m
m
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{alert|This page and the Sections below are considered a guidance document to the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM and is not considered the official permit. A copy of the official permit and coverage letter will be emailed once the permit application has been completed and submitted to the MPCA. |alert-danger}}  
+
{{alert|This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.|alert-danger}}  
 
{{alert|This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the [https://www.pca.state.mn.us/business-with-us/construction-stormwater construction stormwater website] for the most up-to-date information.|alert-under-construction}}
 
{{alert|This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the [https://www.pca.state.mn.us/business-with-us/construction-stormwater construction stormwater website] for the most up-to-date information.|alert-under-construction}}
  
This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM  
+
This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.
  
 
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf 2023 Minnesota Construction Stormwater Permit - PDF]
 
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf 2023 Minnesota Construction Stormwater Permit - PDF]

Latest revision as of 20:56, 2 August 2023

Warning: This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.
This site is currently undergoing revision. For more information, open this link.
This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the construction stormwater website for the most up-to-date information.

This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.

Table of Contents

This page was last edited on 2 August 2023, at 20:56.