− | {{alert| | + | {{alert|This page is only applicable to Phase I MS4 permittees.|alert-danger}} |
− | The following is a quick guide to complete the [[Guidance for completing the TMDL | + | The following is a quick guide to complete the [[Phase I MS4 Guidance for completing the TMDL Annual report form#BMPs-activities completed worksheet|BMPs-Activities completed tab]]. |
==Gathering BMP information== | ==Gathering BMP information== | ||
STEP 1: Inventory BMPs that | STEP 1: Inventory BMPs that | ||
* are treating water discharged to waterbodies with an approved TMDL as indicated in your form | * are treating water discharged to waterbodies with an approved TMDL as indicated in your form | ||
− | * reduce | + | * reduce WLA in a TMDL project area |
* you described in your Compliance Schedule on your TMDL Attachment Spreadsheet at the time of application | * you described in your Compliance Schedule on your TMDL Attachment Spreadsheet at the time of application | ||
− | * have been operational since the baseline year of that TMDL but not prior to the baseline year | + | * have been operational since the [[Baseline year|baseline year]] of that TMDL but not prior to the baseline year |
* meet criteria for category 1 or category 2 BMP types | * meet criteria for category 1 or category 2 BMP types | ||
+ | <br /> | ||
STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area | STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area | ||
+ | <br /> | ||
STEP 3: Plot the location of inventoried BMPs for which you have geographic locations | STEP 3: Plot the location of inventoried BMPs for which you have geographic locations | ||
+ | <br /> | ||
STEP 4: Determine from which TMDL the BMPs reduce pollutants | STEP 4: Determine from which TMDL the BMPs reduce pollutants | ||
Line 21: | Line 24: | ||
[[file:City_a_activities1.PNG|thumb|left|alt=city_a_activities1|Step 5]] | [[file:City_a_activities1.PNG|thumb|left|alt=city_a_activities1|Step 5]] | ||
− | + | STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click [[Phase I MS4 Guidance for completing the TMDL Annual report form#Columns Q and beyond – TMDL Project with TMDL WLAs|here]]. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click [[Guidance for completing the TMDL | ||
[[file:City_a_activities2.PNG|thumb|left|alt=city_a_activities2|Step 6]] | [[file:City_a_activities2.PNG|thumb|left|alt=city_a_activities2|Step 6]] | ||
− | + | STEP 7: Complete columns H, I, J, and K if they did not autofill. These are ID number and locational coordinates for the rain garden (INF1). For guidance, click [[Phase I MS4 Guidance for completing the TMDL Annual report form#Column H – BMP ID|here]]. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | STEP 7: Complete columns H, I, J, and K if they did not autofill. These are ID number and locational coordinates for the rain garden (INF1). For guidance, click [[Guidance for completing the TMDL | ||
[[file:City_a_activities3.PNG|thumb|left|alt=city_a_activities1|Step 7]] | [[file:City_a_activities3.PNG|thumb|left|alt=city_a_activities1|Step 7]] | ||
− | + | STEP 8: Complete Columns L and M. From the dropdown in Column L select the owner/operator of the BMP. Column M autofills if you are the owner, otherwise enter the name of the owner/operator of the BMP. For guidance, click [[Phase I MS4 Guidance for completing the TMDL Annual report form#Column L – Who Owns this BMP/Activity?|here]]. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | STEP 8: Complete Columns L and M. From the dropdown in Column L select the owner/operator of the BMP. Column M autofills if you are the owner, otherwise enter the name of the owner/operator of the BMP. For guidance, click [[Guidance for completing the TMDL | ||
[[file:City_a_activities4.PNG|thumb|left|alt=city_a_activities1|Step 8]] | [[file:City_a_activities4.PNG|thumb|left|alt=city_a_activities1|Step 8]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
STEP 9: Complete Columns N and O if desired. This rain garden was installed and was operational in 2010. City A enters “2010” in Column N. No comments are added to Column O. | STEP 9: Complete Columns N and O if desired. This rain garden was installed and was operational in 2010. City A enters “2010” in Column N. No comments are added to Column O. | ||
[[file:City_a_activities5.PNG|thumb|left|alt=city_a_activities1|Step 9]] | [[file:City_a_activities5.PNG|thumb|left|alt=city_a_activities1|Step 9]] | ||
+ | STEP 10: Associate the BMP with TMDLs. City A determines that the rain garden is reducing pollutants draining to the Lake 2 Phosphorous TMDL. City A indicates this with an “X” in Column Q. For guidance, click [[Phase I MS4 Guidance for completing the TMDL Annual report form#Columns Q and beyond – TMDL Project with TMDL WLAs|here]]. | ||
+ | [[file:City_a_activities6.PNG|thumb|left|alt=city_a_activities1|Step 10]] | ||
− | + | [[Category:Level 3 - Regulatory/Municipal (MS4)/TMDLs]] | |
− | + | [[Category:Level 2 - Regulatory/Municipal (MS4)]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | [[ |
The following is a quick guide to complete the BMPs-Activities completed tab.
STEP 1: Inventory BMPs that
STEP 2: Identify the location of your MS4 in relation to watershed boundaries and the TMDL study area
STEP 3: Plot the location of inventoried BMPs for which you have geographic locations
STEP 4: Determine from which TMDL the BMPs reduce pollutants
Example data shown for a rain garden in City A, for more details see examples.
STEP 5: Enter the reporting year by using the drop down menu in column D. Columns A through C autofill.
STEP 6: In Column E, enter your first BMP, selecting the appropriate category from the dropdown box. Complete Column F (dropdown) if desired. For guidance, click here.
STEP 7: Complete columns H, I, J, and K if they did not autofill. These are ID number and locational coordinates for the rain garden (INF1). For guidance, click here.
STEP 8: Complete Columns L and M. From the dropdown in Column L select the owner/operator of the BMP. Column M autofills if you are the owner, otherwise enter the name of the owner/operator of the BMP. For guidance, click here.
STEP 9: Complete Columns N and O if desired. This rain garden was installed and was operational in 2010. City A enters “2010” in Column N. No comments are added to Column O.
STEP 10: Associate the BMP with TMDLs. City A determines that the rain garden is reducing pollutants draining to the Lake 2 Phosphorous TMDL. City A indicates this with an “X” in Column Q. For guidance, click here.