (CWP, 2004). | ||
− | + | {{alert|It is ''Required'' that a legally binding and enforceable maintenance agreement be executed between the practice owner and the local review authority.|alert-danger}} | |
*Adequate access must be provided for inspection, maintenance, and landscaping upkeep, including appropriate equipment and vehicles. It is '''Recommended''' that a maintenance right of way or easement extend to ponds from a public or private road. | *Adequate access must be provided for inspection, maintenance, and landscaping upkeep, including appropriate equipment and vehicles. It is '''Recommended''' that a maintenance right of way or easement extend to ponds from a public or private road. | ||
*It is '''Highly Recommended''' that stormwater wetlands be inspected annually during winter freeze periods to look for signs of improper operation. | *It is '''Highly Recommended''' that stormwater wetlands be inspected annually during winter freeze periods to look for signs of improper operation. | ||
Line 46: | Line 48: | ||
{{:Typical inspection/maintenance frequencies for stormwater wetlands}} | {{:Typical inspection/maintenance frequencies for stormwater wetlands}} | ||
+ | |||
+ | <noinclude> | ||
+ | ==Related pages== | ||
+ | *[[Overview for stormwater wetlands]] | ||
+ | *[[Types of stormwater wetlands]] | ||
+ | *[[Design criteria for stormwater wetlands]] | ||
+ | *[[Construction specifications for stormwater wetlands]] | ||
+ | *[[Assessing the performance of stormwater ponds|Assessing the performance of stormwater wetlands]] | ||
+ | *[[Operation and maintenance of stormwater wetlands]] | ||
+ | *[[Cost-benefit considerations for stormwater wetlands]] | ||
+ | *[[Calculating credits for stormwater wetlands]] | ||
+ | *[[References for stormwater wetlands]] | ||
+ | *[[Requirements, recommendations and information for using stormwater wetland as a BMP in the MIDS calculator.]] | ||
+ | |||
+ | [[Category:Level 3 - Best management practices/Specifications and details/Operation and maintenance]] | ||
+ | </noinclude> |
Maintenance is necessary for a stormwater wetland to operate as designed on a long-term basis. The pollutant removal, channel protection, and flood control capabilities of stormwater wetlands will decrease if:
Stormwater wetland maintenance activities range in terms of the level of effort and expertise required to perform them. Routine stormwater wetland maintenance, such as mowing and removing debris or trash, is needed multiple times each year, but can be performed by citizen volunteers. More significant maintenance, such as removing accumulated sediment, is needed less frequently but requires more skilled labor and special equipment. Inspection and repair of critical structural features such as embankments and risers, needs to be performed by a qualified professional (e.g., structural engineer) that has experience in the construction, inspection, and repair of these features.
The following references may be consulted for more information on stormwater wetland maintenance:
Implicit in the design guidance in the previous sections, many design elements of stormwater wetland systems can minimize the maintenance burden and maintain pollutant removal efficiency.
Mosquito control is of particular concern in the case of stormwater wetlands. They can be designed, constructed and maintained to minimize the likelihood of being desirable habitat for mosquito populations, but no design will eliminate them completely. Designs that incorporate constant inflows and outflows, habitat for natural predators, and constant permanent pool elevations limit the conditions typical of mosquito breeding habitat.
The construction phase is another critical step where O&M issues can be minimized or avoided.
Inspections during construction are needed to ensure that the stormwater wetland is built in accordance with the approved design and standards and specifications. Detailed inspection checklists should be used that include sign-offs by qualified individuals at critical stages of construction, to ensure that the contractor’s interpretation of the plan is acceptable to the professional designer. An example construction phase inspection checklist is provided at this link.
Proper post-construction maintenance is important to the long-term performance of a stormwater wetland. Potential problems due to lack of maintenance include:
Some important post construction maintenance considerations are provided below. More detailed maintenance guidance can be found in the Stormwater Pond and Wetland Maintenance Guidebook (CWP, 2004).
General maintenance activities and schedule are provided in the following table.
Typical inspection/maintenance frequencies for stormwater wetlands
Link to this table
Inspection Items | Maintenance Items | Frequency |
---|---|---|
|
Replant wetland vegetation | One time - After First Year |
|
|
Monthly to Quarterly or After Major Storms (>1”) |
|
|
Semi-annual to annual |
|
|
Every 1 to 3 years |
Monitor sediment deposition in facility and forebay | Forebay maintenance and sediment removal when needed | 2-7 years or 50% loss of sediment forebay storage |
Remote television inspection of reverse slope pipes, underdrains, and other hard to access piping |
|
5-25 years |
This page was last edited on 15 December 2022, at 02:57.