(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
− | The following are some frequently asked questions on how to fill out the [[Upload page with TMDL forms|TMDL Annual Reporting form]] for Municipal Separate Storm Sewer System (MS4) permittees for the 2013 General Permit. Additional information on this reporting requirement is available [[Guidance for completing the TMDL reporting form|here]]. | + | {{alert|This page is under development, pending the new MS4 Annual Reporting E-service.|alert-under-construction}} |
+ | |||
+ | <!--What follows is the guidance that was located on this page prior to 1/5/2023--> | ||
+ | <!--The following are some frequently asked questions on how to fill out the [[Upload page with TMDL forms|TMDL Annual Reporting form]] for Municipal Separate Storm Sewer System (MS4) permittees for the 2013 General Permit. Additional information on this reporting requirement is available [[Guidance for completing the TMDL reporting form|here]]. | ||
*'''Could we submit a single report for all permittees in a given TMDL project area that share a categorical WLA?''' | *'''Could we submit a single report for all permittees in a given TMDL project area that share a categorical WLA?''' | ||
Line 67: | Line 70: | ||
BMP 4: | BMP 4: | ||
− | No MS4 can take credit in either category for this BMP because it is constructed outside the TMDL study area. | + | No MS4 can take credit in either category for this BMP because it is constructed outside the TMDL study area.--> |
+ | |||
+ | [[Category:Level 3 - Regulatory/Municipal (MS4)/TMDLs]] | ||
+ | [[Category:Level 2 - Regulatory/Municipal (MS4)]] | ||
+ | [[Category:Level 3 - Regulatory/Municipal (MS4)/Guidance, outreach materials, miscellaneous information]] |
This page was last edited on 5 January 2023, at 17:16.